Shotgun Racks Sample Clauses

Shotgun Racks. The County has received a $28,000 grant for the installation of shotgun racks. The parties agree to jointly develop and implement a plan for the use of this grant money to install shotgun racks in police vehicles.
AutoNDA by SimpleDocs

Related to Shotgun Racks

  • Dark Fiber 8.1 Access to unbundled Dark Fiber will be provided by Verizon, where existing facilities are available at the requested availability date, in the loop, subloop and interoffice facilities (IOF) portions of the Company's network. Access to Dark Fiber will be provided in accordance with, but only to the extent required by, Applicable Law. Except as otherwise required by Applicable Law, the following terms and conditions apply to Verizon's Dark Fiber offering. 8.2 A “Dark Fiber Loop” consists of continuous fiber optic strand(s) in a Verizon fiber optic cable between the fiber distribution frame, or its functional equivalent, located within a Verizon Wire Center, and Verizon’s main termination point, such as the fiber patch panel located within a Customer premise, and that has not been activated through connection to the electronics that “light” it, and thereby render it capable of carrying Telecommunications Services. In addition to the other terms and conditions of this Agreement, the following terms and conditions also shall apply to Dark Fiber Loops: 8.2.1 Verizon shall be required to provide a Dark Fiber Loop only where (1) one end of the Dark Fiber Loop terminates at Z-Tel's collocation arrangement and (2) the other end terminates at the Customer premise. A CLEC demarcation point shall be established either in the main telco room of a building where a Customer is located or, if the building does not have a main telco room, then at a location to be determined by Verizon. Verizon shall connect a Dark Fiber Loop to the demarcation point by installing a fiber jumper. 8.2.2 Z-Tel may access a Dark Fiber Loop only at a pre-existing hard termination point of such Dark Fiber Loop, and Z-Tel may not access a Dark Fiber Loop at any other point, including, but not limited to, a splice point. Verizon will not introduce additional splice points or open existing splice points to accommodate a CLEC’s request. Unused fibers located in a cable vault or a controlled environment vault, manhole or other location outside the Verizon Wire Center, and not terminated to a fiber patch, are not available to Z-Tel. 8.2.3 A strand shall not be deemed to be continuous if splicing is required to provide fiber continuity between two locations. Dark Fiber will only be offered on a route-direct basis where facilities exist (i.e., no intermediate offices). 8.2.4 Verizon shall perform all work necessary to install a cross connection or a fiber jumper, including, but not limited to, the work necessary to connect a dark fiber to a demarcation point, a fiber distribution frame or a POT bay. 8.2.5 At the Customer premise, unused fibers are not available to Z-Tel pursuant to this Attachment unless such fibers terminate on a fiber patch panel. Unused fibers in a fiber splice point located outside the Customer premise are not available to Z-Tel. 8.2.6 Dark Fiber will be offered to Z-Tel in the condition that it is available in Verizon's network at the time that Z-Tel submits its request (i.e., "as is"). In addition, Verizon shall not be required to convert lit fiber to Dark Fiber for Z-Tel's use. 8.2.7 Spare wavelengths on fiber strands, where Wave Division Multiplexing (WDM) or Dense Wave Division Multiplexing (DWDM) equipment is deployed, are not considered to be spare Dark Fiber Loops and, therefore, will not be offered to Z-Tel as Dark Fiber. 8.2.8 Z-Tel shall be responsible for providing all transmission, terminating and regeneration equipment necessary to light and use Dark Fiber. 8.2.9 Z-Tel may not resell Dark Fiber purchased pursuant to this Attachment to third parties. 8.2.10 In order for Verizon to continue to satisfy its carrier of last resort (COLR) obligations under Applicable Law and/or to preserve the efficiency of its network, Verizon will limit Z-Tel to leasing a maximum of twenty-five percent (25%) of the Dark Fiber in any given segment of Verizon's network during any two-year period. In addition, except as otherwise required by Applicable Law, Verizon may take any of the following actions, notwithstanding anything to the contrary in this Agreement: 8.2.10.1 Revoke Dark Fiber leased to Z-Tel upon a showing of need to the Commission and twelve (12) months' advance written notice to Z-Tel; and 8.2.10.2 Revoke Dark Fiber leased to Z-Tel upon a showing to the Commission that Z-Tel underutilized fiber (less than OC-12) within any twelve (12) month period. 8.2.10.3 Verizon may reserve Dark Fiber for maintenance purposes, or to satisfy Customer orders for fiber related services or for future growth. Verizon reserves and shall not waive, Verizon’s right to claim before the Commission that Verizon should not have to fulfill a Z-Tel order for Dark Fiber because that request would strand an unreasonable amount of fiber capacity, disrupt or degrade service to Customers or carriers other than Z-Tel, or impair a Verizon obligation to serve as a carrier of last resort. 8.2.11 Z-Tel may not reserve Dark Fiber.

  • Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.

  • Porcupine Site Highway 11 and the City of Timmins Thunder Bay and District Toronto/York-Peel

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and PCS, PCS shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs. 2.4.2 Prior to ordering any Two-Way Interconnection Trunks from Verizon, PCS shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Second (Hundred Call Second) information, and the Parties shall mutually agree on the appropriate initial number of Two-Way End Office and Tandem Interconnection Trunks and the interface specifications at the Point of Interconnection (POI). Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One-Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.3 Two-Way Interconnection Trunks shall be from a Verizon End Office or Tandem to a mutually agreed upon POI. 2.4.4 On a semi-annual basis, PCS shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that PCS anticipates Verizon will need to provide during the ensuing two (2) year period to carry traffic from PCS to Verizon and from Verizon to PCS. PCS’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Second (Hundred Call Second) equal to five (5). 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.01 during the average time consistent busy hour. Verizon and PCS shall engineer Two-Way Interconnection Trunks using BOC Notes on the LEC Networks SR-TSV-002275. 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Xxxxx’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.

  • Unbundled Digital Loops 2.3.1 BellSouth will offer Unbundled Digital Loops (UDL). UDLs are service specific, will be designed, will be provisioned with test points (where appropriate), and will come standard with OC and a DLR. The various UDLs are intended to support a specific digital transmission scheme or service. 2.3.2 BellSouth shall make available the following UDLs, subject to restrictions set forth herein:

  • AT&T-12STATE acknowledges that CLEC may have an embedded base of one-way trunks ordered and installed prior to the Effective Date of this Agreement that were used for termination of CLEC’s Section 251(b)(5)/IntraLATA Toll Traffic to AT&T-12STATE (Embedded Base). To the extent that CLEC has such an Embedded Base, CLEC shall only augment trunk groups in the Embedded Base with the mutual agreement of the Parties. CLEC shall not order any new one-way trunk groups following the Effective Date of this Agreement. Moreover, the Parties agree that the Embedded Base will be converted to two-way trunk groups under the following circumstances: 4.2.1.1 With reasonable notification from AT&T-12STATE and upon AT&T-12STATE’s request, CLEC shall convert all of its Embedded Base to two-way trunks. 4.2.1.2 At any time an Embedded Base trunk group (either originating or terminating) requires augmentation, AT&T-12STATE can require the associated originating and terminating trunks to be converted to a single two-way trunk group prior to the augmentation. 4.2.1.3 When any network changes are to be performed on a project basis (i.e., central office conversions, tandem re-homes, etc.), upon request and reasonable notice by AT&T-12STATE, CLEC will convert all of its Embedded Base affected by the project within the intervals and due dates required by the project parameters. 4.2.1.4 In addition to the foregoing, CLEC may choose, at any time, to convert its Embedded Base to two-way trunk groups. 4.2.1.5 The Parties will coordinate any trunk group migration, trunk group prioritization and implementation schedule. AT&T-12STATE agrees to develop a cutover plan within thirty (30) days of notification to CLEC of the need to convert pursuant to Section 4.2.1.1 above and Section 4.2.1.3 above.

  • Orlando, FL; Ft Lauderdale, FL; Charlotte-Gastonia-Rock Hill, NC; Greensboro-Winston Salem-High Point, NC; Nashville, TN; and New Orleans, LA, and BellSouth has provided non- discriminatory cost based access to the Enhanced Extended Link (EEL) throughout Density Zone 1 as determined by NECA Tariff No. 4 as in effect on January 1, 1999.

  • Purpose of Interconnection Facilities Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Interconnection Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the Participating TO’s Transmission System and shall be used for no other purpose.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!