Standard Cabling Best Practices Sample Clauses

Standard Cabling Best Practices. A. For Cabling, the Cable used shall be Standard Branded CAT6, 100ohm, 4 pair unshielded twisted pair (UTP) For e.g. If 25 nodes are required at a floor with future expansion planning of 20 more nodes, then in such situation minimum hardware is required to be install is one Switch (48 Port) and one Patch panel for floor level distribution.
AutoNDA by SimpleDocs

Related to Standard Cabling Best Practices

  • Best Practices The Recipient acknowledges they may or may not have access to the Owner’s Confidential Information and agrees that it shall not directly or indirectly divulge, disclose, or communicate any of the Confidential Information to any third party, except as may be required during any formal business association or dealings on behalf of the Owner for any event, with the prior written approval of the Owner. The Recipient acknowledges that no license of the Confidential Information, by implication or otherwise, is granted to the Recipient by reason of this Agreement. Additionally, the Recipient acknowledges that it may only use the Confidential Information in connection with its business dealings with the Owner and for no other purpose without the prior written consent of the Owner.

  • Best Management Practices 1. Contractor shall conduct operations under this Contract so as to assure that pollutants do not enter municipal storm drain systems which systems are comprised of, but are not limited to curbs and gutters that are part of the street systems ("Stormwater Drainage System"), and to ensure that pollutants do not directly impact "Receiving Waters" (as used herein, Receiving Waters include, but are not limited to, rivers, creeks, streams, estuaries, lakes, harbors, bays and oceans).

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Best Practice 9.1 The parties agree that Best Practice is simply a better way of doing things - it is a process of constantly changing and adapting to new pressures and work methods. Best Practices are not fixed. It is the method of operation to achieve exemplary levels of performance. Best Practices are not restricted to an examination of cost, but also include quality and timely completion of work safely and efficiently.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • Good industry practices 12.1.1. SAP warrants that: a) its Services will be performed in a professional xxxxxxx-like manner by Consultants with the skills reasonably required for the Services; and

  • NMHS Governance, Safety and Quality Requirements 3.1 Participates in the maintenance of a safe work environment.

  • EMHS Governance, Safety and Quality Requirements 4.1 Participates in the maintenance of a safe work environment.

  • SMHS Governance, Safety and Quality Requirements 4.1 Participates in the maintenance of a safe work environment.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

Time is Money Join Law Insider Premium to draft better contracts faster.