System Operating Impact Sample Clauses

System Operating Impact. The Generator-Owner will need to abide by the power factor requirements in Section 4.4.1.3 of ESB 756 Appendix A. If the project absorbs vars from National Grid, then they will need to compensate their generation output according to power factor requirements in ESB 756. As a minimum, the Project will need to maintain at least a 0.95 p.f. at their point of interconnection (POI). This interconnection study does not address the future operations and maintenance (O&M) associated with the distribution feeder and associated additions and modifications to National Grid’s system. The Company’s Peterboro station’s feeders (Nos. 51455, 51456, or 51458) may be used at various points for possible connection under contingency operations during Oneida Feeder #50150 restoration or maintenance situations. However, this Project’s normal interconnection is with Oneida #50150. For these reasons on a radial distribution feeder, the Company has an operating requirement for remote control of the Project’s main 13.2kV overcurrent device R500 through a Company-provided EMSRTU point. This is to avoid dropping multiple customers from the distribution feeder because of a generator facility problem when the Company is performing emergency feeder switching. To accomplish this, the Small Generating Facility will require instrumentation control cabling from the main 13.2kV overcurrent device R500 and the Company’s EMS-RTU.
AutoNDA by SimpleDocs

Related to System Operating Impact

  • SYSTEM OPERATION The Parties shall adhere to any applicable operational requirements of PJM necessary to protect the integrity of the transmission system within the PJM Control Area and the transmission systems of interconnected control areas, and shall satisfy any and all PJM, RFC and NERC criteria, when applicable. The DS Supplier shall also adhere to any applicable operational requirements of the Company necessary to protect the integrity of the Company’s local distribution system.

  • System Operations Each party, at its own expense, shall provide and maintain the equipment, software, services and testing necessary to transmit Data Communications to, and receive Data Communications from the parties’ respective Receipt Computers.

  • Transmission System Operation The NTO shall be responsible for ensuring that all actions related to the operation, maintenance and modification of its facilities that are designated as NTO Transmission Facilities Under ISO Operational Control and NTO Transmission Facilities Requiring ISO Notification are performed in accordance with the terms of this Agreement, all Reliability Rules and all other applicable reliability rules, standards and criteria, all operating instructions, ISO Tariffs, and ISO Procedures.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Interim Operations (a) The Company covenants and agrees as to itself and its Subsidiaries that, from and after the execution of this Agreement and prior to the Effective Time (unless Parent shall otherwise approve in writing, which approval shall not be unreasonably withheld, conditioned or delayed, and except as (1) required by applicable Law, (2) expressly required by this Agreement or (3) otherwise expressly disclosed in Section 6.1(a) of the Company Disclosure Letter), the Company shall use its reasonable best efforts to conduct its business and the business of its Subsidiaries in the ordinary course of business consistent with past practice and each of the Company and its Subsidiaries shall, subject to compliance with the specific matters set forth below, use reasonable best efforts to preserve its business organization intact and maintain the existing relations and goodwill with Governmental Entities, customers, suppliers, distributors, licensors, creditors, lessors, employees and business associates and others having material business dealings with it and keep available the services of the Company and its Subsidiaries’ present employees and agents. Without limiting the generality of, and in furtherance of, the foregoing, the Company covenants and agrees as to itself and its Subsidiaries that, from and after the date of this Agreement and prior to the Effective Time, except (A) as required by applicable Law, (B) as Parent may approve in writing (such approval not to be unreasonably withheld, conditioned or delayed), (C) as expressly disclosed in Section 6.1(a) of the Company Disclosure Letter or (D) as expressly provided for in this Agreement, the Company shall not and will not permit any of its Subsidiaries to:

  • ANNUAL OPERATING PLAN Purchaser may be required to submit a written annual operating plan, as specified by, and at the request of the Forest Officer.

  • Commercial Operation (i) On or before December 31, 2021, Interconnection Customer must demonstrate commercial operation of all generating units. Demonstrating commercial operation includes achieving Initial Operation in accordance with Section 1.4 of Appendix 2 to this ISA and making commercial sales or use of energy, as well as, if applicable, obtaining capacity qualification in accordance with the requirements of the Reliability Assurance Agreement Among Load Serving Entities in the PJM Region.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (xxxxx://xxxxx.xxx.xxxxx.xx.xx/tpasscmblsearch/index.jsp) or by contacting the HUB Program at 000-000-0000 or toll-free in Texas at 0-000-000-0000.