Town Review of Water Distribution System Sample Clauses

Town Review of Water Distribution System. In connection with preliminary and final plat(s) for development within the Battle Retained Parcels, the Town will review locations of the distribution infrastructure to deliver municipal water service outboard from the Water Treatment Plant (e.g., water mains, storage tanks, distribution lines and service lines) to platted development sites within the Battle Retained Parcels (“Water Distribution System”). Engineering and technical requirements of the Water Distribution System will be subject to ERWSD regulations and Town subdivision regulations (including but not limited to applicable fire flow requirements). The Town will not own, operate or maintain the Water Distribution System. Except with respect to the Town’s review of the Water Distribution System as provided above, the Town will not exercise or conduct any technical review of the Water Treatment System, including but not limited to its location, character, and extent pursuant to C.R.S. § 00-00-000.
AutoNDA by SimpleDocs

Related to Town Review of Water Distribution System

  • Distribution System The Transmission Provider's facilities and equipment used to transmit electricity to ultimate usage points such as homes and industries directly from nearby generators or from interchanges with higher voltage transmission networks which transport bulk power over longer distances. The voltage levels at which Distribution Systems operate differ among areas. Distribution Upgrades – The additions, modifications, and upgrades to the Transmission Provider's Distribution System at or beyond the Point of Interconnection to facilitate interconnection of the Small Generating Facility and render the transmission service necessary to effect the Interconnection Customer's wholesale sale of electricity in interstate commerce. Distribution Upgrades do not include Interconnection Facilities.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Disaster Recovery Plan Contractor agrees that upon request of System Agency, Contractor shall provide copies of its most recent business continuity and disaster recovery plans.

  • Proposing Integration Activities in the Planning Submission No integration activity described in section 6.3 may be proposed in a CAPS unless the LHIN has consented, in writing, to its inclusion pursuant to the process set out in section 6.3(b).

  • Requirement for Project Planning No physical work will begin on the construction site until the receipt of a Proceed Order issued by the Owner. The Contract assumes that a Proceed Order will be issued in not more than sixty days from the Effective Date of the Contract. Failure of the Contractor to provide the necessary documentation for the issuance of a Proceed Order shall not entitle the Contractor to any extension of time. If a Proceed Order is not issued within sixty days from the award of the Contract and non-issuance is due to nonperformance by the Contractor, the Contractor may be in default.

  • Emergency Mode Operation Plan Contractor must establish a documented plan to enable continuation of critical business processes and protection of the security of electronic DHCS PHI or PI in the event of an emergency. Emergency means any circumstance or situation that causes normal computer operations to become unavailable for use in performing the work required under this Agreement for more than 24 hours.

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Peer Assistance and Review Program 1. MCEA and MCPS agree to jointly operate a Peer Assistance and Review (PAR) Program. The PAR Program is a mechanism for maintaining systemwide quality control and ensuring that all MCPS teachers responsible for teaching students are functioning at or above the high MCPS standards of performance. It provides intensive assistance for any teacher who has not yet achieved that standard or who falls below acceptable standards. Assistance and review are provided to both experienced MCPS teachers in need of significant improvement and teachers in their first year of teaching.

  • AIN Selective Carrier Routing for Operator Services, Directory Assistance and Repair Centers 4.3.1 BellSouth will provide AIN Selective Carrier Routing at the request of <<customer_name>>. AIN Selective Carrier Routing will provide <<customer_name>> with the capability of routing operator calls, 0+ and 0- and 0+ NPA (LNPA) 555-1212 directory assistance, 1+411 directory assistance and 611 repair center calls to pre-selected destinations.

  • Traditional Medicine Cooperation 1. The aims of Traditional Medicine cooperation will be: (a) to build on existing agreements or arrangements already in place for Traditional Medicine cooperation; and (b) to promote information exchanges on Traditional Medicine between the Parties. 2. In pursuit of the objectives in Article 149 (Objectives), the Parties will encourage and facilitate, as appropriate, the following activities, including, but not limited to: (a) encouraging dialogue on Traditional Medicine policies and promotion of respective Traditional Medicine; (b) raising awareness of active effects of Traditional Medicine; (c) encouraging exchange of experience in conservation and restoration of Traditional Medicine; (d) encouraging exchange of experience on management, research and development for Traditional Medicine; (e) encouraging cooperation in the Traditional Medicine education field, mainly through training programs and means of communication; (f) having a consultation mechanism between the Parties' Traditional Medicine authorities; (g) encouraging cooperation in Traditional Medicine therapeutic services and products manufacturing; and (h) encouraging cooperation in research in the fields of Traditional Medicine in order to contribute in efficacy and safety assessments of natural resources and products used in health care.

Time is Money Join Law Insider Premium to draft better contracts faster.