TILT-UP CONCRETE WALL PANELS Sample Clauses

TILT-UP CONCRETE WALL PANELS. 1. 4,000 psi concrete wall panels are included around the entire building perimeter.
AutoNDA by SimpleDocs
TILT-UP CONCRETE WALL PANELS. A. Panels shall be approximately 7.25” thick, 4,000 PSI normal weight non-insulated concrete wall panels. Reinforcing pattern per structural engineer’s tilt drawings. Tilt-up wall panels shall have smooth hard trowel finish on the interior side of the panel, not a broom finish. Tilt-up brace and pick point holes will be covered with a plastic escutcheon DIVISION V - METALS

Related to TILT-UP CONCRETE WALL PANELS

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • External Hosting Facilities Transfer Agent shall implement controls, consistent with applicable prevailing industry practices and standards, regarding the collection, use, storage and/or disclosure of Fund Data by an external hosting provider.

  • Floor Load Tenant shall not place a load upon any floor of the Premises that exceeds 50 pounds per square foot “live load”. Landlord reserves the right to reasonably designate the position of all Equipment which Tenant wishes to place within the Premises, and to place limitations on the weight thereof.

  • FLOORING Grade and quality of carpeting to be selected by Landlord, with color to be selected by Tenant from those offered by Landlord.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Commissioning preparation of a system or systems to allow hydrocarbons or other process fluids to be safely introduced into the system or systems for processing. In this phase testing will focus on systems, including utilities.

  • Benchmark Unavailability Period Upon the Borrower’s receipt of notice of the commencement of a Benchmark Unavailability Period, the Borrower may revoke any pending request for a SOFR Borrowing of, conversion to or continuation of SOFR Loans to be made, converted or continued during any Benchmark Unavailability Period and, failing that, the Borrower will be deemed to have converted any such request into a request for a Borrowing of or conversion to Base Rate Loans. During a Benchmark Unavailability Period or at any time that a tenor for the then-current Benchmark is not an Available Tenor, the component of Base Rate based upon the then-current Benchmark or such tenor for such Benchmark, as applicable, will not be used in any determination of Base Rate.

  • Project or Building Name and Signage Landlord shall have the right at any time to change the name of the Project or Building and to install, affix and maintain any and all signs on the exterior and on the interior of the Project or Building as Landlord may, in Landlord’s sole discretion, desire. Tenant shall not use the name of the Project or Building or use pictures or illustrations of the Project or Building in advertising or other publicity or for any purpose other than as the address of the business to be conducted by Tenant in the Premises, without the prior written consent of Landlord.

  • Parking Facilities All parking areas now or hereafter made available by Landlord for use by tenants, including, without limitation, open-air parking, parking decks and parking areas under or within the Building, whether reserved, exclusive, non-exclusive or otherwise.

Time is Money Join Law Insider Premium to draft better contracts faster.