Start-up Fuel Costs. The Start-up Fuel Cost shall be calculated in accordance with Equation D-1a: Equation D-1a Start-up Fuel Cost ($) = [ (A (MMBtu/hr)  x ) (hrs) + B ] (MMBtu)  Hourly Fuel Price ($MMBtu) Where:  “x” equals the number of hours since the Unit ceased operation and cannot exceed “xMax”.  The Hourly Fuel Price is calculated pursuant to Schedule C Equation C1-8 for the hour in which the Start-up began.  The values A, B and xMax for each Unit are given in Table D-1 below.
AutoNDA by SimpleDocs
Start-up Fuel Costs. The Start-up Fuel Cost shall be calculated in accordance with Equation D-1a: Start-up [ (A Equation D-1a

Related to Start-up Fuel Costs

  • Start-Up Costs 4.1.1 The Government of Ontario will provide:

  • Line Outage Costs Notwithstanding anything in the NYISO OATT to the contrary, the Connecting Transmission Owner may propose to recover line outage costs associated with the installation of Connecting Transmission Owner’s Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades on a case-by-case basis.

  • Fuel Surcharge NO FUEL SURCHARGES allowed during the term of this contract or any of its extensions. The Successful Contractor(s) will not xxxx Xxxxxxx County for any fuel surcharges throughout the term of this contract and its extensions.

  • Service Costs Service Costs are direct and indirect expenditures incurred in support of Petroleum Operations in the Contract Area, including expenditures on warehouses, piers, marine vessels, vehicles, motorized rolling equipment, aircraft, fire and security stations, workshops, water and sewerage plants, power plants, housing, community and recreational facilities and furniture and tools and equipment used in these activities. Service Costs in any Year shall include the costs incurred in such Year to purchase and/or construct the said facilities as well as the annual costs of maintaining and operating the same, each to be identified separately. All Service Costs shall be regularly allocated as specified in Sections 2.2.5, 2.3.5 and 2.4 to Exploration Costs, Development Costs and Production Costs and shall be separately shown under each of these categories. Where Service Costs are made in respect of shared facilities, the basis of allocation of costs to Petroleum Operations hereunder shall be specified.

  • CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh 🟏 Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity 🟏 8760 hours 🟏 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.

  • Operating Costs (a) Tenant shall maintain the Premises in their condition on the Effective Date at Tenant’s sole cost and expense. Landlord may inspect the Premises and, if Landlord reasonably determines that Tenant is not maintaining the Premises in their condition on the Effective Date, Landlord may provide Tenant with written notice of any such maintenance concern, and Tenant shall promptly make such repairs. If Tenant fails to complete such repairs within thirty (30) days of receipt of such notice, Landlord may undertake such repairs and Tenant shall be obligated to reimburse Landlord for its costs within ten (10) days of receipt of an invoice therefore. Landlord represents and warrants to Tenant that the exterior walls, foundation and roof of the Premises are in good working order on the Effective Date. Landlord will, at its cost, replace, restore, repair or maintain (as necessary) the roof until the first anniversary of the Commencement Date. Landlord will, at its cost, replace, restore, repair or maintain (as necessary) the exterior walls and foundation of the Premises until the fifth anniversary of the Commencement Date. Tenant shall be fully responsible for the replacement, restoration, repair and maintenance of the roof, exterior walls and foundation of the Premises thereafter. If Landlord fails to commence such repairs within thirty (30) days of receipt of any notice from Tenant, Tenant may undertake such repairs and Landlord shall be obligated to reimburse Tenant for its costs within ten (10) days of receipt of an invoice therefore; provided, however, that Tenant shall have no rights to offset or set off any such amounts against the Rent to be paid hereunder. If Landlord does not reimburse Tenant within ten (10) days from the date of notice, such charge shall bear interest at the rate of eighteen percent (18%) per annum until paid. Notwithstanding anything to the contrary herein contained (except for the provisions of paragraph 32 below), if Tenant makes any changes, additions or alterations to the roof of the Premises which involves penetration of the roof (other than those for telecommunications installations so long as the installation contractor has Landlord’s prior written approval which will not be unreasonably conditioned, delayed or denied), Landlord’s obligations to replace, restore, repair or maintain the roof shall cease. If Tenant undertakes any structural repairs in the Premises which impact, affect, or alter the walls or foundation of the Premises, Landlord’s obligation to replace, restore, repair or maintain that portion of the exterior walls and foundation of the Premises shall cease as of the date of such action by Tenant. Any Operating Costs that pertain to a period prior to or after the Lease Term will be pro rated between Landlord and Tenant in the proportion of the amount of the Lease Term that falls within the period to which the Operating Costs pertain.

  • Transportation Costs The cost of transporting a Warranted Part claimed to be defective to the facilities designated by the Seller and for the return therefrom of a repaired or replaced Warranted Part shall be borne by the Buyer.

  • Shipping Costs All items must be bid Freight On Board Destination (hereinafter FOB). This does not include hardware items being shipped to Alaska or Hawaii. Actual shipping costs will apply to items shipped Alaska or Hawaii.

  • Construction Costs Under no circumstances shall the Consultant be liable for extra costs or other consequences due to unknown conditions or related to the failure of contractors to perform work in accordance with the plans and specifications. Consultant shall have no liability whatsoever for any costs arising out of the Client’s decision to obtain bids or proceed with construction before the Consultant has issued final, fully-approved plans and specifications. The Client acknowledges that all preliminary plans are subject to substantial revision until plans are fully approved and all permits obtained.