SUBSTITUTION OF THE NEW RENT Sample Clauses

SUBSTITUTION OF THE NEW RENT. 2.2 The Lease shall reserve the New Rent in the place of, and not in addition to, the Existing Rent.
AutoNDA by SimpleDocs

Related to SUBSTITUTION OF THE NEW RENT

  • Substitution of Concessionaire At any time during the period of Suspension, the Lenders‟ Representative, on behalf of Senior Lenders, shall be entitled to substitute the Concessionaire under and in accordance with the Substitution Agreement, and upon receipt of notice thereunder from the Lenders‟ Representative, the Authority shall withhold Termination for a period not exceeding 180 (one hundred and eighty) days from the date of Suspension, and any extension thereof under Clause 36.1, for enabling the Lenders‟ Representative to exercise its rights of substitution on behalf of Senior Lenders.

  • Substitution of Key Personnel Consultant has represented to City that certain key personnel will perform and coordinate the Services under this Agreement. Should one or more of such personnel become unavailable, Consultant may substitute other personnel of at least equal competence upon written approval of City. In the event that City and Consultant cannot agree as to the substitution of key personnel, City shall be entitled to terminate this Agreement for cause. As discussed below, any personnel who fail or refuse to perform the Services in a manner acceptable to the City, or who are determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a threat to the safety of persons or property, shall be promptly removed from the Project by the Consultant at the request of the City. The key personnel for performance of this Agreement are as follows: Xxxxx Xxxxx.

  • Substitution of Equipment In the event the Computer is inoperable, ASL has a limited number of spare laptops for use while the Computer is being repaired or replaced. This agreement remains in effect for such a substitute. The Student may NOT opt to keep a broken Computer or to avoid using the Computer due to loss or damage.

  • INSTALLATION AND REMOVAL Show Management reserves the right to fix the time for the installation of a booth prior to the Show opening and for its removal after the conclusion of the Show. Installation of all exhibits must be fully completed by the opening time of the exposition. Any space not claimed and occupied three hours prior to opening, may be resold or reassigned without refund. No exhibitor will be allowed to dismantle or repack any part of his exhibit until after the closing of the Show. 6.

  • Removal and Demolition Company and its subcontractors will not remove or demolish, in whole or in part, any improvements upon the Premises without the prior written consent of Authority, which may, at its sole discretion, condition such consent upon the obligation of Company, at Company's cost, to replace the same by an improvement specified in such consent.

  • Rent Increases The Rent payable shall not be increased or otherwise modified during the Term of this Lease. Any increase in Rent shall only take effect after the expiration of the Term provided in this Lease. Any increase in Rent to take effect upon renewal or extension of the Term of this Lease must be preceded by a - day notice of the same from the Landlord to the Tenant.

  • Snow Removal Only the right of way will be plowed in the parking lots. Licensee is responsible for removing snow around his/her own vehicle (without causing damage or inconvenience to any other vehicles lawfully on the Premises).

  • Graffiti Removal Graffiti is detrimental to the health, safety and welfare of the community in that it promotes a perception in the community that the laws protecting public and private property can be disregarded with impunity. This perception fosters a sense of disrespect of the law that results in an increase in crime; degrades the community and leads to urban blight; is detrimental to property values, business opportunities and the enjoyment of life; is inconsistent with the City’s property maintenance goals and aesthetic standards; and results in additional graffiti and in other properties becoming the target of graffiti unless it is quickly removed from public and private property. Graffiti results in visual pollution and is a public nuisance. Graffiti must be abated as quickly as possible to avoid detrimental impacts on the City and County and its residents, and to prevent the further spread of graffiti.

  • No Removal or Substitution The Resident may not remove, alter or change any property in the Room which is provided on occupancy or at any other time during the Term, including and not limited to; furnishings, fixtures, equipment, television sets, appliances, window screens, floor coverings and any mattress covering. The Resident shall use all such items only for their intended purpose.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

Time is Money Join Law Insider Premium to draft better contracts faster.