Task 6/N3 Sample Clauses

Task 6/N3. System Evaluation (ISS3CY_N3SE) The CPT will co-ordinate with the competent DCA Cyprus and CYTA entities to ensure the timely and orderly (following the end of the XXX phase) application of EUROCONTROL RASS Tools and methodology for the assessment of the System’s performance. RASS-C (possibly including EUROCONTROL RASS-C tools) will eventually be used for the System Evaluation. Project ISS5 standard procedures will be applied for the performance of this specific task. The RASS Evaluation Report will be the deliverable of this task.
AutoNDA by SimpleDocs

Related to Task 6/N3

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Work Plan Coordinate a work plan including a list of the proposed meetings and coordination activities, and related tasks to be performed, a schedule and an estimate. The work plan must satisfy the requirements of the project and must be approved by the State prior to commencing work.

  • Statement of Work The Contractor shall provide the services and staff, and otherwise do all things necessary for or incidental to the performance of work, as set forth below:

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • TECHNICAL TASKS Products that require a draft version are indicated by marking “(draft and final)” after the product name in the “Products” section of the task/subtask. If “(draft and final)” does not appear after the product name, only a final version of the product is required. Subtask 1.1 (Products) describes the procedure for submitting products to the CAM.

  • Project Number The project number has been assigned by the Commission as the unique identifier for your project, and it cannot be changed. The project number should appear on each page of the grant agreement preparation documents to prevent errors during its handling.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • HOOSIER HEALTHWISE SCOPE OF WORK  Requirements for Reinsurance Companies  The Contractor shall submit documentation that the reinsurer follows the National Association of Insurance Commissioners' (NAIC) Reinsurance Accounting Standards.  The Contractor shall be required to obtain reinsurance from insurance organizations that have Standard and Poor's claims- paying ability ratings of "AA" or higher and a Xxxxx’x bond rating of “A1” or higher, unless otherwise approved by OMPP.  Subcontractors  Subcontractors’ reinsurance coverage requirements must be clearly defined in the reinsurance agreement.  Subcontractors should be encouraged to obtain their own stop-loss coverage with the above-mentioned terms.  If subcontractors do not obtain reinsurance on their own, the Contractor is required to forward appropriate recoveries from stop- loss coverage to applicable subcontractors.

  • 000 SCOPE OF WORK 5.100 The scope of this Agreement covers all work of a maintenance, repair and renovation nature, assigned by the Owner to the Company and performed by the employees of the Company covered by this Agreement, within the limits of the Owner's plant site.

Time is Money Join Law Insider Premium to draft better contracts faster.