Screen 3: Manual Operation Screen. When Manual Operation is selected, a new screen appears which combines a Manual Control pane together with the Navigation and Visualization pane. The user is able to adjust the path of the robot and at the same visualize the path adjustments on the visualization pane. The Manual Motion control screen contains: • Virtual slider buttons for adjusting robot speed and thrust • Virtual buttons for activation/de-activation of functionalities • Connectivity with joysticks o Left joystick: Activate and control the locomotive propulsion mechanism backwards and forwards o Right joystick: Steering of the robot (up/down/left/right)
AutoNDA by SimpleDocs

Related to Screen 3: Manual Operation Screen

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • ANNUAL OPERATING PLAN Purchaser may be required to submit a written annual operating plan, as specified by, and at the request of the Forest Officer.

  • Utilization Scale STATE shall scale logs or portions of logs that are broken, wasted, or not removed by PURCHASER due to: (1) improper felling or bucking of the logs; (2) failure to remove the logs prior to deterioration; and (3) logs remaining on the timber sale area after completion of logging, provided the logs were merchantable prior to breakage or wastage. Material used to meet down material requirements in the section titled, "Reserved Timber," shall not be considered for utilization scale. PURCHASER shall pay for the logs at the contract price designated in Section 44. STATE shall notify PURCHASER of the volume of logs so scaled. Payment shall be considered due on such volume as if the logs were removed on the date of said notification. In the event PURCHASER disagrees with the findings made by STATE under this section, PURCHASER may furnish scaling by a third-party scaling organization acceptable to STATE. Costs and expenses of such third party shall be paid for by PURCHASER, and the findings of the third party shall be final.

  • Supplemental JBoss Software Conditions Software Access and Software Maintenance for Supplemental JBoss Software is intended and available for Development Purposes only and for up to 25 users for each 16 Core Band Subscription of Red Hat JBoss Middleware Software that you purchased. If you deploy or use the Supplemental JBoss Software for Production Purposes or for more than 25 users, you agree to purchase the appropriate Software Subscriptions for each Unit that you deploy or use. Red Hat’s Open Source Assurance Program applies only to the Red Hat JBoss Middleware Software Subscription that you purchased (such as Red Hat JBoss Enterprise Application Platform in the example above) and does not apply to Supplemental JBoss Software. JBoss xPaaS Subscriptions (defined below) are not considered Supplemental JBoss Software. Each installation and use of JBoss xPaaS Subscriptions Software for either Development Purposes or Production Purposes is a Unit and requires a paid Software Subscription.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Standard Work Week The standard work week shall be thirty-five (35) hours and is composed of five (5) consecutive standard work days.