Splice Kit. A device or system to splice the trunk cable in the event of damage or provide length extension shall be provided. The spliced cable will still meet relevant standards and code. The trunk cable will be cut to fit and installed into a customer site, and it will not be acceptable to remove the whole cable in the event of damage. In addition, it is highly desired that the repair device/system provide the capability to connect two lengths of trunk and drop cable while still adhering to relevant standards and code. The Splice Kit must meet the same test levels as the Splice Box for the five pertinent specifications listed below. • Mechanical Stress Test (pull test) [***] • [***] • HiPot • Cold Impact • IP67 Splice Kit concepts utilizing two different termination methods were provided by PHOENIX CONTACT and are being evaluated by ENPHASE. One method utilizes screw termination and the second design uses a spring contact. After design approval from ENPHASE, testable pre-production samples would be available according the following estimated schedules Splice Kit with screw contacts requires [***] calendar weeks for first pre-production parts (series grade tooling but not fully tested by the PHOENIX test labs) Splice Kit with spring contacts requires [***] calendar weeks for first pre-production parts (series grade tooling but not fully tested by the PHOENIX test labs) [***] = CERTAIN INFORMATION ON THIS PAGE HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THE OMITTED PORTIONS. See the Prices in the Annex 6 Document “Annex 6 Products, Pricing and Delivery Conditions”
Appears in 4 contracts
Samples: Cooperation Agreement (Enphase Energy, Inc.), Cooperation Agreement (Enphase Energy, Inc.), Cooperation Agreement (Enphase Energy, Inc.)