Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.
PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:
Standard Operating Procedures Standard Operating Procedures shall not contravene the Canada Labour Code, the Canadian Human Rights Code, or the Collective Agreement, and an allegation of such contravention is subject to the grievance procedure.
Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.
Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.
Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.
Proposed Policies and Procedures Regarding New Online Content and Functionality By October 31, 2017, the School will submit to OCR for its review and approval proposed policies and procedures (“the Plan for New Content”) to ensure that all new, newly-added, or modified online content and functionality will be accessible to people with disabilities as measured by conformance to the Benchmarks for Measuring Accessibility set forth above, except where doing so would impose a fundamental alteration or undue burden. a) When fundamental alteration or undue burden defenses apply, the Plan for New Content will require the School to provide equally effective alternative access. The Plan for New Content will require the School, in providing equally effective alternate access, to take any actions that do not result in a fundamental alteration or undue financial and administrative burdens, but nevertheless ensure that, to the maximum extent possible, individuals with disabilities receive the same benefits or services as their nondisabled peers. To provide equally effective alternate access, alternates are not required to produce the identical result or level of achievement for persons with and without disabilities, but must afford persons with disabilities equal opportunity to obtain the same result, to gain the same benefit, or to reach the same level of achievement, in the most integrated setting appropriate to the person’s needs. b) The Plan for New Content must include sufficient quality assurance procedures, backed by adequate personnel and financial resources, for full implementation. This provision also applies to the School’s online content and functionality developed by, maintained by, or offered through a third-party vendor or by using open sources. c) Within thirty (30) days of receiving OCR’s approval of the Plan for New Content, the School will officially adopt, and fully implement the amended policies and procedures.
Operational Procedures In order to minimize operational problems, it will be necessary for trade information to be supplied in a secure manner by the Subadviser to the Fund’s Service Providers, including: JPMorgan Chase Bank, National Association (the “Custodian”), Virtus Fund Services (the “Fund Administrator”) BNY Mellon Investment Servicing (US) Inc., (the “Sub-Accounting Agent”), any Prime Broker to the Series, and all other Counterparties/Brokers as required. The Subadviser must furnish the Fund’s service providers with required daily information as to executed trades in a format and time-frame agreed to by the Subadviser, Custodian, Fund Administrator, Sub-Accounting Agent and Prime Broker/Counterparties and designated persons of the Fund. Trade information sent to the Custodian, Fund Administrator, Sub-Accounting Agent and Prime Broker/Counterparties must include all necessary data within the required timeframes to allow such parties to perform their obligations to the Series. The Sub-Accounting Agent specifically requires a daily trade blotter with a summary of all trades, in addition to trade feeds, including, if no trades are executed, a report to that effect. Daily information as to executed trades for same-day settlement and future trades must be sent to the Sub-Accounting Agent no later than 4:30 p.m. (Eastern Time) on the day of the trade each day the Fund is open for business. All other executed trades must be delivered to the Sub-Accounting Agent on Trade Date plus 1 by Noon (Eastern Time) to ensure that they are part of the Series’ NAV calculation. (The Subadviser will be responsible for reimbursement to the Fund for any loss caused by the Subadviser’s failure to comply with the requirements of this Schedule A.) On fiscal quarter ends and calendar quarter ends, all trades must be delivered to the Sub-Accounting Agent by 4:30 p.m. (Eastern Time) for inclusion in the financial statements of the Series. The data to be sent to the Sub-Accounting Agent and/or Fund Administrator will be as agreed by the Subadviser, Fund Administrator, Sub-Accounting Agent and designated persons of the Fund and shall include (without limitation) the following:
Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.
Construction Phase Services 3.1.1 – Basic Construction Services