Tamping Sample Clauses

Tamping. The term “tamping” as used herein in conjunction with the phrase “treating surfaces of unset concrete” shall mean the final compaction and surface finish to be applied to unset concrete beds, or the like, with a steel shod beam tamper, either manually or mechanically operated unless otherwise stated. The resulting surface finish shall have a slightly ribbed appearance.
AutoNDA by SimpleDocs
Tamping. If the material is to be compacted by tamping, or under appropriate circumstances, rolling, the material shall be deposited and spread in uniform, parallel layers not exceeding 8 inches thick before compaction. Before the next layer is placed, each layer shall be tamped as required so as to obtain a thoroughly compacted mass. Care shall be taken that the material close to the bank, as well as in all other portions of the trench, is thoroughly compacted. When the trench width and the depth to which backfill has been placed are sufficient to make it feasible, and it can be done effectively and without damage to the pipe, backfill may, on approval, be compacted by the use of suitable rollers, tractors, or similar powered equipment instead of by tamping. For compaction by tamping (or rolling), the rate at which backfilling material is deposited in the trench shall not exceed that permitted by the facilities for its spreading, leveling and compacting as furnished by the Contractor. If necessary to ensure proper compaction by tamping (or rolling), the material shall first be wet by sprinkling. However, no compaction by tamping (or rolling) shall be done when the material is too wet either from rain or too great an application of water to be compacted properly; at such times the work shall be suspended until the previously placed and new materials have dried out sufficiently to permit proper compacting, or such other precautions shall be taken as may be necessary to obtain proper compaction.
Tamping. Use a tamper cart with a minimum 200-pound load or a vehicle tire as recommended by the manufacturer. Tamp the edges of the tape. Use a modified tamper cart roller if necessary. Use of a vehicle tire to tamp a long line application of temporary removable pavement marking tape is acceptable provided the vehicle is recommended by the manufacturer and acceptable to the Representative. When using the tamper cart do not twist or turn the tamper cart on the tape and make sure all edges are firmly adhered.
Tamping. Whenever earth fill is placed adjacent to structures or at locations where it is not practicable to use a roller, the fill materials shall be tamped by use of mechanical reamers or tampers. Each layer shall be compacted to a density equal to or greater than obtained under the above rolling procedure for the type of compaction designated Each successive layer shall contain only that amount of material, which will insure proper compaction, but in no instance shall any layer be greater than thirty (30) centimeters (loose measurement) in depth. The Engineer or his Representative must approve each layer before the next layer is placed.

Related to Tamping

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Sidewalks doorways, vestibules, halls, stairways and other similar areas shall not be obstructed by Tenant or used by Tenant for any purpose other than ingress and egress to and from the Premises. No rubbish, litter, trash, or material shall be placed, emptied, or thrown in those areas. At no time shall Tenant permit Tenant’s employees to loiter in Common Areas or elsewhere about the Building or Property.

  • Viewing By strict appointment through the selling Agents, JD Commercial, 00 Xxxxxxxx Xxxxx, Bideford, North Devon. EX39 1TW TEL: (01237) 424053 / 07868 846357 E-MAIL: xxxxx@xx-xxxxxxxxxx.xx.xx JD COMMERCIAL, 00 XXXXXXXX XXXXX, website : xxx.xx-xxxxxxxxxx.xx.xx BIDEFORD, NORTH DEVON, EX39 1TW email : xxxxx@xx-xxxxxxxxxx.xx.xx

  • Presentation At any step of the grievance procedure, the State representative may determine it desirable to hold a grievance conference. If a grievance conference is scheduled, the grievant or a Union xxxxxxx, or both, may attend without loss of compensation. A Union representative or job xxxxxxx may request a meeting at the first or second step.

  • Toilets Sanitary xxxx and fittings of premium international brands like American Standard, Toto or equivalent. Provision for geysers in each toilet or for pressure pumps in each Apartment. Glass partitions between dry and wet areas.

  • International Shopping Goods estimated to cost less than $100,000 equivalent per contract may be procured under contracts awarded on the basis of international shopping procedures in accordance with the provisions of paragraphs 3.5 and 3.6 of the Guidelines.

  • Toilet Tiles for floor or any other similar. • Walls –Tiles on the walls upto door height. • Sanitary ware of good quality. • Chrome plated fittings of good quality • Electrical point for geyser and exhaust fan. • Plumbing provision for Hot/Cold water line in shower.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!