Common use of Temperature continuously Clause in Contracts

Temperature continuously. To the extent the Interconnected Party can demonstrate to First Gas with reasonable supporting evidence (including by reference to the design and operation of the relevant gas production and processing facility) that: none of the characteristics or components in the above table can exceed; or one or more of the components (e) to (h) in the above table does not occur at all, or occurs only at a much lower concentration compared to, the relevant limit set out in the Gas Specification, the Interconnected Party may with First Gas’ written approval (not to be unreasonably withheld or delayed) measure and/or determine that characteristic or component less frequently than stipulated in the above table, provided always that its monitoring is sufficient to demonstrate compliance with the Gas Specification. First Gas may disclose any exceptions to the testing frequencies set out in section 6.10 to any other person, including by publishing that information on XXXXX. Where it also produces the gas it injects, the Interconnected Party shall at its cost test for each of the components (e) to (h) in section 6.10 following any material change in the source or composition of its gas, including in the proportions of gas obtained from any new reservoir and/or production zones in any reservoir. The Interconnected Party shall determine the values of the characteristics or components (d) to (i) in section 6.10 by direct measurement or testing. When so doing the Interconnected Party shall use only: industry standard equipment and facilities and suitably qualified and competent persons; and either the relevant test method specified in the Gas Specification or such other method as will produce results that are no less accurate or reproducible. The Interconnected Party may determine the value of characteristic (c) in section 6.10 by calculation from the composition of gas injected, provided that: it obtains First Gas’ approval (not to be unreasonably withheld); and the method it uses is sufficiently accurate to meet the requirements of the Gas Specification. No Contaminants During both normal operations and when pigging or otherwise cleaning its Pipeline, the Interconnected Party shall ensure that all gas it injects at a Receipt Point is free of dust and other solid and liquid matter, including hydrocarbon liquids, wax, gums, compressor oil and unsaturated hydrocarbons, that might cause damage to or interfere with First Gas Equipment or First Gas’ Pipeline through which it flows, either immediately or over time.

Appears in 2 contracts

Samples: Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Temperature continuously. To the extent that the Interconnected Party can demonstrate to First Gas with reasonable supporting evidence (including by reference to the design and operation of the relevant gas production and processing facility) that: none of the characteristics or components in the above table can exceed; or one anyone or more of the components (e) to (h) (inclusive) in the above table does is absent from the Gasdoes not occur at all, or occurs presentoccurs only at a much very lowmuch lower concentration compared to, the relevant limit set out in the Gas Specification, the Interconnected Party may with First Gas’ written approval (not to be unreasonably withheld or delayed) measure and/or determine that characteristic or the concentration of that component less frequently than stipulated in the above table, provided always that its monitoring is must beis sufficient to demonstrate compliance with the Gas Specification. First Gas may disclose any testing frequency exceptions to agreed with the Interconnected Party pursuant toto the testing frequencies set out in section 6.10 6.9 to any other person, including by publishing that information on XXXXX. Where it also is the producer ofalso produces the gas it injected at a Receipt Pointit injects, the Interconnected Party shall at its cost test for each alleach of the components (e) to (h) in section 6.10 6.9 following any material change in the source or composition of its gas, including in the proportions of gas obtained from any new reservoir and/or production zones in any reservoir. The Interconnected Party shall determine the values concentrationsvalues of the characteristics or components (d) to (ih) (inclusivei) in section 6.10 6.9 by direct measurement or testing. When so doing the Interconnected Party shall use only: industry standard equipment and facilities and suitably qualified and competent persons; and either the relevant test method specified suggested in the Gas Specification or such other method as will produce results that are no less accurate or reproducible. The Interconnected Party may determine the value of characteristic itemcharacteristic (c) in section 6.10 6.9 by calculation from the composition of gas injected, provided that: it obtains First Gas’ approval (not to be unreasonably withheld); and the method it uses is sufficiently accurate to meet the requirements of the Gas Specification. No Contaminants During both normal operations and when pigging or otherwise cleaning its Pipeline, Pipeline (if applicable) the Interconnected Party shall ensure that all gas it injects at a Receipt Point is free of both dust and other solid and liquid matter, including hydrocarbon liquids, wax, gums, compressor oil and unsaturated hydrocarbons, hydrocarbons to an extent that might cause damage to or interfere with the proper operation of any First Gas Equipment or Gas’Gas Equipment, First Gas’ Pipeline through which it flowsor Gas Transmission System, either immediately or over time.. Provide Gas Testing Results Upon First Gas’ written request, the The Interconnected Party shall on request promptly provide First Gas with copies of gas qualityany data from monitoring data and/or the results of any, measuring or testing of gas undertaken pursuant to this section 6, including for up to 5 years prior to the date of the request. First Gas may disclose such information to any other person. The Interconnected Party agrees that any failure by it to comply with this section 6 shall constitute a failure to act as a Reasonable and Prudent Operator and that the limitation of its liability set out in section 16.1 shall not apply. odorisation Requirement

Appears in 1 contract

Samples: Interconnection Agreement

Temperature continuously. To the extent the Interconnected Party can demonstrate to First Gas with reasonable supporting evidence (including by reference to the design and operation of the relevant gas production and processing facility) that: none of the characteristics or components in the above table can exceed; or one or more of the components (e) to (h) in the above table does not occur at all, or occurs only at a much lower concentration compared to, the relevant limit set out in the Gas Specification, the Interconnected Party may with First Gas’ written approval (not to be unreasonably withheld or delayed) measure and/or determine that characteristic or component less frequently than stipulated in the above table, provided always that its monitoring is sufficient to demonstrate compliance with the Gas Specification. First Gas may disclose any exceptions agreed with the Interconnected Party to the testing frequencies set out in section 6.10 6.910 to any other person, including by publishing that information on XXXXX. Where it also produces the gas it injects, the Interconnected Party shall at its cost test for each of the components (e) to (h) in section 6.10 6.910 following any material change in the source or composition of its gas, including in the proportions of gas obtained from any new reservoir and/or production zones in any reservoir. The Interconnected Party shall determine the values of the characteristics or components (d) to (i) in section 6.10 6.910 by direct measurement or testing. When so doing the Interconnected Party shall use only: industry standard equipment and facilities and suitably qualified and competent persons; and either the relevant test method specified suggested in the Gas Specification or such other method as will produce results that are no less accurate or reproducible. The Interconnected Party may determine the value of characteristic (c) in section 6.10 6.910 by calculation from the composition of gas injected, provided that: it obtains First Gas’ approval (not to be unreasonably withheld); and the method it uses is sufficiently accurate to meet the requirements of the Gas Specification. No Contaminants During both normal operations and when pigging or otherwise cleaning its PipelinePipeline (if applicable), the Interconnected Party shall ensure that all gas it injects at a Receipt Point is free of both dust and other solid and liquid matter, including hydrocarbon liquids, wax, gums, compressor oil and unsaturated hydrocarbons, hydrocarbons to an extent that might cause damage to or interfere with the proper operation of any First Gas Equipment Equipment, or First Gas’ Pipeline through which it flowsor Transmission System, either immediately or over time. Provide Gas Testing Results The Interconnected Party shall on request promptly provide First Gas with copies of any data from monitoring, measuring or testing of gas undertaken pursuant to this section 6, including for up to 5 years prior to the date of the request. First Gas may disclose such information to any other person., including by publishing that information on XXXXX. The Interconnected Party agrees that any failureinjection by it to comply with this section 6of Non-Specification Gas shall constitute a failure to act as a Reasonable and Prudent Operator and that the limitation of its liability set out in section 16.1 shall not apply. odorisation Odorised Pipeline If First Gas’ Pipeline is stipulated as “Odorised” in Schedule One, there shallmust be appropriate Odorisation Facilities to odorise all Gas injected at that Receipt Point to ensure that all Gas injected complies with the detectability requirements set out in New Zealand Standard 5263:2003: Gas Detection and Odorisation. First Gas will specify the odorant that must be used. Ownership of Odorisation Facilities In respect of anany Additional Receipt Point, where its on an Odorised Pipeline is stipulated as “Odorised”, First Gas may elect, but shall not be obliged to own the required Odorisation Facilities. The design, construction, operation and maintenance of Odorisation Facilities shall be the responsibility of theirthe owner of the Odorisation Facilities.

Appears in 1 contract

Samples: Interconnection Agreement

Temperature continuously. To the extent the Interconnected Party can demonstrate to First Gas with reasonable supporting evidence (including by reference to the design and operation of the relevant gas production and processing facility) that: none of the characteristics or components in the above table can exceed; or one or more of the components (e) to (h) in the above table does not occur at all, or occurs only at a much lower concentration compared to, the relevant limit set out in the Gas Specification, the Interconnected Party may with First Gas’ written approval (not to be unreasonably withheld or delayed) measure and/or determine that characteristic or component less frequently than stipulated in the above table, provided always that its monitoring is sufficient to demonstrate compliance with the Gas Specification. First Gas may disclose any exceptions to the testing frequencies set out in section 6.10 to any other person, including by publishing that information on XXXXX. Where it also produces the gas it injects, the Interconnected Party shall at its cost test for each of the components (e) to (h) in section 6.10 following any material change in the source or composition of its gas, including in the proportions of gas obtained from any new reservoir and/or production zones in any reservoir. The Interconnected Party shall determine the values of the characteristics or components (d) to (i) in section 6.10 by direct measurement or testing. When so doing the Interconnected Party shall use only: industry standard equipment and facilities and suitably qualified and competent persons; and either the relevant test method suggested specified in the Gas Specification or such other method as will produce results that are no less accurate or reproducible. The Interconnected Party may determine the value of characteristic (c) in section 6.10 by calculation from the composition of gas injected, provided that: it obtains First Gas’ approval (not to be unreasonably withheld); and the method it uses is sufficiently accurate to meet the requirements of the Gas Specification. No Contaminants During both normal operations and when pigging or otherwise cleaning its Pipeline, the Interconnected Party shall ensure that all gas it injects at a Receipt Point is free of both dust and other solid and liquid matter, including hydrocarbon liquids, wax, gums, compressor oil and unsaturated hydrocarbons, to an extent that might cause damage to or interfere with the proper operation of any First Gas Equipment or First Gas’ Pipeline through which it flowsPipeline, either immediately or over time.. Provide Gas Testing Results The Interconnected Party shall on request promptly provide First Gas with copies of any data from monitoring, measuring or testing of gas undertaken pursuant to this section 6, including for a period of up to 5 years prior to the date of the request. First Gas may disclose such information to any other person, including by publishing that information on XXXXX. The Interconnected Party acknowledges and agrees that, for the purposes of the definition of “Reasonable and Prudent Operator”, this section 6 and section 16, any injection by it of Non-Specification Gas shall constitute a failure by the Interconnected Party to act as a Reasonable and Prudent Operator. odorisation

Appears in 1 contract

Samples: Interconnection Agreement

Temperature continuously. To the extent the Interconnected Party can demonstrate to First Gas with reasonable supporting evidence (including by reference to the design and operation of the relevant gas production and processing facility) that: none of the characteristics or components in the above table can exceed; or one or more of the components (e) to (h) in the above table does not occur at all, or occurs only at a much lower concentration compared to, the relevant limit set out in the Gas Specification, the Interconnected Party may with First Gas’ written approval (not to be unreasonably withheld or delayed) measure and/or determine that characteristic or component less frequently than stipulated in the above table, provided always that its monitoring is sufficient to demonstrate compliance with the Gas Specification. First Gas may disclose any exceptions to the testing frequencies set out in section 6.10 to any other person, including by publishing that information on XXXXX. Where it also produces the gas it injects, the Interconnected Party shall at its cost test for each of the components (e) to (h) in section 6.10 following any material change in the source or composition of its gas, including in the proportions of gas obtained from any new reservoir and/or production zones in any reservoir. The Interconnected Party shall determine the values of the characteristics or components (d) to (i) in section 6.10 by direct measurement or testing. When so doing the Interconnected Party shall use only: industry standard equipment and facilities and suitably qualified and competent persons; and either the relevant test method specified in the Gas Specification or such other method as will produce results that are no less accurate or reproducible. The Interconnected Party may determine the value of characteristic (c) in section 6.10 by calculation from the composition of gas injected, provided that: it obtains First Gas’ approval (not to be unreasonably withheld); and the method it uses is sufficiently accurate to meet the requirements of the Gas Specification. No Contaminants During both normal operations and when pigging or otherwise cleaning its Pipeline, the Interconnected Party shall ensure that all gas it injects at a Receipt Point is free of dust and other solid and liquid matter, including hydrocarbon liquids, wax, gums, compressor oil and unsaturated hydrocarbons, that might cause damage to or interfere with the proper operation of any First Gas Equipment or First Gas’ Pipeline through which it flowsPipeline, either immediately or over time.. Provide Gas Testing Results The Interconnected Party shall on request promptly provide First Gas with copies of any data from monitoring, measuring or testing of gas undertaken pursuant to this section 6, including for a period of up to 5 years prior to the date of the request. First Gas may disclose such information to any other person, including by publishing that information on XXXXX. RPO The Interconnected Party acknowledges and agrees that, for the purposes of the definition of “Reasonable and Prudent Operator”, this section 6 and section 16, any injection by it of Non-Specification Gas shall constitute a failure by the Interconnected Party to act as a Reasonable and Prudent Operator. odorisation

Appears in 1 contract

Samples: Interconnection Agreement

Temperature continuously. To the extent the Interconnected Party can demonstrate to First Gas with reasonable supporting evidence (including by reference to the design and operation of the relevant gas production and processing facility) that: none of the characteristics or components in the above table can exceed; or one or more of the components (e) to (h) in the above table does not occur at all, or occurs only at a much lower concentration compared to, the relevant limit set out in the Gas Specification, the Interconnected Party may with First Gas’ written approval (not to be unreasonably withheld or delayed) measure and/or determine that characteristic or component less frequently than stipulated in the above table, provided always that its monitoring is sufficient to demonstrate compliance with the Gas Specification. First Gas may disclose any exceptions to the testing frequencies set out in section 6.10 to any other person, including by publishing that information on XXXXX. Where it also produces the gas it injects, the Interconnected Party shall at its cost test for each of the components (e) to (h) in section 6.10 following any material change in the source or composition of its gas, including in the proportions of gas obtained from any new reservoir and/or production zones in any reservoir. The Interconnected Party shall determine the values of the characteristics or components (d) to (i) in section 6.10 by direct measurement or testing. When so doing the Interconnected Party shall use only: industry standard equipment and facilities and suitably qualified and competent persons; and either the relevant test method specified suggested in the Gas Specification or such other method as will produce results that are no less accurate or reproducible. The Interconnected Party may determine the value of characteristic (c) in section 6.10 by calculation from the composition of gas injected, provided that: it obtains First Gas’ approval (not to be unreasonably withheld); and the method it uses is sufficiently accurate to meet the requirements of the Gas Specification. No Contaminants During both normal operations and when pigging or otherwise cleaning its Pipeline, the Interconnected Party shall ensure that all gas it injects at a Receipt Point is free of both dust and other solid and liquid matter, including hydrocarbon liquids, wax, gums, compressor oil and unsaturated hydrocarbons, hydrocarbons to an extent that might cause damage to or interfere with the proper operation of any First Gas Equipment or First Gas’ Pipeline through which it flowsPipeline, either immediately or over time. Provide Gas Testing Results The Interconnected Party shall on request promptly provide First Gas with copies of any data from monitoring, measuring or testing of gas undertaken pursuant to this section 6, including for up to 5 years prior to the date of the request. First Gas may disclose such information to any other person, including by publishing that information on XXXXX. The Interconnected Party agrees that any injection by it of Non-Specification Gas shall constitute a failure to act as a Reasonable and Prudent Operator. odorisation Odorised Pipeline If First Gas’ Pipeline is stipulated as “Odorised” in Schedule One, there must be appropriate Odorisation Facilities at that Receipt Point to ensure that all Gas injected complies with the detectability requirements set out in New Zealand Standard 5263:2003: Gas Detection and Odorisation. First Gas will specify the odorant that must be used. Ownership of Odorisation Facilities In respect of any Additional Receipt Point on an Odorised Pipeline, First Gas may elect, but shall not be obliged to own the required Odorisation Facilities. The design, construction, operation and maintenance of Odorisation Facilities shall be the responsibility of the owner of the Odorisation Facilities.

Appears in 1 contract

Samples: Interconnection Agreement

Temperature continuously. To the extent that the Interconnected Party can demonstrate to First Gas with reasonable supporting evidence (including by reference to the design and operation of the relevant gas production and processing facility) that: none of the characteristics or components in the above table can exceed; or one or more any of the components (e) to (h) (inclusive) in the above table does not occur at allis absent from the Gas, or occurs present only at a much lower very low concentration compared to, the relevant limit set out in the Gas Specification, the Interconnected Party may with First Gas’ written approval (not to be unreasonably withheld or delayed) measure and/or determine that characteristic or the concentration of that component less frequently than stipulated in the above table, provided always that its monitoring is must be sufficient to demonstrate compliance with the Gas Specification. First Gas may disclose any testing frequency exceptions agreed with the Interconnected Party pursuant to the testing frequencies set out in section 6.10 6.9 to any other person, including by publishing that information on XXXXX. Where it also produces is the producer of the gas it injectsinjected at a Receipt Point, the Interconnected Party shall at its cost test for each of all the components (e) to (h) in section 6.10 6.9 following any material change in the source or composition of its gas, including in the proportions of gas obtained from any new reservoir and/or production zones in any reservoir. The Interconnected Party shall determine the values concentrations of the characteristics or components (d) to (ih) (inclusive) in section 6.10 6.9 by direct measurement or testing. When so doing the Interconnected Party shall use only: industry standard equipment and facilities and suitably qualified and competent persons; and either the relevant test method specified suggested in the Gas Specification or such other method as will produce results that are no less accurate or reproducible. The Interconnected Party may determine the value of characteristic item (c) in section 6.10 6.9 by calculation from the composition of gas injected, provided that: it obtains First Gas’ approval (not to be unreasonably withheld); and the method it uses is sufficiently accurate to meet the requirements of the Gas Specification. No Contaminants During both normal operations and when pigging or otherwise cleaning its Pipeline, Pipeline (if applicable) the Interconnected Party shall ensure that all gas it injects at a Receipt Point is free of both dust and other solid and liquid matter, including hydrocarbon liquids, wax, gums, compressor oil and unsaturated hydrocarbons, hydrocarbons to an extent that might cause damage to or interfere with the proper operation of First Gas Equipment or Gas’ Equipment, First Gas’ Pipeline through which it flowsor Gas Transmission System, either immediately or over time. Provide Gas Testing Results Upon First Gas’ written request, the Interconnected Party shall promptly provide First Gas with copies of gas quality monitoring data and/or the results of any measuring or testing of gas undertaken pursuant to this section 6. First Gas may disclose such information to any other person. The Interconnected Party agrees that any failure by it to comply with this section 6 shall constitute a failure to act as a Reasonable and Prudent Operator and that the limitation of its liability set out in section 16.1 shall not apply. odorisation Requirement If First Gas’ Pipeline is stipulated as “Odorised” in Schedule One, appropriate Odorisation Facilities must be installed and all Gas injected at the Receipt Point must be odorised. In this Agreement, any reference to “odorisation” means odorisation of Gas in compliance with New Zealand Standard 5263:2003: Gas Detection and Odorisation. First Gas shall specify the odorant to be used, from time to time. Ownership of Odorisation Facilities First Gas may choose to be, but is not obliged to be the Odorisation Facilities Owner. The design, construction, operation and maintenance of the Odorisation Facilities shall be the responsibility of the Odorisation Facilities Owner.

Appears in 1 contract

Samples: Interconnection Agreement

AutoNDA by SimpleDocs

Temperature continuously. To the extent the Interconnected Party can demonstrate to First Gas with reasonable supporting evidence (including by reference to the design and operation of the relevant gas production and processing facility) that: none of the characteristics or components in the above table can exceed; or one or more of the components (e) to (h) in the above table does not occur at all, or occurs only at a much lower concentration compared to, the relevant limit set out in the Gas Specification, the Interconnected Party may with First Gas’ written approval (not to be unreasonably withheld or delayed) measure and/or determine that characteristic or component less frequently than stipulated in the above table, provided always that its monitoring is sufficient to demonstrate compliance with the Gas Specification. First Gas may disclose any exceptions agreed with the Interconnected Party to the testing frequencies set out in section 6.10 6.9 to any other person, including by publishing that information on XXXXX. Where it also produces the gas it injects, the Interconnected Party shall at its cost test for each of the components (e) to (h) in section 6.10 6.9 following any material change in the source or composition of its gas, including in the proportions of gas obtained from any new reservoir and/or production zones in any reservoir. The Interconnected Party shall determine the values of the characteristics or components (d) to (i) in section 6.10 6.9 by direct measurement or testing. When so doing the Interconnected Party shall use only: industry standard equipment and facilities and suitably qualified and competent persons; and either the relevant test method specified suggested in the Gas Specification or such other method as will produce results that are no less accurate or reproducible. The Interconnected Party may determine the value of characteristic (c) in section 6.10 6.9 by calculation from the composition of gas injected, provided that: it obtains First Gas’ approval (not to be unreasonably withheld); and the method it uses is sufficiently accurate to meet the requirements of the Gas Specification. No Contaminants During both normal operations and when pigging or otherwise cleaning its Pipeline, Pipeline (if applicable) the Interconnected Party shall ensure that all gas it injects at a Receipt Point is free of both dust and other solid and liquid matter, including hydrocarbon liquids, wax, gums, compressor oil and unsaturated hydrocarbons, hydrocarbons to an extent that might cause damage to or interfere with the proper operation of any First Gas Equipment or Equipment, First Gas’ Pipeline through which it flowsor Transmission System, either immediately or over time. Provide Gas Testing Results The Interconnected Party shall on request promptly provide First Gas with copies of any data from monitoring, measuring or testing of gas undertaken pursuant to this section 6, including for up to 5 years prior to the date of the request. First Gas may disclose such information to any other person. The Interconnected Party agrees that any failure by it to comply with this section 6 shall constitute a failure to act as a Reasonable and Prudent Operator and that the limitation of its liability set out in section 16.1 shall not apply. odorisation Odorised Pipeline If First Gas’ Pipeline is stipulated as “Odorised” in Schedule One, there shall be appropriate Odorisation Facilities to odorise all Gas injected at that Receipt Point complies with the detectability requirements set out in New Zealand Standard 5263:2003: Gas Detection and Odorisation. First Gas will specify the odorant that must be used. Ownership of Odorisation Facilities In respect of an Additional Receipt Point, where its Pipeline is stipulated as “Odorised” First Gas may elect, but shall not be obliged to own the Odorisation Facilities. The design, construction, operation and maintenance of Odorisation Facilities shall be the responsibility of their owner. Land for Odorisation Facilities Where First Gas elects to own Odorisation Facilities it may require the Interconnected Party to provide it with an area of land at or adjacent to the Receipt Point (or Metering), free of any charge to First Gas, which First Gas reasonably agrees is sufficient to accommodate the Odorisation Facilities. The Interconnected Party will grant First Gas a bare licence to occupy and use that land for all purposes associated with the installation, operation (including unloading, storage and load-out of odorant), maintenance, repair, upgrade and replacement of Odorisation Facilities. When undertaking any of the activities referred to in section 7.3, First Gas shall comply with the requirements of section 13.2.

Appears in 1 contract

Samples: Interconnection Agreement

Temperature continuously. To the extent the Interconnected Party can demonstrate to First Gas with reasonable supporting evidence (including by reference to the design and operation of the relevant gas production and processing facility) that: none of the characteristics or components in the above table can exceed; or one or more of the components (e) to (h) in the above table does not occur at all, or occurs only at a much lower concentration compared to, the relevant limit set out in the Gas Specification, the Interconnected Party may with First Gas’ written approval (not to be unreasonably withheld or delayed) measure and/or determine that characteristic or component less frequently than stipulated in the above table, provided always that its monitoring is sufficient to demonstrate compliance with the Gas Specification. First Gas may disclose any exceptions to the testing frequencies set out in section 6.10 to any other person, including by publishing that information on XXXXXOATIS. Where it also produces the gas it injects, the Interconnected Party shall at its cost test for each of the components (e) to (h) in section 6.10 following any material change in the source or composition of its gas, including in the proportions of gas obtained from any new reservoir and/or production zones in any reservoir. The Interconnected Party shall determine the values of the characteristics or components (d) to (i) in section 6.10 by direct measurement or testing. When so doing the Interconnected Party shall use only: industry standard equipment and facilities and suitably qualified and competent persons; and either the relevant test method suggested specified in the Gas Specification or such other method as will produce results that are no less accurate or reproducible. The Interconnected Party may determine the value of characteristic (c) in section 6.10 by calculation from the composition of gas injected, provided that: it obtains First Gas’ approval (not to be unreasonably withheld); and the method it uses is sufficiently accurate to meet the requirements of the Gas Specification. No Contaminants During both normal operations and when pigging or otherwise cleaning its Pipeline, the Interconnected Party shall ensure that all gas it injects at a Receipt Point is free of both dust and other solid and liquid matter, including hydrocarbon liquids, wax, gums, compressor oil and unsaturated hydrocarbons, to an extent that might cause damage to or interfere with the proper operation of any First Gas Equipment or First Gas’ Pipeline through which it flowsPipeline, either immediately or over time.. Provide Gas Testing Results The Interconnected Party shall on request promptly provide First Gas with copies of any data from monitoring, measuring or testing of gas undertaken pursuant to this section 6, including for a period of up to 5 years prior to the date of the request. First Gas may disclose such information to any other person, including by publishing that information on OATIS. The Interconnected Party acknowledges and agrees that, for the purposes of the definition of “Reasonable and Prudent Operator”, this section 6 and section 16, any injection by it of Non-Specification Gas shall constitute a failure by the Interconnected Party to act as a Reasonable and Prudent Operator. odorisation

Appears in 1 contract

Samples: Interconnection Agreement

Temperature continuously. To the extent the Interconnected Party can demonstrate to First Gas with reasonable supporting evidence (including by reference to the design and operation of the relevant gas production and processing facility) that: none of the characteristics or components in the above table can exceed; or one or more of the components (e) to (h) in the above table does not occur at all, or occurs only at a much lower concentration compared to, the relevant limit set out in the Gas Specification, the Interconnected Party may with First Gas’ written approval (not to be unreasonably withheld or delayed) measure and/or determine that characteristic or component less frequently than stipulated in the above table, provided always that its monitoring is sufficient to demonstrate compliance with the Gas Specification. First Gas may disclose any exceptions to the testing frequencies set out in section 6.10 to any other person, including by publishing that information on XXXXX. Where it also produces the gas it injects, the Interconnected Party shall at its cost test for each of the components (e) to (h) in section 6.10 following any material change in the source or composition of its gas, including in the proportions of gas obtained from any new reservoir and/or production zones in any reservoir. The Interconnected Party shall determine the values of the characteristics or components (d) to (i) in section 6.10 by direct measurement or testing. When so doing the Interconnected Party shall use only: industry standard equipment and facilities and suitably qualified and competent persons; and either the relevant test method suggested specified in the Gas Specification or such other method as will produce results that are no less accurate or reproducible. The Interconnected Party may determine the value of characteristic (c) in section 6.10 by calculation from the composition of gas injected, provided that: it obtains First Gas’ approval (not to be unreasonably withheld); and the method it uses is sufficiently accurate to meet the requirements of the Gas Specification. No Contaminants During both normal operations and when pigging or otherwise cleaning its Pipeline, the Interconnected Party shall ensure that all gas it injects at a Receipt Point is free of both dust and other solid and liquid matter, including hydrocarbon liquids, wax, gums, compressor oil and unsaturated hydrocarbons, to an extent that might cause damage to or interfere with the proper operation of any First Gas Equipment or First Gas’ Pipeline through which it flowsPipeline, either immediately or over time. Provide Gas Testing Results The Interconnected Party shall on request promptly provide First Gas with copies of any data from monitoring, measuring or testing of gas undertaken pursuant to this section 6, including for a period of up to 5 years prior to the date of the request. First Gas may disclose such information to any other person, including by publishing that information on XXXXX. The Interconnected Party acknowledges and agrees that, for the purposes of the definition of “Reasonable and Prudent Operator”, this section 6 and section 16, any injection by it of Non-Specification Gas shall constitute a failure by the Interconnected Party to act as a Reasonable and Prudent Operator.

Appears in 1 contract

Samples: Interconnection Agreement

Temperature continuously. To the extent the Interconnected Party can demonstrate to First Gas with reasonable supporting evidence (including by reference to the design and operation of the relevant gas production and processing facility) that: none of the characteristics or components in the above table can exceed; or one or more of the components (e) to (h) in the above table does not occur at all, or occurs only at a much lower concentration compared to, the relevant limit set out in the Gas Specification, the Interconnected Party may with First Gas’ written approval (not to be unreasonably withheld or delayed) measure and/or determine that characteristic or component less frequently than stipulated in the above table, provided always that its monitoring is sufficient to demonstrate compliance with the Gas Specification. First Gas may disclose any exceptions to the testing frequencies set out in section 6.10 to any other person, including by publishing that information on XXXXX. Where it also produces the gas it injects, the Interconnected Party shall at its cost test for each of the components (e) to (h) in section 6.10 following any material change in the source or composition of its gas, including in the proportions of gas obtained from any new reservoir and/or production zones in any reservoir. The Interconnected Party shall determine the values of the characteristics or components (d) to (i) in section 6.10 by direct measurement or testing. When so doing the Interconnected Party shall use only: industry standard equipment and facilities and suitably qualified and competent persons; and either the relevant test method specified suggested in the Gas Specification or such other method as will produce results that are no less accurate or reproducible. The Interconnected Party may determine the value of characteristic (c) in section 6.10 by calculation from the composition of gas injected, provided that: it obtains First Gas’ approval (not to be unreasonably withheld); and the method it uses is sufficiently accurate to meet the requirements of the Gas Specification. No Contaminants During both normal operations and when pigging or otherwise cleaning its Pipeline, the Interconnected Party shall ensure that all gas it injects at a Receipt Point is free of both dust and other solid and liquid matter, including hydrocarbon liquids, wax, gums, compressor oil and unsaturated hydrocarbons, hydrocarbons to an extent that might cause damage to or interfere with the proper operation of any First Gas Equipment or First Gas’ Pipeline through which it flowsPipeline, either immediately or over time.. Provide Gas Testing Results The Interconnected Party shall on request promptly provide First Gas with copies of any data from monitoring, measuring or testing of gas undertaken pursuant to this section 6, including for up to 5 years prior to the date of the request. First Gas may disclose such information to any other person, including by publishing that information on XXXXX. The Interconnected Party agrees that any injection by it of Non-Specification Gas shall constitute a failure to act as a Reasonable and Prudent Operator. odorisation Odorised Pipeline If First Gas’ Pipeline is stipulated as “Odorised” in Schedule One, there must be appropriate Odorisation Facilities at that Receipt Point to ensure that all Gas injected complies with the detectability requirements set out in New Zealand Standard 5263:2003: Gas Detection and Odorisation. First Gas will specify the odorant that must be used. Ownership of Odorisation Facilities In respect of any Additional Receipt Point on an Odorised Pipeline, First Gas may elect, but shall not be obliged to own the required Odorisation Facilities. The design, construction, operation and maintenance of Odorisation Facilities shall be the responsibility of the owner of the Odorisation Facilities. Odorisation Facilities The Odorisation Facilities may include: an odorant storage vessel not exceeding 5 cubic metres capacity; a primary means of odorisation (e.g. an odorant injection pump); a control system to regulate the injection of odorant;

Appears in 1 contract

Samples: Interconnection Agreement