Technical specifications for Stirling heat pump Sample Clauses

Technical specifications for Stirling heat pump. Deliverable D1.1 presents the detailed requirements and specifications for the each element of Stirling heat pump defined in the performance of tasks T1.1, T1.2, T1.3 and T1.4. [month 2] Schedule of relevant Milestones Milestone number 59 Milestone name Lead benefi- ciary number Delivery date from Annex I 60 Comments MS1 New scientific knowledge generated 6 9 The technical specifications are defined, reports on design of novel Stirling engine and model of Stirling heat pump and oscillating electrical machine are submitted, regenerator material is designed Project Number 1‌ 286814 Project Acronym 2 EFFiHEAT One form per Work Package Work package number 53 WP2 Type of activity 54 RTD Work package title Development of novel design Stirling engine Start month 2 End month 12 Lead beneficiary number 55 7 Objectives •To optimise the free-swinging piston engine mechanism to design economically viable Stirling engine. Description of work and role of partners A successful realisation of commercial Stirling engine is conditioned by its correct conceptual design and optimal constructional and technological mode of all parts. The free-swinging piston engine mechanism (described in section B1.2) will be central to the engine design. The strength, dynamics and thermodynamic cycles of the engine parts will be modeled using ANSYS DesignSpace software.
AutoNDA by SimpleDocs

Related to Technical specifications for Stirling heat pump

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • General specifications 6.1.1. A vehicle and its electrical/electronic system(s) or ESA(s) shall be so designed, constructed and fitted as to enable the vehicle, in normal conditions of use, to comply with the requirements of this Regulation.

  • Solicitations for Subcontractors, Including Procurements of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin, sex, age, and disability/handicap.

  • Packing Materials and Containers for Shipment Packing materials and containers in which a good is packed for shipment shall be disregarded in determining whether:

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Billing Specifications 55.6.1 The Parties agree that billing requirements and outputs will be consistent with the Ordering & Billing Form (OBF) and also with Telcordia Technologies Billing Output Specifications (BOS).

  • EODUF Packing Specifications 7.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Packaging Materials and Containers for Retail Sale Packaging materials and containers in which a good is packaged for retail sale shall, if classified with the good, be disregarded in determining whether all the non-originating materials used in the production of the good undergo the applicable change in tariff classification set out in Annex 4, and, if the good is subject to a regional value-content requirement, the value of such packaging materials and containers shall be taken into account as originating or non-originating materials, as the case may be, in calculating the regional value content of the good.

Time is Money Join Law Insider Premium to draft better contracts faster.