Title Examination Within thirty (30) days after Purchaser’s exercise of the Option, Purchaser shall have the right to obtain, at Purchaser’s expense, a current survey of the Property (the “Updated Survey”) and an ALTA Title Commitment for the Property from a title company acceptable to Purchaser (the “Title Company”), setting forth the status of title to the Property, and showing all liens, claims, encumbrances, reservations, restrictions and other matters, if any, relating to the Property (the “Title Commitment”), including legible copies of all encumbrances, restrictive covenants and other documents evidencing exceptions to said Title Commitment (the “Exception Documents”). If the Title Commitment and/or Updated Survey reveals any exception(s) to title to which Purchaser objects (a “Title Objection”) and is(are) not either (i) listed as title exceptions in the title insurance policy and/or survey obtained by Seller in connection with the closing of the Mezzanine Loan and/or (ii) permitted by this Agreement (collectively, the “Permitted Encumbrances”), Purchaser may notify Seller in writing that it would like Seller to cure or remove such Title Objections. Seller shall have the right, but not the obligation (except as set forth below), to remedy or cure any such Title Objection(s) during the twenty (20) day period following Seller’s receipt thereof (the “Cure Period”). Purchaser shall have the continuing right to have such title examination and Title Commitments updated from time to time, and to obtain updates to the Survey, and to give Seller written notice of any Title Objections appearing of record, or otherwise created, after the effective date of the initial Title Commitment and being revealed by any title examination, Survey or investigation of the Property, and Purchaser shall be entitled to object (in the same manner as set forth hereinabove) to matters shown by the updated Title Commitments or updated Survey or investigations. Seller shall have the right, but not the obligation (except as set forth below), to remedy those Title Objections identified by Purchaser to the satisfaction of Purchaser within twenty (20) days after Purchaser’s notice. If any of the Title Objections are not so cured or remedied, or provision satisfactory to Purchaser made therefor, prior to any closing date selected by Purchaser, then Purchaser, at its election, shall have the right and option to either: (a) accept title to the Property subject to said uncured Title Objections that Purchaser elects to accept, and any Title Objection accepted by Purchaser in writing shall become part of the Permitted Encumbrances; or (b) terminate this Agreement by written notice to Seller, in which event, immediately upon receipt of said notice, this Agreement shall terminate, be null and void and of no further force or effect. Notwithstanding the foregoing, Seller, at Seller’s sole cost and expense, shall be obligated to cure or remove at or before Closing all mortgages, deeds of trust, deeds to secure debt, judgments liens, mechanics and materialman’s liens, and other monetary liens against the Property, whether or not Purchaser objects thereto, and Purchaser shall credit the cost to cure, satisfy, release and remove such matters against the Purchase Price provided the same is actually paid by Purchaser or Title Company on Seller’s behalf. In addition, Seller shall not allow any easements, liens, leases, licenses, permits or other encumbrances to be placed on or granted with respect to the Property, nor shall Seller convey any rights in the Property, without the prior written consent of Purchaser, except to the extent expressly permitted, or consented to in writing by Purchaser under the Mezzanine Loan Documents. If any such prohibited easements, liens, leases, licenses, permits or other encumbrances arise after the Effective Date, notwithstanding any other term or provision of this Agreement to the contrary, Seller shall, at its sole cost and expense, cure, satisfy, release and remove such matters prior to Closing; provided, however, that any easements or encumbrances that are taken by eminent domain shall be governed by the terms of Section 5 immediately below.
Title IX Hill College strives to maintain a work and educational environment free from discrimination, sexual harassment, sexual assault, stalking, rape, dating and domestic violence, and related retaliation in accordance with applicable federal and state laws. Students may contact the Office of Student Services, Xxxx of Students, Campus Safety, Campus Security Authority (CSAs) or Title IX Coordinator for assistance with reporting a complaint or may file a complaint online from the Hill College website. The Title IX Coordinator: Xx. Xxxxx Xxxxx Director of Human Resources 000 Xxxxx Xxxxx Hillsboro, TX 76645 254‐659‐7731 or xxxxxx@xxxxxxxxxxx.xxx
TITLE SEARCH Buyer shall be allowed until 6:00 p.m. on the .............. day of ......................................................., 20. , (Requisition Date)
Topographic Survey The Professional shall obtain a topographic and utility survey as described below. 4.1.1. The Professional shall tie in all existing surface topographic features and structures within the survey limits shown in Figure 1. This survey shall include: tops of curbs, edges of pavement, pavement materials, driveways, sidewalks, retaining walls, drainage structures (top, edges and flow line), channels and drainage ways (tops, toes and flow line), manholes (rim, flow lines and diameters of pipes, type of material and photographs of the inside of manholes and drainage structures), including the same survey data for upstream and downstream manholes and structures that are outside of the survey limits for all gravity wastewater and drainage lines within the survey limits. Visible valves, meters, clean-outs, slabs, utility signs, utility poles and structures, fences, landscaping features, shrubbery, trees (including the approximate drip-line), tree canopies, buildings (edges within the survey limits) mailboxes, etc. Trees shall be tagged and tabulated by size and species specific in compliance with the City of New Braunfels Tree Preservation ordinance as defined in the City of New Braunfels Zoning Ordinance Chapter 5.3- 5i. The survey limits shall extend approximately 100 feet on intersecting streets. The Professional shall provide sufficient ground shots to create one (1) foot contours for the Project. 4.1.2. The Professional shall conduct a utility survey and locate existing utilities within the Project boundary in Figure 1. The Professional shall contact all utility service providers by calling Texas 811 and the NBU Project Manager to coordinate flagging of existing franchise utilities. The Professional shall request drawings of existing agency and municipal owned utilities and shall include locations of these utilities in the survey. The Professional shall tie in the locations of the discovered utilities on the survey. The Professional shall bear all costs for the Services associated with utility locates. 4.1.3. The Professional shall locate up to ten (10) geotechnical borings and tie them in to the Project survey. 4.1.4. The Professional shall set and install control points and/or benchmarks as required for the survey work (minimum 1-foot intervals). The Professional shall provide horizontal and vertical coordinates of the benchmarks in the required coordinate system and datum and show the benchmarks on the survey drawing. 4.1.5. The Professional shall research and review adjoining plats and deeds along the survey corridor. The Professional shall locate property corners and identify existing right of way (“ROW”), along the survey corridor, based on found monuments and record documents.
Title IX Rights Advocacy This process may be initiated by a Client who registers a statutory rights violation or a denial or abuse complaint with the County Patients’ Rights Office. The Patients’ Rights office shall investigate the complaint, and Title IX grievance procedures shall apply, which involve ADMINISTRATOR’S Director of Behavioral Health Care and the State Patients’ Rights Office.
Title Exceptions To the best of Borrower’s knowledge after due inquiry and investigation, none of the items shown in the schedule of exceptions to coverage in the title policy issued to and accepted by Lender contemporaneously with the execution of this Loan Agreement and insuring Lender’s interest in the Mortgaged Property will have a Material Adverse Effect on the (a) ability of Borrower to pay the Loan in full, (b) ability of Borrower to use all or any part of the Mortgaged Property in the manner in which the Mortgaged Property is being used on the Closing Date, except as set forth in Section 6.03, (c) operation of the Mortgaged Property, or (d) value of the Mortgaged Property.
Polygraph Examination No employee shall be compelled to submit to a polygraph examination. No disciplinary action whatsoever shall be taken against an employee refusing to submit to a polygraph examination; nor shall any comment be anywhere recorded indicating that an employee offered to take, took or refused to take a polygraph examination unless otherwise agreed to in writing by the parties; nor shall any testimony or evidence of any kind regarding an employee's offer to take, refusal to take, or the results of a polygraph examination be admissible in any proceeding pursuant to this Agreement, unless otherwise agreed to in writing by the parties.
Civil Rights Compliance The parties to this Agreement are responsible for the following:
Certification of Meeting or Exceeding Tobacco-Free Workplace Policy Minimum Standards A. Grantee certifies that it has adopted and enforces a Tobacco-Free Workplace Policy that meets or exceeds all of the following minimum standards of: i. Prohibiting the use of all forms of tobacco products, including but not limited to cigarettes, cigars, pipes, water pipes (hookah), bidis, kreteks, electronic cigarettes, smokeless tobacco, snuff and chewing tobacco; ii. Designating the property to which this Policy applies as a "designated area,” which must at least comprise all buildings and structures where activities funded under this Grant Agreement are taking place, as well as Grantee owned, leased, or controlled sidewalks, parking lots, walkways, and attached parking structures immediately adjacent to this designated area; iii. Applying to all employees and visitors in this designated area; and iv. Providing for or referring its employees to tobacco use cessation services. B. If Grantee cannot meet these minimum standards, it must obtain a waiver from the System Agency.
Examination of work before covering up In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.