Right of Way 8.1 The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:
Right of Way and Real Property The party named in Article 1, Responsible Parties, under AGREEMENT is responsible for the provision and acquisition of any needed right of way or real property. The Local Government shall be responsible for the following:
Special/temporary right of way The Contractor shall bear all costs and charges for any special or temporary right of way required by it in connection with access to the Site. The Contractor shall obtain at its cost such facilities on or outside the Site as may be required by it for the purposes of the Project Highway and the performance of its obligations under this Agreement.
Access Easement The Owner shall grant to VBWD the necessary easements and rights-of-way and/or maintain perpetual access from public rights-of-way to the Facility for VBWD, its agent, or contractor.
Easement To the extent applicable, Owner agrees to grant to Bell a non-exclusive easement and statutory right of way and/or a path to the property line from the Building, as the case may be and in or through the Equipment Space if it is determined that a fibre optic cable or such other Equipment must be installed to the Building and/or in the Equipment Space. Owner and Bell shall in advance, agree upon a suitable location to install the fibre optic cable on the property of the Owner. Owner agrees to allow Bell to register, at Xxxx'x expense, the easement and right of way, and/or notice of this Agreement
Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.