LAN/WAN/Structured Cabling WORKS Sample Clauses

LAN/WAN/Structured Cabling WORKS. All work shall conform to the Building Code, and all local codes and ordinances as applicable. Any exceptions to the above must have written authorization from DST/▇▇▇/GoG. As mentioned above entire work has to be completed in turnkey/EPC manner. Further, below mentioned are the minimum tasks which Bidder will have to carry out during the work: (a) To carry out the feasibility study for the deployment of required LAN. (b) Bidder shall act as single Bidder to organize and manage the entire project including design, supply, installation and commissioning. The Bidder shall be in a position to test, demonstrate and certify the LAN connectivity in accordance with the contract. (c) The Bidder shall carry out site survey and prepare tentative BoM for the work to be carried out at that particular site. This BoM will have to be submitted to DST/GIL/GoG for approval along with a layout diagram indicating the location of equipment to be installed. (d) The Bidder will be responsible to undertake and complete the works related to supply installation and commissioning services across the Gujarat state. (e) In case of repairing or upgradation of existing links bidder will be responsible for removal of existing old/faulty cables or material without any additional cost to the purchaser. (f) The Bidder shall be using 4” GI Pipe as standard while installation of cabling work. (g) The Bidder shall be responsible to share the status report of existing infrastructure (i.e. Cable, network equipments, patch cord, OFC etc.), during resolving complaints. (h) The Bidder shall provide one copy of the Network Diagram, warranty documents, manuals and FAT/UAT reports etc. to concern local GOG/GSWAN authorities and another copy to DST/▇▇▇ for further process of completion of orders. (i) The Bidder will be responsible to provide the services at all the locations at the agreed price. Bidder is required to Supply and Install LAN components and commission LAN as per the requirements. The structured cabling works are to be completed on turnkey basis including installation of all required casing, conduits, flexi pipes, I/O boxes, Face Plates, removal of existing Lan infra if any, etc. To ensure quality of work done, no cable should be left bare or visibly exposed and the supplied equipments are required to be maintained for Three years from the date of FAT. (j) The Bidder shall be responsible for implementation of the work as defined. Delivered Solution must be tested and commissioned as per d...