Site Preparation and Cleanup (Mobilization/Demobilization). The total price bid for Site Preparation shall not exceed five (5) percent of the total amount of the remaining bid items. The lump sum price for Item 1 shall constitute full compensation for preparing the site including (but not limited to): sawcutting of sidewalks, roadways, and driveways; removal and stockpiling of loam; removal and disposal of trees, brush, and stumps as required; disposal of surplus loam material as directed; protecting property pins, bounds and other documentation, fences, walls, and walks; and removing and resetting signs as required. The price shall also include; erosion controls, dewatering, protection of excavations left open, all safety and construction signage, obtaining all permits, cleanup and all other related work necessary, indicated by the plans, or as specified or directed.
Appears in 3 contracts
Samples: Agreement, Agreement, Elevator Constructors
Site Preparation and Cleanup (Mobilization/Demobilization). The total price bid for Site Preparation shall not exceed five (5) percent of the total amount of the remaining bid items. The lump sum price for Item 1 shall constitute full compensation for preparing the site including (but not limited to): sawcutting of sidewalks, roadways, and driveways; removal and stockpiling of loam; removal and disposal of trees, brush, and stumps as required; disposal of surplus loam material as directed; protecting property pins, bounds and other documentation, fences, walls, and walks; and removing and resetting signs as required. The price shall also include; erosion controls, dewatering, include protection of excavations left open, all safety and construction signage, obtaining all permits, cleanup and all other related work necessary, indicated by the plans, or as specified or directed.
Appears in 1 contract
Samples: Agreement