Turf Fertilization, Weed and Pest Control Sample Clauses

Turf Fertilization, Weed and Pest Control. Well-balanced fertilizer shall be used to maintain a healthy green color and shall be applied based upon Contractor’s knowledge and needs of the area. All weed and pest control products shall be used in accordance with the manufacturer’s recommendations and EPA guidelines. A schedule of all applications will be given to the Recreation Department on an annual basis. Any deviation from the schedule shall be coordinated with the County. Pests shall be defined as all turf damaging pests including, but not limited to, Mole Crickets, Fire Ants, Grubs, and Army Worms.
AutoNDA by SimpleDocs

Related to Turf Fertilization, Weed and Pest Control

  • Utilization Management Contractor shall maintain a utilization management program that complies with applicable laws, rules and regulations, including Health and Safety Code § 1367.01 and other requirements established by the applicable State Regulators responsible for oversight of Contractor.

  • EDUCATION/PREVENTION To promote health and safety, information about this policy, and information designed to minimise the harmful use of alcohol and other drugs will be displayed on-site and distributed as appropriate. The V.B.I. Alcohol and Drug Worker (Ph. (00) 0000 0000 or mobile 0000 000 000) or the V.B.I. Chaplain (pager Melbourne 9506 0136/Country 000 00 0000) may be contacted directly for information and/or assistance. Direct Line provides information, counselling and referral on alcohol and drug issues 24 hours per day – Phone (00) 0000 0000 (metro) or (008) 136 385 (country). APPENDIX D (CONT’D) GUIDELINES FOR OCCUPATIONAL HEALTH AND SAFETY COMMITTEES HOW THE POLICY IS INTRODUCED AND PURSUED

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Secondary / Post-Secondary Program Alignment Welding HIGH SCHOOL COURSE SEQUENCE 9th Grade 10th Grade 11th Grade 12th Grade English 9 Algebra I World History/Geography Biology World Language Phys Ed/Health English 10 Geometry U.S. History/Geography Physics or Chemistry World Language Visual/Performing/Applied Arts English 11 Algebra II Civics/Economics Welding English 12 Math Credit Science Credit Welding WASHTENAW COMMUNITY COLLEGE Welding Associate in Applied Science Semester 1 Math Elective(s)* 3 WAF 105 Introduction to Welding Processes 2 WAF 111 Oxy-fuel Welding 4 WAF 112 Shielded Metal Arc Welding 4 Semester Total 13 Semester 2 Speech Elective(s) 3 WAF 106 Blueprint Reading for Welders 3 WAF 123 Advanced Oxy-fuel Welding 4 WAF 124 Advanced Shielded Metal Arc Welding 4 Semester Total 14 Semester 3 Arts/Human. Elective(s) 3 Computer Lit. Elective(s) 3 WAF 215 Advanced Gas Tungsten Arc Welding 4 WAF 288 Gas Metal Arc Welding 4 Semester Total 14 Semester 4 WAF 200 Layout Theory Welding 3 WAF 210 Welding Metallurgy 3 Soc. Sci. Elective(s) 3 WAF 226 Specialized Welding Procedures 4 Semester Total 13 Semester 5 Nat. Sci. Elective(s) 4 WAF 227 Basic Fabrication 3 WAF 229 Shape Cutting Operations 3 Writing Elective(s) 3 Semester Total 13 Program Totals 67

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Erosion Prevention and Control Purchaser’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. Purchaser shall adjust the kinds and intensity of erosion control work done to ground and weather condi- tions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding ex- pected seasonal periods of precipitation or runoff. If Purchaser fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, Forest Service may temporarily assume responsibility for the work and any unencumbered deposits hereunder may be used by Forest Service to do the work. If needed for such work, Purchaser shall make additional deposits on request by Forest Service. Any money deposited or used for this purpose shall be treated as cooperative deposits under B4.218.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Pest Control A. Whenever a department utilizes a pest control chemical in State owned or managed buildings/grounds, the department will provide at least forty-eight (48) hours notice prior to application of the chemical, unless an infestation occurs which requires immediate action. Notices will be posted in the lobby of the building and will be disseminated to building tenant contacts.

  • Earned Value Management System ‌ An earned value management system (EVMS) means a project management tool that effectively integrates the project scope of work with cost, schedule and performance elements for optimum project planning and control. The qualities and operating characteristics of EVMS are described in American National Standards Institute /Electronics Industries Alliance (ANSI/EIA) Standard-748. An EVMS is not mandatory; however, Contractors are encouraged to have an EVMS ANSI/EIA Standard-748 during the entire term of OASIS. The Contractor shall notify the OASIS CO, in writing, if there are any changes in the status of their EVMS and provide the reasons for the change and copies of audits by the Defense Contract Management Agency (DCMA) or other cognizant Government administration office, as applicable. If only part of a Contractor’s organization is EVMS ANSI/EIA Standard-748 certified, the Contractor shall make the distinction between which business units or sites and geographic locations have been certified.

  • Infection Control Consistent with the Centers for Disease Control and Prevention Guideline for Infection Control in Health Care Personnel, and University Policy 3364-109-EH-603, the parties agree that all bargaining unit employees who come in contact with patients in the hospital or ambulatory care clinics will need to be vaccinated against influenza when flu season begins each fall. The influenza vaccine will be offered to all health care workers, including pregnant women, before the influenza season, unless otherwise medically contraindicated or it compromises sincerely held religious beliefs.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

Time is Money Join Law Insider Premium to draft better contracts faster.