Space-Based Network Non Sample Clauses

Space-Based Network Non. Conformance MSV shall submit a Notice of Non-Conformance to Contractor if the results of the SBN Acceptance Test demonstrate that the Space-Based Network does not comply with the requirements of Article 10.2.1(i-iv) or if the SBN Acceptance Test review and the contents of the Summary SBN Acceptance Test Report do not comply in all material respects with the requirements of Exhibit B, Technical Requirements for MSV L-Band Space Based Network. To the extent the non-conformity relates to the Ground Segment, or if the non-conformity of the Satellite can be fixed remotely, Contractor shall promptly correct such deficiencies and resubmit such Space-Based Network for additional testing in accordance with applicable requirements of the SBN Program Test Plan and a second SBN Acceptance Test. Such additional testing and second SBN Acceptance Test shall be conducted to the extent relevant and necessary to demonstrate that the SBN conforms to the requirements specified in Article 10.2.1, after which, MSV shall again notify Contractor under Articles 10.2.3, 10.2.4, or 10.2.5, as applicable. If the sole non-conformity is that the SBN Acceptance Test demonstrates that the Satellite does not conform to Article 10.2.1(iii), Article 10.2.5 shall apply.
AutoNDA by SimpleDocs

Related to Space-Based Network Non

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

  • Service Levels (1) DTI shall perform the Services in accordance with the service levels (the "Service Levels") as may be agreed to from time to time in writing by DTI and the Funds (the "Service Level Agreement"). Failure to perform in a manner which equals or exceeds the Service Levels shall result in fee credits ("Fee Credits") or the Funds' right to terminate this Agreement, as set forth in the Service Level Agreement.

  • Year 2000 Compatibility Borrower shall take all action necessary to assure that Borrower's computer based systems are able to operate and effectively process data including dates on and after January 1, 2000. At the request of Bank, Borrower shall provide Bank assurance acceptable to Bank of Borrower's Year 2000 compatibility.

  • Performance Standard Consultant represents and warrants that Services will be performed in a thorough and professional manner, consistent with high professional and industry standards by individuals with the requisite training, background, experience, technical knowledge and skills to perform Services.

  • Service Level Service Provider will classify incidents at its own discretion. Such classifications shall be consistent with the priorities Service Provider set for itself as a recipient of services. Incidents classified using this methodology will be triaged as documented in Attachment A.

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • HVAC A. Heating, ventilating and air conditioning equipment will be provided with sufficient capacity to accommodate a maximum population density of one (1) person per one hundred fifty (150) square feet of useable floor area served, and a combined lighting and standard electrical load of 3.0 xxxxx per square foot of useable floor area. In the event Tenant introduces into the Premises personnel or equipment which overloads the system’s ability to adequately perform its proper functions, Landlord shall so notify Tenant in writing and supplementary system(s) may be required and installed by Landlord at Tenant’s expense, if within fifteen (15) days Tenant has not modified its use so as not to cause such overload. Operating criteria of the basic system shall not be less than the following:

  • Performance Standards The Custodian shall use its best efforts to perform its duties hereunder in accordance with the standards set forth in Schedule C hereto. Schedule C may be amended from time to time as agreed to by the Custodian and the Trustees of the Fund.

  • Year 2000 Problem The Company and its Subsidiaries have reviewed the areas within their business and operations which could be adversely affected by, and have developed or are developing a program to address on a timely basis, the "Year 2000 Problem" (that is, the risk that computer applications used by the Company and its Subsidiaries may be unable to recognize and perform properly date-sensitive functions involving certain dates prior to and any date after December 31, 1999). Based on such review and program, the Company reasonably believes that the "Year 2000 Problem" will not have a Material Adverse Effect.

  • Hardware and Software Requirements In order to access and retain Disclosures electronically, you must satisfy the following computer hardware and software requirements: access to the Internet; an email account and related software capable of receiving email through the Internet; a web browser which is SSL-compliant and supports secure sessions, and hardware capable of running this software.

Time is Money Join Law Insider Premium to draft better contracts faster.