Common use of Traffic Control & Safety Clause in Contracts

Traffic Control & Safety. The permittee shall at all times give strict attention to the safety and rights of the traveling public, their employees, and contractors. Any permit may be revoked or suspended when in the opinion of the district administrator’s designee, the safety, use or maintenance of the highway so requires. In accordance with the Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14, all activities performed under the auspices of a VDOT Land Use Permit involving the installation, maintenance and removal of work zone traffic control devices must have at least one (1) person on-site who, at a minimum, is accredited by VDOT in Basic Work Zone Traffic Control. The accredited person must have their VDOT Work Zone Traffic Control accreditation card in their possession while on-site. A person accredited by VDOT in Intermediate Work Zone Traffic Control must be on-site to provide supervision for adjustment to the approved layout or implementation of any standard Typical Traffic Control (TTC) layouts outlined in the Virginia Work Area Protection Manual. All traffic control plans shall be prepared by a person accredited by VDOT in Advanced Work Zone Traffic Control. All activities that require the disruption (stoppage) of traffic shall utilize VDOT certified flaggers. Flag persons shall be provided in sufficient number and locations as necessary for control and protection of vehicular and pedestrian traffic in accordance with the Virginia Work Area Protection Manual. All flaggers must have their certification card in their possession when performing flagging operations within state maintained right-of-way. Any flag person found not in possession of his/her certification card shall be removed from the flagging site and the district administrator’s designee will suspend all permitted activities. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. The permittee shall be exempt from the requirements of Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14 if the authorized activity does not involve the installation, maintenance and removal of work zone traffic control devices and is not within the roadway (as defined in 24VAC30-151) of a state maintained highway. The permittee shall immediately correct any situation that may arise as a result of these activities that the district administrator’s designee deems hazardous to the traveling public. During authorized activities, the permittee shall furnish all necessary signs, flag persons and other devices to provide for the protection of traffic and workers in accordance with the Virginia Work Area Protection Manual or as directed by the district administrator’s designee. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). Traffic shall not be blocked or detoured without permission, documented in writing or electronic communication, being granted by the district administrator’s designee. All lane or shoulder closures on highways in the Northern Virginia construction district classified as arterial or collector routes must be authorized, documented in writing or by electronic communication by the VDOT Transportation Operations Center (NRO/TOC). The permittee shall notify the following appropriate VDOT Transportation Operations Center (TOC) 30 minutes prior to the installation of a lane closure or shoulder closure on non-limited access primary routes and within 30 minutes of removing the lane or shoulder closure: Eastern Region (000) 000-0000: All localities within the Hampton Roads construction district excluding Greenville County and Sussex County Northern Virginia (000) 000-0000: All localities within the NOVA construction district including Spotsylvania County and Xxxxxxxx County Central Region (000) 000-0000: All localities within the Richmond construction district including Greenville County and Sussex County. All localities within the Fredericksburg district excluding Spotsylvania County and Xxxxxxxx County SW Region (000) 000-0000: All localities within the Salem, Bristol, and Lynchburg construction districts NW Region (000) 000-0000: All localities within the Staunton and Culpeper construction districts

Appears in 2 contracts

Samples: www.virginiadot.org, www.virginiadot.org

AutoNDA by SimpleDocs

Traffic Control & Safety. The permittee shall at all times give strict attention to the safety and rights of the traveling public, their employees, and contractors. Any permit may be revoked or suspended when in the opinion of the district administrator’s designee, the safety, use or maintenance of the highway so requires. In accordance with the Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14, all activities performed under the auspices of a VDOT Land Use Permit involving the installation, maintenance and removal of work zone traffic control devices must have at least one (1) person on-site who, at a minimum, is accredited by VDOT in Basic Work Zone Traffic Control. The accredited person must have their VDOT Work Zone Traffic Control accreditation card in their possession while on-site. A person accredited by VDOT in Intermediate Work Zone Traffic Control must be on-site to provide supervision for adjustment to the approved layout or implementation of any standard Typical Traffic Control (TTC) layouts outlined in the Virginia Work Area Protection Manual. All traffic control plans shall be prepared by a person accredited by VDOT in Advanced Work Zone Traffic Control. All activities that require the disruption (stoppage) of traffic shall utilize VDOT certified flaggers. Flag persons shall be provided in sufficient number and locations as necessary for control and protection of vehicular and pedestrian traffic in accordance with the Virginia Work Area Protection Manual. All flaggers must have their certification card in their possession when performing flagging operations within state maintained right-of-way. Any flag person found not in possession of his/her certification card shall be removed from the flagging site and the district administrator’s designee will suspend all permitted activities. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. The permittee shall be exempt from the requirements of Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14 if the authorized activity does not involve the installation, maintenance and removal of work zone traffic control devices and is not within the roadway (as defined in 24VAC30-151) of a state maintained highway. The permittee shall immediately correct any situation that may arise as a result of these activities that the district administrator’s designee deems hazardous to the traveling public. During authorized activities, the permittee shall furnish all necessary signs, flag persons and other devices to provide for the protection of traffic and workers in accordance with the Virginia Work Area Protection Manual or as directed by the district administrator’s designee. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). Traffic shall not be blocked or detoured without permission, documented in writing or electronic communication, being granted by the district administrator’s designee. All lane or shoulder closures on highways in the Northern Virginia construction district classified as arterial or collector routes must be authorized, documented in writing or by electronic communication by the VDOT Transportation Operations Center (NRO/TOC). The permittee shall notify the following appropriate VDOT Transportation Operations Center (TOC) 30 minutes prior to the installation of a lane closure or shoulder closure on non-limited access primary routes and within 30 minutes of removing the lane or shoulder closure: Eastern Region (000) 000-0000: All localities within the Hampton Roads construction district excluding Greenville County and Sussex County Northern Virginia (000) 000-0000: All localities within the NOVA construction district including Spotsylvania County and Xxxxxxxx County Central Region (000) 000-0000: All localities within the Richmond construction district including Greenville County and Sussex County. All localities within the Fredericksburg district excluding Spotsylvania County and Xxxxxxxx County SW Region (000) 000-0000: All localities within the Salem, Bristol, and Lynchburg construction districts NW Region (000) 000-0000: All localities within the Staunton and Culpeper construction districtsdistricts Inspection and Restoration Inspection and testing of all backfill and pavement sections shall be performed in accordance with all applicable sections of VDOT’s Road and Bridge Specifications (current edition). The absence of a VDOT inspector does not in any way relieve the permittee of their responsibility to perform the work in accordance with the approved plans, provisions of the attached permit, VDOT’s Road and Bridge Standards (current edition) and VDOT’s Road and Bridge Specifications (current edition). The permittee shall be responsible for any settlement of all backfill or pavement restoration necessitated by authorized excavation activities for a period of two (2) years after the completion date of permit, and for the continuing maintenance of the facilities placed within the highway right-of-way. A one (1) year restoration warranty period may be considered, provided the permittee adheres to the following criteria: The permittee retains the services of a professional engineer (or certified technician under the direction of the professional engineer) to observe the placement of all backfill and pavement restoration. The professional engineer (or certified technician under the direction of the professional engineer) performs any required inspection and testing in accordance with all applicable sections of VDOT's Road and Bridge Specifications. The professional engineer submits all testing reports for review and approval, and provides written certification that all restoration procedures have been completed in accordance with all applicable sections of VDOT's Road and Bridge Specifications prior to completion of the work authorized by the permit. Whenever existing pavement is permitted to be cut, not over one-half of the roadway width shall be disturbed at one time and the first open cut trench section shall be satisfactorily restored to allow for the passage of traffic prior to the second half of the roadway surface can be disturbed. All crossing of existing pavement shall be bored, pushed or jacked an appropriate distance from the edge-of-pavement so as not to impede the normal flow of traffic or damage the existing pavement section. Existing pavement shall not be cut unless approved by the district administrator’s designee and then only if justifiable circumstances prevail or proof is shown that a thorough attempt has been made to push, bore or jack. Authorized daily trench excavation within pavement sections shall not exceed 500 feet in length. Pavement restoration shall be in accordance with the VDOT LUP-OC Pavement Open Cut Special Provisions. This document can also be found at: xxxx://xxx.xxxxxxxxxxx.xxx/business/bu-landUsePermits.asp Where the pavement is disturbed or deemed weakened in its entirety or such portions as deemed desirable by the Department, the pavement shall be restored or replaced in a manner that is satisfactory to the district administrator’s designee.

Appears in 1 contract

Samples: www.vdot.virginia.gov

Traffic Control & Safety. The permittee shall at all times give strict attention to the safety and rights of the traveling public, their employees, and contractors. Any permit may be revoked or suspended when in the opinion of the district administrator’s designee, the safety, use or maintenance of the highway so requires. The permittee shall install traffic control devices in accordance with Typical Traffic Control (TTC) layout TTC-63.0 as outlined in the Virginia Work Area Protection Manual. In accordance with the Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14, all activities performed under the auspices of a VDOT Land Use Permit involving the installation, maintenance and removal of work zone traffic control devices must have at least one (1) person on-site who, at a minimum, is accredited by VDOT in Basic Work Zone Traffic Control. The accredited person must have their VDOT Work Zone Traffic Control accreditation card in their possession while on-site. A person accredited by VDOT in Intermediate Work Zone Traffic Control must be on-site to provide supervision for adjustment to the approved layout or implementation of any standard Typical Traffic Control (TTC) layouts outlined in the Virginia Work Area Protection Manual. All traffic control plans shall be prepared by a person accredited by VDOT in Advanced Work Zone Traffic Control. All activities that require the disruption (stoppage) of traffic shall utilize VDOT certified flaggers. Flag persons shall be provided in sufficient number and locations as necessary for control and protection of vehicular and pedestrian traffic in accordance with the Virginia Work Area Protection Manual. All flaggers must have their certification card in their possession when performing flagging operations within state maintained right-of-way. Any flag person found not in possession of his/her certification card shall be removed from the flagging site and the district administrator’s designee will suspend all permitted activities. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. The permittee shall be exempt from the requirements of Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14 if the authorized activity does not involve the installation, maintenance and removal of work zone traffic control devices and is not within the roadway (as defined in 24VAC30-151) of a state maintained highway. The permittee shall immediately correct any situation that may arise as a result of these activities that the district administrator’s designee deems hazardous to the traveling public. During authorized activities, the permittee shall furnish all necessary signs, flag persons and other devices to provide for the protection of traffic and workers in accordance with the Virginia Work Area Protection Manual or as directed by the district administrator’s designee. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). Traffic shall not be blocked or detoured without permission, documented in writing or electronic communication, being granted by the district administrator’s designee. All lane or shoulder closures on highways in the Northern Virginia construction district classified as arterial or collector routes must be authorized, documented in writing or by electronic communication by the VDOT Transportation Operations Center (NRO/TOC). The permittee shall notify the following appropriate VDOT Transportation Operations Center (TOC) 30 minutes prior to the installation of a lane closure or shoulder closure on non-limited access primary routes and within 30 minutes of removing the lane or shoulder closure: Eastern Region (000) 000-0000: All localities within the Hampton Roads construction district excluding Greenville County and Sussex County Northern Virginia (000) 000-0000: All localities within the NOVA construction district including Spotsylvania County and Xxxxxxxx County Central Region (000) 000-0000: All localities within the Richmond construction district including Greenville County and Sussex County. All localities within the Fredericksburg district excluding Spotsylvania County and Xxxxxxxx County SW Region (000) 000-0000: All localities within the Salem, Bristol, and Lynchburg construction districts NW Region (000) 000-0000: All localities within the Staunton and Culpeper construction districts

Appears in 1 contract

Samples: Land Use

Traffic Control & Safety. The permittee shall at all times give strict attention to the safety and rights of the traveling public, their employees, and contractors. Any permit may be revoked or suspended when in the opinion of the district administrator’s designee, the safety, use or maintenance of the highway so requires. The permittee shall install traffic control devices in accordance with Typical Traffic Control (TTC) layout TTC-49.0 as outlined in the Virginia Work Area Protection Manual. In accordance with the Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14, all activities performed under the auspices of a VDOT Land Use Permit land use permit involving the installation, maintenance and removal of work zone traffic control devices must have at least one (1) person on-site who, at a minimum, is accredited by VDOT in Basic Work Zone Traffic Control. The accredited person must have their VDOT Work Zone Traffic Control accreditation card in their possession while on-site. The permittee must provide an executed copy of the LUP-WZTCC Work Zone Traffic Control Certification form when making application for a district-wide VDOT land use permit for surveying operations. A person accredited by VDOT in Intermediate Work Zone Traffic Control must be on-site to provide supervision for adjustment to the approved layout or implementation of any standard Typical Traffic Control (TTC) layouts outlined in the Virginia Work Area Protection Manual. All traffic control plans shall be prepared by a person accredited by VDOT in Advanced Work Zone Traffic Control. All activities that require the disruption (stoppage) of traffic shall utilize VDOT certified flaggers. Flag persons shall be provided in sufficient number and locations as necessary for control and protection of vehicular and pedestrian traffic in accordance with the Virginia Work Area Protection Manual. All flaggers must have their certification card in their possession when performing flagging operations within state maintained right-of-way. Any flag person found not in possession of his/her certification card shall be removed from the flagging site and the district administrator’s designee will suspend all permitted activities. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. The permittee shall be exempt from the requirements of Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14 if the authorized activity does not involve the installation, maintenance and removal of work zone traffic control devices and is not within the roadway (as defined in 24VAC30-151) of a state maintained highway. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). The permittee shall immediately correct any situation that may arise as a result of these activities that the district administrator’s designee deems hazardous to the traveling public. During authorized activities, the permittee shall furnish all necessary signs, flag persons and other devices to provide for the protection of traffic and workers in accordance with the Virginia Work Area Protection Manual or as directed by the district administrator’s designee. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). Traffic shall not be blocked or detoured without permission, documented in writing or electronic communication, being granted by the district administrator’s designee. All lane or shoulder closures on highways in the Northern Virginia construction district classified as arterial or collector routes must be authorized, documented in writing or by electronic communication by the VDOT Transportation Operations Center (NRO/TOC). The permittee shall notify the following appropriate VDOT Transportation Operations Center (TOC) 30 minutes prior to the installation of a lane closure or shoulder closure on non-limited access primary routes and within 30 minutes of removing the lane or shoulder closure: Eastern Region (000) 000-0000: All localities within the Hampton Roads construction district excluding Greenville County and Sussex County Northern Virginia (000) 000-0000: All localities within the NOVA construction district including Spotsylvania County and Xxxxxxxx County Central Region (000) 000-0000: All localities within the Richmond construction district including Greenville County and Sussex County. All localities within the Fredericksburg district excluding Spotsylvania County and Xxxxxxxx County SW Region (000) 000-0000: All localities within the Salem, Bristol, and Lynchburg construction districts NW Region (000) 000-0000: All localities within the Staunton and Culpeper construction districts

Appears in 1 contract

Samples: Land Use Permit

Traffic Control & Safety. The permittee shall at all times give strict attention to the safety and rights of the traveling public, their employees, and contractors. Any permit may be revoked or suspended when in the opinion of the district administrator’s designee, the safety, use or maintenance of the highway so requires. In accordance with the Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14, all activities performed under the auspices of a VDOT Land Use Permit involving the installation, maintenance and removal of work zone traffic control devices must have at least one (1) person on-site who, at a minimum, is accredited by VDOT in Basic Work Zone Traffic Control. The accredited person must have their VDOT Work Zone Traffic Control accreditation card in their possession while on-site. A person accredited by VDOT in Intermediate Work Zone Traffic Control must be on-site to provide supervision for adjustment to the approved layout or implementation of any standard Typical Traffic Control (TTC) layouts outlined in the Virginia Work Area Protection Manual. All traffic control plans shall be prepared by a person accredited by VDOT in Advanced Work Zone Traffic Control. All activities that require the disruption (stoppage) of traffic shall utilize VDOT certified flaggers. Flag persons shall be provided in sufficient number and locations as necessary for control and protection of vehicular and pedestrian traffic in accordance with the Virginia Work Area Protection Manual. All flaggers must have their certification card in their possession when performing flagging operations within state maintained right-of-way. Any flag person found not in possession of his/her certification card shall be removed from the flagging site and the district administrator’s designee will suspend all permitted activities. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. The permittee shall be exempt from the requirements of Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14 if the authorized activity does not involve the installation, maintenance and removal of work zone traffic control devices and is not within the roadway (as defined in 24VAC30-151) of a state maintained highway. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). The permittee shall immediately correct any situation that may arise as a result of these activities that the district administrator’s designee deems hazardous to the traveling public. During authorized activities, the permittee shall furnish all necessary signs, flag persons and other devices to provide for the protection of traffic and workers in accordance with the Virginia Work Area Protection Manual or as directed by the district administrator’s designee. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). Traffic shall not be blocked or detoured without permission, documented in writing or electronic communication, being granted by the district administrator’s designee. All lane or shoulder closures on highways in the Northern Virginia construction district classified as arterial or collector routes must be authorized, documented in writing or by electronic communication by the VDOT Transportation Operations Center (NRO/TOC). The permittee shall notify the following appropriate VDOT Transportation Operations Center (TOC) 30 minutes prior to the installation of a lane closure or shoulder closure on non-limited access primary routes and within 30 minutes of removing the lane or shoulder closure: Eastern Region (000) 000-0000: All localities within the Hampton Roads construction district excluding Greenville County and Sussex County Northern Virginia (000) 000-0000: All localities within the NOVA construction district including Spotsylvania County and Xxxxxxxx County Central Region (000) 000-0000: All localities within the Richmond construction district including Greenville County and Sussex County. All localities within the Fredericksburg district excluding Spotsylvania County and Xxxxxxxx County SW Region (000) 000-0000: All localities within the Salem, Bristol, and Lynchburg construction districts NW Region (000) 000-0000: All localities within the Staunton and Culpeper construction districts

Appears in 1 contract

Samples: www.virginiadot.org

AutoNDA by SimpleDocs

Traffic Control & Safety. The permittee shall at all times give strict attention to the safety and rights of the traveling public, their employees, and contractors. Any permit may be revoked or suspended when in the opinion of the district administrator’s designee, the safety, use or maintenance of the highway so requires. In accordance with the Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14, all activities performed under the auspices of a VDOT Land Use Permit involving the installation, maintenance and removal of work zone traffic control devices must have at least one (1) person on-site who, at a minimum, is accredited by VDOT in Basic Work Zone Traffic Control. The accredited person must have their VDOT Work Zone Traffic Control accreditation card in their possession while on-site. A person accredited by VDOT in Intermediate Work Zone Traffic Control must be on-site to provide supervision for adjustment to the approved layout or implementation of any standard Typical Traffic Control (TTC) layouts outlined in the Virginia Work Area Protection Manual. All traffic control plans shall be prepared by a person accredited by VDOT in Advanced Work Zone Traffic Control. All activities that require the disruption (stoppage) of traffic shall utilize VDOT certified flaggers. Flag persons shall be provided in sufficient number and locations as necessary for control and protection of vehicular and pedestrian traffic in accordance with the Virginia Work Area Protection Manual. All flaggers must have their certification card in their possession when performing flagging operations within state maintained right-of-way. Any flag person found not in possession of his/her certification card shall be removed from the flagging site and the district administrator’s designee will suspend all permitted activities. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. The permittee shall be exempt from the requirements of Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14 if the authorized activity does not involve the installation, maintenance and removal of work zone traffic control devices and is not within the roadway (as defined in 24VAC30-151) of a state maintained highway. The permittee shall immediately correct any situation that may arise as a result of these activities that the district administrator’s designee deems hazardous to the traveling public. During authorized activities, the permittee shall furnish all necessary signs, flag persons and other devices to provide for the protection of traffic and workers in accordance with the Virginia Work Area Protection Manual or as directed by the district administrator’s designee. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). Traffic shall not be blocked or detoured without permission, documented in writing or electronic communication, being granted by the district administrator’s designee. All temporary lane or shoulder closures on highways in the Northern Virginia construction district classified as arterial or collector routes must be authorized, documented in writing or by electronic communication by the VDOT Transportation Operations Center (NRO/TOC). The permittee shall notify the following appropriate VDOT Transportation Operations Center (TOC) 30 minutes prior to the installation of a lane closure or shoulder closure on non-limited access primary routes and within 30 minutes of removing the lane or shoulder closure: Eastern Region (000) 000-0000: All localities within the Hampton Roads construction district excluding Greenville County and Sussex County Northern Virginia (000) 000-0000: All localities within the NOVA construction district including Spotsylvania County and Xxxxxxxx County Central Region (000) 000-0000: All localities within the Richmond construction district including Greenville County and Sussex County. All localities within the Fredericksburg district excluding Spotsylvania County and Xxxxxxxx County SW Region (000) 000-0000: All localities within the Salem, Bristol, and Lynchburg construction districts NW Region (000) 000-0000: All localities within the Staunton and Culpeper construction districts.

Appears in 1 contract

Samples: www.virginiadot.org

Traffic Control & Safety. The permittee shall at all times give strict attention to the safety and rights of the traveling public, their employees, and contractors. Any permit may be revoked or suspended when in the opinion of the district administrator’s designee, the safety, use or maintenance of the highway so requires. In accordance with the Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14, all activities performed under the auspices of a VDOT Land Use Permit involving the installation, maintenance and removal of work zone traffic control devices must have at least one (1) person on-site who, at a minimum, is accredited by VDOT in Basic Work Zone Traffic Control. The accredited person must have their VDOT Work Zone Traffic Control accreditation card in their possession while on-site. A person accredited by VDOT in Intermediate Work Zone Traffic Control must be on-site to provide supervision for adjustment to the approved layout or implementation of any standard Typical Traffic Control (TTC) layouts outlined in the Virginia Work Area Protection Manual. All traffic control plans shall be prepared by a person accredited by VDOT in Advanced Work Zone Traffic Control. All activities that require the disruption (stoppage) of traffic shall utilize VDOT certified flaggers. Flag persons shall be provided in sufficient number and locations as necessary for control and protection of vehicular and pedestrian traffic in accordance with the Virginia Work Area Protection Manual. All flaggers must have their certification card in their possession when performing flagging operations within state maintained right-of-way. Any flag person found not in possession of his/her certification card shall be removed from the flagging site and the district administrator’s designee will suspend all permitted activities. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. The permittee shall be exempt from the requirements of Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14 if the authorized activity does not involve the installation, maintenance and removal of work zone traffic control devices and is not within the roadway (as defined in 24VAC30-151) of a state maintained highway. Traffic shall not be blocked or detoured without permission, documented in writing or electronic communication, being granted by the district area land use engineer. The permittee shall immediately correct any situation that may arise as a result of these activities that the district administrator’s designee area land use engineer deems hazardous to the traveling public. During authorized activities, the permittee shall furnish all necessary signs, flag persons and other devices to provide for the protection of traffic and workers in accordance with the Virginia Work Area Protection Manual or as directed by the district administrator’s designee. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). Traffic shall not be blocked or detoured without permission, documented in writing or electronic communication, being granted by the district administrator’s designee. All lane or shoulder closures on highways in the Northern Virginia construction district classified as arterial or collector routes must be authorized, documented in writing or by electronic communication by the VDOT Transportation Operations Center (NRO/TOC). The permittee shall notify the following appropriate VDOT Transportation Operations Center (TOC) 30 minutes prior to the installation of a lane closure or shoulder closure on non-limited access primary routes and within 30 minutes of removing the lane or shoulder closure: Eastern Region (000) 000-0000: All localities within the Hampton Roads construction district excluding Greenville County and Sussex County Northern Virginia (000) 000-0000: All localities within the NOVA construction district including Spotsylvania County and Xxxxxxxx County Central Region (000) 000-0000: All localities within the Richmond construction district including Greenville County and Sussex County. All localities within the Fredericksburg district excluding Spotsylvania County and Xxxxxxxx County SW Region (000) 000-0000: All localities within the Salem, Bristol, and Lynchburg construction districts NW Region (000) 000-0000: All localities within the Staunton and Culpeper construction districts

Appears in 1 contract

Samples: www.vdot.virginia.gov

Time is Money Join Law Insider Premium to draft better contracts faster.