Topographic Field Survey Sample Clauses

Topographic Field Survey a) Prepare a one-foot contour interval on-the-ground topographic survey, locating both horizontally and vertically all visible improvements that may impact the site work design. b) Set inter-visible control points in area of construction. Obtain reference ties. c) Set benchmark within building area for construction in accordance with City of Wichita spacing requirements. d) Recover sufficient section and property monumentation as required to enable drafting of boundary lines, right of way lines, and/or foreign easements. e) Collect topographic survey data, including surface locations sufficient to provide 1’ contours. f) Locate all above and below grade utility improvements. PEC will not be responsible for searching for utilities beyond utilizing the One Call system. g) Waterlines are not expected to be located using the One Call system. Top Nut elevations of water valves will be collected and any above grade appurtenances will be located to assist in drafting of water lines from record information. h) Locate all sanitary and storm sewer structures, such as area inlets, curb inlets, junction boxes, manholes, etc., the top of structure information will be collected as well as all flowlines in and out, and pipe size/material. i) Locate all buildings and substantial features, including parking stripes, sidewalks, paving limits/type, playground areas/equipment, landscape areas, etc. j) Any trees four (4) caliper inches and larger shall be identified/shown. k) Survey limits that extend into the adjacent street right of way shall include all improvements/utilities within the half width of right of way. l) Compare record information received from utility providers to actual utilities flagged in the field. Notify locating service of any discrepancies and make a reasonable effort to resolve in the field. Utilities identified in record information that cannot be resolved in the field will be drafted in the general alignment shown in the record information and will be specifically identified as “RECORD” on the deliverable drawing. m) The coordinate base will be Kansas State Plane NAD 83(2011) – South Zone and the elevations will be referenced to the NAVD 88 datum. n) Acquire last Deed of Record for all adjacent non-platted parcels.
AutoNDA by SimpleDocs
Topographic Field Survey. A topographic survey sufficient for the development of one-foot contours will be conducted across the proposed project area as described. The survey will locate features as described below:

Related to Topographic Field Survey

  • Topographic Survey The Professional shall obtain a topographic and utility survey as described below. 4.1.1. The Professional shall tie in all existing surface topographic features and structures within the survey limits shown in Figure 1. This survey shall include: tops of curbs, edges of pavement, pavement materials, driveways, sidewalks, retaining walls, drainage structures (top, edges and flow line), channels and drainage ways (tops, toes and flow line), manholes (rim, flow lines and diameters of pipes, type of material and photographs of the inside of manholes and drainage structures), including the same survey data for upstream and downstream manholes and structures that are outside of the survey limits for all gravity wastewater and drainage lines within the survey limits. Visible valves, meters, clean-outs, slabs, utility signs, utility poles and structures, fences, landscaping features, shrubbery, trees (including the approximate drip-line), tree canopies, buildings (edges within the survey limits) mailboxes, etc. Trees shall be tagged and tabulated by size and species specific in compliance with the City of New Braunfels Tree Preservation ordinance as defined in the City of New Braunfels Zoning Ordinance Chapter 5.3- 5i. The survey limits shall extend approximately 100 feet on intersecting streets. The Professional shall provide sufficient ground shots to create one (1) foot contours for the Project. 4.1.2. The Professional shall conduct a utility survey and locate existing utilities within the Project boundary in Figure 1. The Professional shall contact all utility service providers by calling Texas 811 and the NBU Project Manager to coordinate flagging of existing franchise utilities. The Professional shall request drawings of existing agency and municipal owned utilities and shall include locations of these utilities in the survey. The Professional shall tie in the locations of the discovered utilities on the survey. The Professional shall bear all costs for the Services associated with utility locates. 4.1.3. The Professional shall locate up to ten (10) geotechnical borings and tie them in to the Project survey. 4.1.4. The Professional shall set and install control points and/or benchmarks as required for the survey work (minimum 1-foot intervals). The Professional shall provide horizontal and vertical coordinates of the benchmarks in the required coordinate system and datum and show the benchmarks on the survey drawing. 4.1.5. The Professional shall research and review adjoining plats and deeds along the survey corridor. The Professional shall locate property corners and identify existing right of way (“ROW”), along the survey corridor, based on found monuments and record documents.

  • Adverse Weather Shall be only weather that satisfies all of the following conditions: (1) unusually severe precipitation, sleet, snow, hail, or extreme temperature or air conditions in excess of the norm for the location and time of year it occurred based on the closest weather station data averaged over the past five years, (2) that is unanticipated and would cause unsafe work conditions and/or is unsuitable for scheduled work that should not be performed during inclement weather (i.e., exterior finishes), and (3) at the Project.

  • Firmware 7.1 The Supplier must deliver the equipment, Goods or hardware equipped with all the firmware required to use all the Goods or hardware’s functions. Any software embedded in the equipment, Goods or hardware, including the firmware, is provided to the Local Government with a license to use this software, with all license costs and royalties being included in the Fee Schedule (Schedule C). All firmware will be the most recent version available at the time of shipping.

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • Third Party Technology The Company makes use of third party technology to collect information required for traffic measurement, research, and analytics. Use of third party technology entails data collection. We therefore would like to inform clients the Company enables third parties to place or read cookies located on the browsers of users entering the Company’s domain. Said third parties may also use web beacons to collect information through advertising located on the Company’s web site. Please note that you may change your browser settings to refuse or disable Local Shared Objects and similar technologies; however, by doing so you may be disabling some of the functionality of Company’s services.

  • Patents As to any patentable subject matter contained in the deliverables, the Contractor agrees to disclose such patentable subject matter to the City. Further, if requested by the City, the Contractor agrees to assign and, if necessary, cause each of its employees to assign the entire right, title, and interest to specific inventions under such patentable subject matter to the City and to execute, acknowledge, and deliver and, if necessary, cause each of its employees to execute, acknowledge, and deliver an assignment of letters patent, in a form to be reasonably approved by the City, to the City upon request by the City.

  • License to Use You are authorized to use the Software on one (1) single computer only. You may not use the Software on any other machines other than the said single computer.

  • Patent The development of patentable inventions or discoveries is not the primary purpose of the research activities of the faculty. Employees have no obligation to seek patent protection for the results of scientific work nor to modify research to enhance patentability. 10.6.1 OC agrees that employees have the unqualified right to publish their inventions, improvements, designs or developments and, except as noted in section 10.6.3, OC waives, disclaims and abandons any interest in or claims to any invention, improvement, design or development made by an employee or employees and unless otherwise provided in this Article, any invention, improvement design or development, or any patent arising therefrom shall be the sole property of the inventor(s). 10.6.2 Where the activities are a part of work performed for which OC is not paying the employee from any source and no OC space or equipment is being used, the employee shall be entitled to any and all royalties from such patents. Employees shall have the right to make their own arrangements at their own expense to patent an invention, an improvement, a design or development and, subject to the obligations in the Article and except as noted in section 10.6.3, shall be entitled to all the proceeds therefrom.

  • License for Txdot Logo Use DocuSign Envelope ID: 08011FCF-93C2-4F54-8A05-20A33047A1D8

  • Patent Rights The State and the U. S. Department of Transportation shall have the royalty free, nonexclusive and irrevocable right to use and to authorize others to use any patents developed by the Engineer under this contract.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!