Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.
Hazing Hazing is a process, based on tradition that is used by groups to maintain a hierarchy (i.e., a pecking order) within the group. Regardless of consent, the rituals require individuals to engage in activities that are physically and/or psychologically stressful. These activities can be humiliating, demeaning, intimidating, and exhausting, all of which results in physical or emotional discomfort. Hazing is about group dynamics and proving one’s worthiness to become a member of a specific group. The newcomer, or victim, is hazed. Once accepted by the group, the victim may become a bystander, watch others get hazed, achieve senior status, and ultimately become a perpetrator of hazing. In New Jersey, hazing is a separate criminal offense under N.J.S.A. 2C:40-3. School officials should be aware that hazing which involves the participation of a coach or a teacher may also constitute child abuse. Hazing may also involve other predicate crimes, such as sexual assault. Hazing may also constitute HIB. As noted in Article 4.4.2, although HIB is not a separately defined criminal offense, the conduct that constitutes bullying may constitute one or more criminal or disorderly person offenses, including assault, harassment, threats, robbery and sexual offenses.
Pruning Nondestructive thinning of lateral branches to enhance views or trimming, shaping, thinning or pruning of a tree necessary to its health and growth is allowed, consistent with the following standards:
Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.
Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.
Playground ~ The playground is primarily for the use of children under the age of twelve (12). Any child caught throwing rocks, vandalizing, or hitting or teasing other children will be asked to leave the playground. An adult or appropriate baby-sitter must accompany all children under the age of six (6) years old. Garbage ~ The storage, collection and disposal of refuse and garbage in the recreational camping areas shall be conducted as to create no health hazards, rodent harborage, insect breeding areas, accident or fire hazards, or air pollution. Bag all food garbage in plastic and tie shut before placing in the dumpster, to prevent odor and rodents which are drawn to the garbage area, such as skunks, raccoons etc. Dumpster is for normal daily household garbage, no large boxes, building supplies, carpets etc. Camper is to dispose of this type of garbage elsewhere. Garbage may be placed in dumpsters only. If a dumpster is full, do not place garbage on or around the dumpster, find an empty dumpster to place your garbage into. Bags of garbage may not be set outside your camper for any reason. Disposal or deposit of hazardous or toxic waste is prohibited. No gas, oil, batteries, or car fluids may be deposited into the dumpsters or around the dumpsters. Hazardous materials will not be disposed of by the garbage service. Disposal or deposit of furniture, barbeque grills, washer, dryers, and other large household items are NOT permitted on, in or around the dumpsters. Holding Tanks ~ There is no size restriction on holding tanks, however, they must be opaque XX xxxx/black water approved tanks. The on-site dump station may be used to empty tanks that hold 50 gallons or less. For tanks over 50 gallons Camper must contract with a pumping service to pump and remove tank contents from campground. No dumping of xxxx water onto the ground. Docks ~ Campground does NOT have a lifeguard on duty. The docks are privately owned. In order to be on someone's dock you must receive permission from the dock owner. An adult must accompany all children on the docks after dark. Life jackets are required for young children fishing off docks. Running, diving, and/or horseplay are not allowed on the docks. All debris and toys must be removed from the docks, beach and marina area. Inappropriate behavior, intoxication or shouting on docks is not allowed. Glass is not allowed on the beach area. Jet skies, wave runners, etc. are not permitted in the marina area. Tires cannot be left in the marina area under boats or tied onto docks. Fish House ~ Clean up fish cleaning facility when done with your fish cleaning and bag all fish remains. Fish cleaning house must be kept clean and all fish waste must be put into plastic bags and deposited into dumpster and cover on dumpster closed. No dumping of fish wastes into marina or dog waste stations! Swimming Pool ~ Campers are required to abide by all rules posted in and around the pool area.
Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:
Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.
Health Screening The Contractor shall conduct a Health Needs Screen (HNS) for new members that enroll in the Contractor’s plan. The HNS will be used to identify the member’s physical and/or behavioral health care needs, special health care needs, as well as the need for disease management, care management and/or case management services set forth in Section 3.8. The HNS may be conducted in person, by phone, online or by mail. The Contractor shall use the standard health screening tool developed by OMPP, i.e., the Health Needs Screening Tool, but is permitted to supplement the OMPP Health Needs Screening Tool with additional questions developed by the Contractor. Any additions to the OMPP Health Needs Screening Tool shall be approved by OMPP. The HNS shall be conducted within ninety (90) calendar days of the Contractor’s receipt of a new member’s fully eligible file from the State. The Contractor is encouraged to conduct the HNS at the same time it assists the member in making a PMP selection. The Contractor shall also be required to conduct a subsequent health screening or comprehensive health assessment if a member’s health care status is determined to have changed since the original screening, such as evidence of overutilization of health care services as identified through such methods as claims review. Non-clinical staff may conduct the HNS. The results of the HNS shall be transferred to OMPP in the form and manner set forth by OMPP. As part of this contract, the Contractor shall not be required to conduct HNS for members enrolled in the Contractor’s plan prior to January 1, 2017 unless a change in the member’s health care status indicates the need to conduct a health screening. For purposes of the HNS requirement, new members are defined as members that have not been enrolled in the Contractor’s plan in the previous twelve (12) months. Data from the HNS or NOP form, current medications and self-reported medical conditions will be used to develop stratification levels for members in Hoosier Healthwise. The Contractor may use its own proprietary stratification methodology to determine which members should be referred to specific care coordination services ranging from disease management to complex case management. OMPP shall apply its own stratification methodology which may, in future years, be used to link stratification level to the per member per month capitation rate. The initial HNS shall be followed by a detailed Comprehensive Health Assessment Tool (CHAT) by a health care professional when a member is identified through the HNS as having a special health care need, as set forth in Section 4.2.4, or when there is a need to follow up on problem areas found in the initial HNS. The detailed CHAT may include, but is not limited to, discussion with the member, a review of the member’s claims history and/or contact with the member’s family or health care providers. These interactions shall be documented and shall be available for review by OMPP. The Contractor shall keep up-to-date records of all members found to have special health care needs based on the initial screening, including documentation of the follow-up detailed CHAT and contacts with the member, their family or health care providers.
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.