Shi and Zhong’s MQKA protocol Sample Clauses

Shi and Zhong’s MQKA protocol. [9]: Shi and Zhong’s MQKA protocol takes qubit transmission at step 4 as a transmission round. The protocol should takes N rounds for transmission, and each round takes N transmissions, where N is number of participant. As a result, the total transmission number is N N = N 2.
AutoNDA by SimpleDocs
Shi and Zhong’s MQKA protocol. [9]: Shi and Zhong’s MQKA protocol only takes a Xxxx measurement for their key generating at last step of each round. Every participant takes a Xxxx measurement at a round and tell the measurement result to a participant for each round. Every Xxxx measurement should be counted 2 in a round. After N rounds, all participants can get the same key. As a result, the total transmission number is N×N×2, where the last 2 is that Xxxx measurement counting. −
Shi and Zhong’s MQKA protocol. [9]: Every participant of Shi and Zhong’s MQKA protocol takes N transmissions. And every transmission is inserted into 10 qubits for channel checking. As a result, the total qubits for channel checking are N × N × 10. − −
Shi and Zhong’s MQKA protocol. [9]: Shi and Zhong’s MQKA protocol should take N rounds for helping each participant to agree 2 bit key. After synchronization of each round, all participants can continue to the next 2 bit key. Every round should take a time unit. As a result, the total transmission delay is N time unit.

Related to Shi and Zhong’s MQKA protocol

  • COVID-19 Protocols Contractor will abide by all applicable COVID-19 protocols set forth in the District’s Reopening and COVID-19 Mitigation Plan and the safety guidelines for COVID-19 prevention established by the California Department of Public Health and the Ventura County Department of Public Health.

  • Information Technology Accessibility Standards Any information technology related products or services purchased, used or maintained through this Grant must be compatible with the principles and goals contained in the Electronic and Information Technology Accessibility Standards adopted by the Architectural and Transportation Barriers Compliance Board under Section 508 of the federal Rehabilitation Act of 1973 (29 U.S.C. §794d), as amended. The federal Electronic and Information Technology Accessibility Standards can be found at: xxxx://xxx.xxxxxx-xxxxx.xxx/508.htm.

  • Protocol No action to coerce or censor or penalize any negotiation participant shall be made or implied by any other member as a result of participation in the negotiation process.

  • Information Technology Enterprise Architecture Requirements If this Contract involves information technology-related products or services, the Contractor agrees that all such products or services are compatible with any of the technology standards found at xxxxx://xxx.xx.xxx/iot/2394.htm that are applicable, including the assistive technology standard. The State may terminate this Contract for default if the terms of this paragraph are breached.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Protocols Each party hereby agrees that the inclusion of additional protocols may be required to make this Agreement specific. All such protocols shall be negotiated, determined and agreed upon by both parties hereto.

  • NYS OFFICE OF INFORMATION TECHNOLOGY SERVICES NOTIFICATION All New York State Agencies must notify the Office of Information Technology Services of any and all plans to procure IT and IT -related products, materials and services meeting required thresholds defined in Technology Policy NYS–P08-001: xxxxx://xxx.xx.xxx/sites/default/files/documents/NYS-P08-001.pdf, as may be amended, modified or superseded. SALES REPORTING REQUIREMENTS Contractor shall furnish OGS with quarterly sales reports utilizing Appendix I - Report of Contract Sales. Purchases by Non- State Agencies, political subdivisions and others authorized by law shall be reported in the same report and indicated as required. All fields of information shall be accurate and complete. OGS reserves the right to unilaterally make revisions, changes and/or updates to Appendix I - Report of Contract Sales or to require sales to be reported in a different format without processing a formal amendment and/or modification. Further, additional related sales information and/or detailed Authorized User purchases may be required by OGS and must be supplied upon request. Reseller Sales Product sold through Reseller(s) must be reported by Contractor in the required Appendix I – Report of Contract Sales. Due Date The Appendix I - Report of Contract Sales will be quarterly (January - March, April - June, July - September and October - December). Reports will be due 1 month after the closing quarter. SERVICE REPORTS FOR MAINTENANCE/SUPPORT AND WARRANTY WORK Service Reports for Authorized User An Authorized User in an RFQ may require compliance with any or all of this section. If requested by the Authorized User, the Contractor shall furnish the Authorized User with service reports for all Maintenance/support and warranty work upon completion of the services. The service reports may include the following information in either electronic or hard copy form as designated by the Authorized User:  Date and time Contractor was notified  Date and time of Contractor’s arrival  Make and model of the Product  Description of malfunction reported by Authorized User  Diagnosis of failure and/or work performed by Contractor  Date and time failure was corrected by Contractor  Type of service – Maintenance/support or warranty  Charges, if any, for the service Service Reports for OGS

Time is Money Join Law Insider Premium to draft better contracts faster.