Common use of Traffic Warrant Studies Clause in Contracts

Traffic Warrant Studies. The Engineer shall prepare a traffic signal warrant study to support their recommendation for the continuous activation of an existing traffic signal or a proposed traffic signal based on projected volumes. Each warrant study must include addressing pedestrian signals along with obtaining both traffic and pedestrian counts. The Engineer shall implement each proposed traffic signal improvement within existing State ROW unless otherwise approved by the State. The Engineer shall refer to latest version of the TMUTCD, Traffic Signal Manual, and The State’s roadway (ramp) and traffic standards for work performed for either temporary or permanent traffic signals. The Engineer shall develop and include a timing plan for each signal improvement.

Appears in 27 contracts

Samples: Professional Service Agreement, Attachment E – Fee, Attachment E – Fee

AutoNDA by SimpleDocs

Traffic Warrant Studies. The Engineer shall prepare a traffic signal warrant study to support their recommendation for the continuous activation of an existing traffic signal or a proposed traffic signal based on projected volumes. Each warrant study must shall include addressing pedestrian signals along with obtaining both traffic and pedestrian counts. The Engineer shall implement each proposed traffic signal improvement within existing State ROW right-of- way unless otherwise approved by the State. The Engineer shall refer to latest version of the TMUTCD, Traffic Signal Manual, and The State’s roadway (ramp) and traffic standards for work performed for either temporary or permanent traffic signals. The Engineer shall develop and include a timing plan for each signal improvement.

Appears in 2 contracts

Samples: sb20pca.txdot.gov, sb20pca.txdot.gov

AutoNDA by SimpleDocs

Traffic Warrant Studies. The Engineer shall prepare a traffic signal warrant study to support their recommendation for the continuous activation of an existing traffic signal or a proposed traffic signal based on projected volumes. Each warrant study must shall include addressing pedestrian signals along with obtaining both traffic and pedestrian counts. The Engineer shall implement each proposed traffic signal improvement within existing State ROW unless otherwise approved by the State. The Engineer shall refer to latest version of the TMUTCD, Traffic Signal Manual, and The StateTxDOT’s roadway (ramp) and traffic standards for work performed for either temporary or permanent traffic signals. The Engineer shall develop and include a timing plan for each signal improvement.. DocuSign Envelope ID: EB684705-7EFE-459C-ACCD-BB3BEAE6EBD7

Appears in 1 contract

Samples: sb20pca.txdot.gov

Time is Money Join Law Insider Premium to draft better contracts faster.