Technical Memorandum Sample Clauses

Technical Memorandum. The Engineer shall provide a Technical Memorandum creating new or updating the chapters and information in the Final Report, which documents the traffic simulation model inputs and corridor attributes (e.g., termini, facilities modeled). Document existing conditions (base) and alternative(s) scenarios to be simulated, along with alternative scenario(s)’ variation from the base scenario. Some variation examples include, but are not limited to, modified inputs and variable, assumptions, added component(s), along with tables, figure and graphs summarizing scenario results.
AutoNDA by SimpleDocs
Technical Memorandum. The Engineer shall provide a Technical Memorandum creating new or updating the chapters and information in the Final Report, which outlines data assembly and review of existing conditions within the project area including study goals, objectives, and needs, roadway conditions and characteristics, land use, existing traffic characteristics, and an analysis of crash data. The Technical Memorandum shall include information regarding analysis of existing conditions DELIVERABLES The Engineer shall provide the following: • Exhibit illustrating current corridor influences. (one table top exhibit at 1:200 scale or a sufficient scale to view driveways and one electronic copy). DocuSign Envelope ID: 04C16B52-6FE2-4CCA-85E1-65F1BBF3295C DocuSign Envelope ID: 4ADCA196-070B-414B-84B9-71706552ABDA Contract No. 36-6IDP5366 PeopleSoft Contract No. 5681 • Access Management Improvement Layout • Summary of existing Access Management ordinances rules and practices • Technical Memorandum (Twenty (20) color copies and one (1) electronic copy should be submitted in the form of un-bound 11”x17” double-sided documents.) All deliverables shall work toward development of the Final Report.
Technical Memorandum. A summarization of the analysis, assumptions and approach to the evaluation will be summarized in a technical memorandum. The intent is to provide the memorandum to the PCCA for use in subsequent planning for the project.
Technical Memorandum. 2.0 Bid Phase Services
Technical Memorandum. Prepare a draft and final versions of a Technical Memorandum summarizing the value engineering review, constructability and quality assurance review and recommendations on construction contract packaging.
Technical Memorandum. To: Xxxx Xxxxxxx, Valour Capital Re: Tree Planting Inspection – Xxxxxxx Estates Subdivision – Lots 1, 2 & 7 From: Xxxx Xxxx, Azimuth Environmental Consulting, Inc. Date: June 24, 2022 This memorandum confirms that Xxxx Xxxx (Azimuth Environmental Consulting, Inc.) visited the Xxxxxxx Estates Subdivision site on June 21st, 2022 to inspect the recent tree planting completed for Lots 1, 2 and 7. This inspection visit was completed as per the monitoring conditions within the Restoration Plans created for the above noted lots, which state inspections must be completed: (1) approximately one month following installations, (2) in the spring following the first growing season and winter and (3) two full years following installations. As tree/shrub planting finished on May 13th, 2022, the initial inspection by Xxxxxxx was completed on June 21st to ensure the trees/shrubs had sufficient time to adapt to the planting sites and show signs of decline if stressed. Following Azimuth’s inspection it was determined that the number, species and locations of trees/shrubs are in conformance to the Restoration Plans for Lots 1, 2 and 7, and no signs of decline in any trees/shrubs were observed. All trees and shrubs were planted correctly, with protective trunk material on deciduous trees species. Required surveying of the 20 metre shoreline road allowance and site preparation (spreading of existing mulch and removal of tall weeds) were also completed prior to tree planting. Some minor deer browsing was observed on the Staghorn Sumac plantings and the health of these shrubs will be closely monitored in 2022. Azimuth will continue to visit the planting sites in summer/fall, as needed, to provide watering and any other maintenance activities. As the target survival rate stated in the Restoration Plans is 80%, Xxxxxxx will inform Valour Capital and the Township of Georgian Bluffs if any future re-planting is necessary.
Technical Memorandum. 1. Prepare a technical memorandum presenting the data developed in Phases 1 through 5 in narrative form as well as the conceptual drawings. The technical memorandum will be provided to the County in hard copy and electronic formats.
AutoNDA by SimpleDocs
Technical Memorandum. 1. Provide technical memorandum documenting results of model evaluation and hydraulic analysis.
Technical Memorandum. 2.1 –Technical Memorandum Consultant will develop a technical memorandum (TM), Composting Facility Expansion and Biosolids Preliminary End-Use Assessment, that captures the assessments completed as part of Task 1. A draft version will be submitted for County and City review, and a final version will be developed after receiving review comments from all reviewers. DELIVERABLES (Consultant)
Technical Memorandum. 5.1 Prepare a technical memorandum that summarizes the work completed and describes the alternatives considered and the results of the evaluation of alternatives.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!