Common use of Subcontract Costs Clause in Contracts

Subcontract Costs. Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts. § 6.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction. § 6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. § 6.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value. § 6.5.2 Rental charges for temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation, minor repairs, dismantling and removal. The total rental cost of any Construction Manager-owned item may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. § 6.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable xxxxx cash expenses of the site office. § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval.

Appears in 3 contracts

Samples: Construction Manager Agreement, Standard Form of Agreement Between Owner and Construction Manager as Constructor, Standard Form of Agreement Between Owner and Construction Manager as Constructor

AutoNDA by SimpleDocs

Subcontract Costs. Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts. § 6.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction. § 6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work.completion § 6.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are constr provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, equipment and tools that are not fully consumed shall be based on co the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value.the § 6.5.2 Rental charges for temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation, minor repairs, dismantling and removal. The total rental cost of any Construction Manager-owned item may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner’s prior approval, and shall be at rates generally prevailing in the location of the project. § 6.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable xxxxx cash expenses of the site office. § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Construction Manager as Constructor

Subcontract Costs. Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontractssubcontracts and this Agreement. § 6.4 7.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 7.4.1 Costs, including transportation and storagestorage at the site, of materials and equipment incorporated incorporated, or to be incorporated incorporated, in the completed construction. § 6.4.2 7.4.2 Costs of materials described in the preceding Section 6.4.1 7.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the OwnerConstruction Manager’s property at the completion of the Work orWork, at and the Owner’s option, shall be sold by actual costs of such excess materials as was originally billed to the Construction Manager. Any amounts realized from such sales Owner shall be credited to the Owner as a deduction from the Cost of the Work. § 6.5 7.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 7.5.1 Costs of transportation, storage, installation, dismantling, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, equipment equipment, and tools tools, that are not fully consumed consumed, shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value. § 6.5.2 7.5.2 Rental charges for temporary facilities, machinery, equipment equipment, and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site site, and the costs of transportation, installation, dismantling, minor repairs, dismantling and removalremoval of such temporary facilities, machinery, equipment, and hand tools. Rates and quantities of equipment owned by the Construction Manager, or a related party as defined in Section 7.8, shall be subject to the Owner’s prior approval. The total rental cost of any Construction Manager-owned item such equipment may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. § 6.5.3 7.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 7.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable xxxxx cash expenses of the site office. § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Worksite office, including general office equipment and supplies. § 6.5.6 7.5.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Construction Manager as Constructor

Subcontract Costs. Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the requ subcontracts. § 6.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 Costs, including transportation and storage, Direct cost of amounts actually paid by Construction Manager for all materials and equipment incorporated or to be incorporated in the completed construction.and § 6.4.2 Costs Direct costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work.the § 6.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 Costs Direct costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value. § 6.5.2 Rental Direct rental charges for temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation, minor repairs, dismantling and removal. The total rental cost of any Construction Manager-owned item may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. § 6.5.3 Costs Direct costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 Costs Direct costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable xxxxx cash expenses of the site office. § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work.[Intentionally omitted] § 6.5.6 Costs Direct costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Construction Manager as Constructor

Subcontract Costs. Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts. § 6.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction. § 6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. § 6.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value.on § 6.5.2 Rental charges for temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation, minor repairs, dismantling and removal. The total rental cost of any Construction Manager-owned item may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. § 6.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable xxxxx cash expenses of the site office. § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval.. §

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Construction Manager as Constructor

Subcontract Costs. Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontractssubcontracts properly bid and entered into under this Agreement. § 6.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction. § 6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall be properly secured and shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. § 6.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not owned by the Construction Manager or any Subcontractor and not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value. § 6.5.2 Rental charges (not to exceed published rates of commercial rental companies) for temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation, minor repairs, dismantling and removal. The total rental cost of any Construction Manager-owned item may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. The Construction Manager agrees that no rental charges shall be payable by the Owner once the purchase price for a piece of equipment owned by the Construction Manager has been reached and ownership of such equipment shall be transferred to the Owner upon completion of the Work. § 6.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site, but no computer hardware or software costs, including without limitation CAD, other than job-site computers without the prior written approval of the Owner. and reasonable xxxxx cash expenses of the site office. . § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject provided, however, no commuting cost for personnel located in Central Oregon or assigned to the Owner’s prior approval.job site shall be included in the Cost of the Work..

Appears in 1 contract

Samples: Construction Manager Agreement

Subcontract Costs. Payments made Amounts properly billed by Subcontractors for Work which has been approved by the Construction Manager to Subcontractors in accordance with and the Owner and which otherwise satisfies all requirements of the subcontractssubcontracts and the Contract Documents. Except for preservation of the Construction Manager’s right to make receipt of payment from the Owner a condition precedent to the Construction Manager’s obligation to pay subcontractors, vendors, and other contractees of the Construction Manager, subcontractors, and other agreements otherwise shall conform to all applicable payment provisions of Texas law and this Agreement, and shall not be awarded on the basis of cost plus fee without the Owner’s written consent. § 6.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction. § 6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. § 6.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, and equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, and equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value. § 6.5.2 Rental charges and repair assessments for temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation, minor repairs, dismantling and removal. The total rental cost of any Construction Manager-owned item may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. § 6.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, and telephone service at the site and reasonable xxxxx cash expenses of which are related to the site officeWork. § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval.

Appears in 1 contract

Samples: Construction Management Agreement

Subcontract Costs. Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts. § 6.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction. § 6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. § 6.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value.no § 6.5.2 Rental charges for temporary facilities, machinery, equipment and hand tools not customarily owned by cus construction workers that are provided by the Construction Manager at the site and costs of transportation, installation, minor repairs, dismantling and removal. The total rental cost of any Construction Manager-owned item Constructi may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and Manager quantities of equipment shall be subject to the Owner’s prior approval. § 6.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable xxxxx cash expenses of the site office. § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Construction Manager as Constructor

AutoNDA by SimpleDocs

Subcontract Costs. Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts. § 6.4 Costs of Materials and Equipment Incorporated in . y installed to allow forproperty at the Completed Constructioner. An y amounts realized § 6.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction. § 6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for actuall reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized Manag from such sales shall be credited to the Owner as a deduction from the Cost of the Work. . § 6.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value. § 6.5.2 Rental charges for temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation, minor repairs, dismantling and removal. The total rental cost of any Construction Manager-owned item may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. § 6.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable xxxxx cash expenses of the site office. § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Construction Manager

Subcontract Costs. Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontractssubcontracts and this Agreement. § 6.4 7.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 7.4.1 Costs, including transportation and storagestorage at the site, of materials and equipment incorporated incorporated, or to be incorporated incorporated, in the completed construction. § 6.4.2 7.4.2 Costs of materials described in the preceding Section 6.4.1 7.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. § 6.5 7.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 7.5.1 Costs of transportation, storage, installation, dismantling, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, equipment equipment, and tools tools, that are not fully consumed consumed, shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value. § 6.5.2 7.5.2 Rental charges for temporary facilities, machinery, equipment equipment, and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site site, and the costs of transportation, installation, dismantling, minor repairs, dismantling and removalremoval of such temporary facilities, machinery, equipment, and hand tools. Rates and quantities of equipment owned by the Construction Manager, or a related party as defined in Section 7.8, shall be subject to the Owner’s prior approval. The total rental cost of any Construction Manager-owned item such equipment may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. § 6.5.3 7.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 7.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable xxxxx cash expenses of the site office. § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Worksite office, including general office equipment and supplies. § 6.5.6 7.5.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Construction Manager as Constructor

Subcontract Costs. Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts. The Construction Manager may provide a bid on any portion of the Work that the Construction Manager intends to perform. The Construction Manager’s team performing such work may include its employees, material providers, and sub-subcontractors. If the Construction Manager is chosen to perform the work, then such work shall be performed for the Construction Manager’s bid amount on the basis of a stipulated lump sum, and shall not be subject to the limitations of this Article 6 except as Construction Manager applies these limitations within their Subcontracts. § 6.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction. § 6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. § 6.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value. A small tool cost amount may be included in Exhibit E – General Conditions, as mutually agreed upon between Owner and Construction Manager. With exception of amount noted for small tools in Exhibit E, Contractor will provide to the Project a full stock of most commonly used small tools (all tools worth less than $500 each; drills, saws, screw guns, brooms, wheel xxxxxxx, shovels, etc.), These tools will be furnished at no cost to the Project. Consumables such as drill bits, saw blades, powder actuated load, winter fuel fittings and hose, oxygen, acetylene, etc. will be a direct cost to the Project at a rate equal to or less than fair market value. § 6.5.2 Rental charges for temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation, minor repairs, dismantling and removal. Tool rent is only to be charged for the time the tool is reasonably required on the job site. Contractor tool rental is subject to Owner audit at any time. Rates and quantities of equipment rented shall be competitive and subject to the Owner’s prior approval and shall be at or below rental rates consistent with those prevailing in the area. Provided, however, with respect to rental of Construction Manager’s own equipment, such rental rates are published in Exhibit "C" and in no event shall the total of such rental charges exceed 80% of fair market value of the piece of equipment when first utilized on the job. The total rental cost of any Construction Manager-owned item may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. § 6.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal, excluding such costs included in the fixed General Conditions. § 6.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable xxxxx cash expenses of the site office. , excluding such costs included in the fixed General Conditions. § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work, excluding such costs included in the fixed General Conditions. § 6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Construction Manager as Constructor

Subcontract Costs. Payments made Amounts properly billed by Subcontractors for Work which has been approved by the Construction Manager to Subcontractors in accordance with and the Owner and which otherwise satisfies all requirements of the subcontractssubcontracts and the Contract Documents. Except for preservation of the Construction Manager’s right to make receipt of payment from the Owner a condition precedent to the Construction Manager’s obligation to pay subcontractors, vendors, and other contractees of the Construction Manager, subcontractors, and other agreements otherwise shall conform to all applicable payment provisions of Texas law and this Agreement, and shall not be awarded on the basis of cost plus fee without the Owner’s written consent. § 6.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction. § 6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. § 6.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, and equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, and equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value. § 6.5.2 Rental charges for temporary facilities, machinery, machinery and equipment and hand tools for machinery not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation, minor repairs, dismantling and removal. The total rental cost of any Construction Manager-Manager- owned item may not exceed the purchase price of any comparable item. Rates of Construction Manager-Manager- owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. § 6.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, and telephone service at the site and reasonable xxxxx cash expenses of which are related to the site officeWork. § 6.5.5 That Subject to the Owner’s prior approval, that portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval.

Appears in 1 contract

Samples: Construction Manager at Risk Agreement

Subcontract Costs. Payments made by the Construction Manager Contractor to Subcontractors in accordance with the requirements of the subcontractssubcontracts and this Agreement. Scope of work self-performed by Contractor in lieu of subcontracting such work shall be reimbursed at the stipulated sum amount included in the GMP. All subcontract costs shall be billed to Owner at cost, exclusive of the Subcontractor’s fee for overhead and profits not to exceed Fifteen Percent (10%), as set forth in Section XX. § 6.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 6.4.1 7.4.1 Costs, including transportation and storagestorage at the site, of materials and equipment incorporated incorporated, or to be incorporated incorporated, in the completed construction. § 6.4.2 7.4.2 Costs of materials described in the preceding Section 6.4.1 7.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction ManagerContractor upon Owner’s prior written approval. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. § 6.5 7.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 6.5.1 7.5.1 Costs of transportation, storage, installation, dismantling, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are provided purchased by the Construction Manager Contractor for use at the site and fully consumed used in the performance of the Work. Costs of materialsMaterials, supplies, temporary facilities, machinery, equipment equipment, and tools tools, that are not fully consumed consumed, shall be based on become the cost or value Owner’s property at the completion of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market valueWork. § 6.5.2 7.5.2 Rental charges for temporary facilities, machinery, equipment equipment, and hand tools not customarily owned by construction workers that are provided by the Construction Manager Contractor at the site site, and the costs of transportation, installation, dismantling, minor repairs, dismantling and removalremoval of such temporary facilities, machinery, equipment, and hand tools. The Rates of equipment owned by the Contractor shall be pursuant to Schedule A.The total rental cost of any Construction Manager-owned item such equipment may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. § 6.5.3 7.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 6.5.4 7.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable xxxxx cash expenses of the Contractor’s site office, including general office equipment and supplies. § 6.5.5 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 6.5.6 7.5.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior written approval. As a condition for requesting payment for materials and equipment stored off site, Contractor shall provide proof of adequate property insurance naming Owner as loss payee for all items temporarily stored off site.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Contractor