TGB tariff Sample Clauses

TGB tariff. Tickets issued from/to the stations Bruxelles and Liège using the TGB Tariff – “toute gare belge” (French for “all Belgian stations”) are also valid to/from all stations in Belgium. Tickets issued from/to the station Bruxelles-Midi are also valid from/to the stations Bruxelles Central, Bruxelles Nord, Bruxelles Quartier Leopold and Bruxelles Xxxxxxx.
AutoNDA by SimpleDocs

Related to TGB tariff

  • Tariff 2.95.1 Any applicable Federal or state tariff of a Party, as amended from time- to-time; 2.95.2 Any standard agreement or other document, as amended from time-to- time, that sets forth the generally available terms, conditions and prices under which a Party offers a Service. The term “Tariff” does not include any Verizon statement of generally available terms (SGAT) which has been approved or is pending approval by the Commission pursuant to Section 252(f) of the Act.

  • Non-tariff Measures 1. A Party shall not adopt or maintain any non-tariff measures on the importation of any good of the other Party or on the exportation of any good destined for the territory of the other Party except in accordance with its WTO rights and obligations or in accordance with other provisions of this Agreement. 2. Each Party shall ensure its non-tariff measures permitted in paragraph 1 are not prepared, adopted or applied with a view to, or with the effect of, creating unnecessary obstacles to trade between the Parties.

  • APPLICABLE TARIFF 9.1 Subsequent to commencement of power supply by the RPD on the terms contained in this Agreement, the RPD shall be entitled to receive the tariff of Rs. /kWh [Insert the Tariff discovered through the bidding process conducted by SECI], fixed for the entire Term of this Agreement. 9.2 In cases of early commencement of power supply, till SCSD, the RPD will be free to sell the electricity generated to any entity other than the SECI/ Buying Entity(ies), only after giving the first right of refusal to the SECI/Buying Entity(ies). The Buying Entity(ies)/SECI shall provide refusal within 15 (fifteen) Days from the receipt of the request, beyond which it would be considered as deemed refusal. The 15-Day period will be applicable separately for SECI and the Buying Entity(ies). In case SECI/Buying Entity agree to purchase power from a date prior to the SCSD, such power shall be purchased at the Applicable Tariff plus SECI’s trading margin. 9.3 In case of multiple Project components, and in case one or more such component (wind or solar PV or any other RE power generating source) is ready for injection of power into the grid, but the remaining component is unable to commence power supply, the RPD will be allowed to commence power supply from such component which is ready, outside the ambit of this Agreement. Following should be noted under this scenario: (a) First right of refusal for such power shall vest with the Buying Entity(ies). Subsequent to refusal of such power by the Buying Entity(ies), the right of refusal shall vest with SECI. (b) In case SECI/Buying Entity(ies) decides to buy such discrete component’s power outside the PPA, such power shall be purchased at 50% of the Applicable Tariff. In case the same is procured through SECI, trading margin of Rs. 0.07/kWh will be applicable on such power procurement. (c) The above scenario will be applicable until the RPD commences supply of power to the Buying Entity(ies) under the provisions of this Agreement.

  • Uncontrollable Forces Tariff Provisions Section 14.1 of the CAISO Tariff shall be incorporated by reference into this Agreement except that all references in Section 14.1 of the CAISO Tariff to Market Participants shall be read as a reference to the Participating Generator and references to the CAISO Tariff shall be read as references to this Agreement.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5. 1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Interconnection Customer Authority Consistent with Good Utility Practice, this LGIA, and the CAISO Tariff, the Interconnection Customer may take actions or inactions with regard to the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities during an Emergency Condition in order to (i) preserve public health and safety, (ii) preserve the reliability of the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities,

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.