SVP Correction Method Sample Clauses

SVP Correction Method. Appendix A, section .08 sets forth the SVP correction method for correcting the failure to satisfy the § 415(c) limits on annual additions.
AutoNDA by SimpleDocs

Related to SVP Correction Method

  • Allocation Method (Choose one of a. or b.): a. [ ] All the same. Using the same allocation method as applies to the Signatory Employer under this Election 28. b. [ ] At least one different. Under the following allocation method(s): .

  • Network Interconnection Methods 3.1 The Interconnection provided herein may not be used solely for the purpose of originating a Party’s own interexchange traffic.

  • Construction Methods 3.1 The Contractor shall provide all tools, equipment, materials, labor and work for the excavation and removal of the unsuitable subgrade soils and their subsequent replacement with the specified backfill soils as directed by the Owner’s representative. All work under this item shall be performed in a safe and workmanlike manner. 3.2 All work shall be performed in accordance with DelDOT Standard Specifications Section 821. 3.3 Following the removal of existing pavements, the Owner’s representative will review the exposed subgrade and provide recommendations for the undercutting of unsuitable subgrade materials as required. The depth and extent of undercut excavation, if required, will be determined by the Owner’s representative at the time of excavation. 3.4 All excavated materials shall become the property of the Contractor and be removed from the site at the completion of the project at no additional expense to the Owner. 3.5 Undercut excavations should be backfilled with graded aggregate. Backfill shall be placed in loose lifts not exceeding 8 inches thick. Each lift should be compacted with at least 3 passes of a minimum 5-ton, walk-behind or self-propelled vibratory roller when the size of the area permits, or with a vibrating plate mechanical compactor for smaller areas. Lift thickness shall be reduced to 6 inch loose lift when using a vibratory plate compactor. 3.6 The Contractor shall take precautions as necessary to minimize the potential for disturbance or softening of the pavement subgrade materials from inclement weather or construction traffic. As a minimum, this shall include the placement of backfill on the same day as the excavation. Any soft areas which develop shall be undercut and replaced with graded aggregate at no additional cost to the Owner. 3.7 Where undercutting is performed, the geotextile fabric shall be installed. The fabric should be pulled tight and lapped a minimum of 12 inches.

  • PayPal as Login Method We may allow you to authenticate with PayPal when you log into certain external websites or mobile apps. If we do so, we may share your login status with any third party enabling you to log in in this way, as well as the personal and other account information that you consent to being shared so that the third party can recognize you. PayPal will not give the third party access to your account and will only make payments from your account to that third party with your specific authorization and instruction.

  • Billing Method 2.6.1 To receive payment for services rendered pursuant to this contract the Contractor shall submit a fully completed invoice for work previously performed to: 2.6.2 At a minimum, the invoice shall detail the following information: 2.6.2.1 Unique invoice number; 2.6.2.2 Contractor’s name, address, and telephone number; 2.6.2.3 Date of invoice and/or billing period; 2.6.2.4 Applicable Contract No.;

  • Balance Computation Method For all dividend-bearing Accounts, dividends are calculated by the average daily balance method which applies a daily periodic rate to the average daily balance for the average daily balance calculation period. The average daily balance is determined by adding the full amount of the principal in Your Account for each day of the period and dividing that figure by the number of days in the period. Accrual on Noncash Deposits. For dividend-bearing Accounts, dividends will begin to accrue on the business day that You deposit noncash items (e.g. checks) into Your Account.

  • Service Providing Methodology 1.3.1 Party A and Party B agree that during the term of this Agreement, where necessary, Party B may enter into further service agreements with Party A or any other party designated by Party A, which shall provide the specific contents, manner, personnel, and fees for the specific services. 1.3.2 To fulfill this Agreement, Party A and Party B agree that during the term of this Agreement, where necessary, Party B may enter into equipment or property leases with Party A or any other party designated by Party A which shall permit Party B to use Party A’s relevant equipment or property based on the needs of the business of Party B. 1.3.3 Party B hereby grants to Party A an irrevocable and exclusive option to purchase from Party B, at Party A’s sole discretion, any or all of the assets and business of Party B, to the extent permitted under PRC law, at the lowest purchase price permitted by PRC law. The Parties shall then enter into a separate assets or business transfer agreement, specifying the terms and conditions of the transfer of the assets.

  • Single Source Selection Services for tasks in circumstances which meet the requirements of paragraph 3.10 of the Consultant Guidelines for Single Source Selection, may, with the Association's prior agreement, be procured in accordance with the provisions of paragraphs 3.9 through 3.13 of the Consultant Guidelines.

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will xxxx Xxxxxxx Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • Correction of Errors Contractor shall perform, at its own cost and expense and without reimbursement from the District, any work necessary to correct errors or omissions which are caused by the Contractor’s failure to comply with the standard of care required herein.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!