SUPPLEMENTARY PAYMENTS These Supplementary Payments are subject to the terms of the Principal Coverages and they do not increase the limit of liability stated for the principal coverages except: Claims and Defense Expense Coverage.
Payment of Supplementary Xxxx 10.7.1 SPD may raise a ("Supplementary Xxxx") for payment on account of:
SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" GLAZING TO STEEL WITH PUTTY 4mm Obscure safety glass: 1 Panes not exceeding 0,1 m2 m2 3 Carried Forward to Summary of Section No. 3 R Section No. 3 SMD1 Bill No. 11 GLAZING BVI CONSULTING ENGINEERS Amount Item No SECTION 3 Quantity Rate Amount BILL NO. 12 PAINTWORK SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" ON FIBRE-CEMENT Prepare and brush to remove all loose contaminations, apply one coat primer and two coats PVA emulsion paint: 1 On fascias and barge boards m2 6 ON WOOD Undercoat and minimum 2 coat gloss enamel: 2 On doors (Internal) m2 3 3 On doors (External) m2 7 ON METAL Undercoat and minimum 2 coat gloss enamel: 4 On door frames m2 1 5 On gates (Measured over the full flat area of both sides) m2 8 6 On gutters and down pipes m 10 Spot prining defects in prime surface with zinc chromate primer and apply one universal undercoat and two coats EPWP, golden brown gloss enamel paint on steel: 7 On windows with burglar bars m2 3 Carried Forward to Summary of Section No. 3 Section No. 3 SMD1 Bill No. 12 PAINTWORK BVI CONSULTING ENGINEERS R SECTION SUMMARY - SMD1 Bill No Page No 1 EARTHWORKS 61 2 CONCRETE,FORMWORK AND REINFORCEMENT 63 3 MASONRY 66 4 WATERPROOFING 67 5 ROOF COVERINGS 69 6 CARPENTRY AND JOINERY 71 7 IRONMONGERY 73 8 METALWORK 74 9 PLASTERING 75 10 PLUMBING AND DRAINAGE 78 11 GLAZING 79 12 PAINTWORK 80 Carried to Final Summary Section No. 3 SMD1 BVI CONSULTING ENGINEERS Amount R Item No SECTION 4 Quantity Rate Amount BILL NO.1 EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" SITE CLEARANCE 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs,xxxx and trees not exceeding 200mm girth, etc. m2 73 2 Stripping average 100mm thick layer of top soil and stockpiling on site m2 73 EXCAVATION,FILLING, ETC Excavation in earth not exceeding 2m deep: 3 Trenches m3 18 4 Pit m3 27 5 For aprons thickenning m3 4 Extra over trench and hole excavations in earth for excavation: 6 Soft rock m3 49 7 Hard rock m3 49 Extra over all excavations for carting away: 8 Surplus material from excavations and/or stock piles on site to a dumping site to be alocated by the Contractor m3 35 Carried Forward Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Brought Forward R Risk of collapse of excavations: 9 Sides of trench and hole excavation not exceeding 1,5m deep. m2 82 Keeping excavations free of water: 10 Keeping excavations free of water other than subterranean water Item Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 93% ModAASHTO density: 11 Under floors, steps, pavings, etc. m3 7 12 Backfilling to trenches, holes, etc. m3 9 Compaction of surfaces: 13 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 25 14 Compaction of ground surface to pits etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 20 15 Compaction of ground surface to aprons etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 44 Prescribed density tests on filling: 16 Modified AASHTO Density tests No 5 SOIL POISONING Carried Forward R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS Brought Forward R Soil insecticide: 17 Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming. m2 25 18 To bottom of concrate aprons m2 44 19 To bottoms and sides of trenches, etc. m2 69 Carried Forward to Summary of Section No. 4 R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Amount
SUPPLEMENTAL PAYMENT LIMITATION Notwithstanding the foregoing:
Termination of use of supplementary card The basic cardmember is entitled at any time to terminate the use of any supplementary card, and the supplementary cardmember may terminate the use of his supplementary card, at any time in accordance with clause
SUPPLEMENTAL PAYMENTS Applicant shall make annual Supplemental Payments in an amount equal to, but not to exceed, the limit of the annual Supplemental Payment as set out Section 6.2 below, starting with the first complete or partial year of the Qualifying Time Period and accruing on January 1 of each year thereafter, and continuing through the third year following the end of the Tax Limitation Period.
Supplementary Agreement The parties stipulate and agree that the escrow provisions in this Section 6(b) (Escrow Establishment) of Attachment B (Facility Owned by Seller) and the Source Code Escrow Agreement and Proceeds Escrow Agreement are "supplementary agreements" as contemplated in Section 365(n)(1)(B) of the Code. In any voluntary or involuntary bankruptcy proceeding involving Seller, failure by Company to assert its rights to "retain its rights" to the intellectual property encompassed by the Source Code or the funds in the Proceeds Escrow, pursuant to Section 365(n)(1)(B) of the Code, under an executory contract rejected in a bankruptcy proceeding, shall not be construed as an election to terminate the contract by Company under Section 365(n)(1)(A) of the Code.
PROCEDURES FOR SUPPLEMENTAL PAYMENT CALCULATIONS All calculations required by this Article VI, including but not limited to: (i) the calculation of the Applicant’s Stipulated Supplemental Payment Amount; (ii) the determination of both the Annual Limit and the Aggregate Limit; (iii) the effect, if any, of the Aggregate Limit upon the actual amount of Supplemental Payments eligible to be paid to the District by the Applicant; and (iv) the carry forward and accumulation of any of the Applicant’s Stipulated Supplemental Payment Amounts unpaid by the Applicant due to the Aggregate Limit in previous years, shall be calculated by the Third Party selected pursuant to Section 4.3.
Master Definitions Supplement All terms and expressions used in this Agreement shall have the same meaning as those contained in the Master Definitions Supplement to the CAISO Tariff.
Minimum Reporting Allowance If an employee reports for work at the regularly scheduled time and no work is available such employee will be paid a minimum of four (4) hours pay at her regular rate provided: