Uncovering of and Correction of Work Sample Clauses

Uncovering of and Correction of Work 
AutoNDA by SimpleDocs

Related to Uncovering of and Correction of Work

  • Uncovering and Correction of Work 12 Uncovering of Work 12.1 Unforeseen Conditions, Concealed or Unknown 3.7.4, 8.3.1, 10.3 Unit Prices 7.3.3.2, 9.1.2

  • UNCOVERING OF WORK 13.1.1 If any portion of the Work should be covered contrary to the request of the Architect or to requirements specifically expressed in the Contract Documents, it must, if required in writing by the Architect, be uncovered for his or her observation and shall be replaced at the Contractor's expense.

  • CORRECTION OF WORK 13.2.1 The Contractor shall be responsible for correcting all Work which the Architect has found to be defective or which fails to conform to the Contract Documents whether observed be- fore or after Substantial Completion and whether or not fabricated, installed or completed. The Contractor shall bear all costs of correcting such rejected Work, including compensation for the Architect's and the State’s additional services made necessary thereby. The Architect, upon a finding of defect or failure to conform, shall immediately notify the State and Contractor, in writing, of the defect. The Contractor shall begin correcting the defective or non-conforming Work within ten (10) days unless the State agrees to a Change Order which reflects the reduction in Contract Sum due to the value of diminishment of the defective or nonconforming Work.

  • Inspection of Work It is FIRST PARTY's obligation to make the work product available for CITY's inspections and periodic reviews upon request by CITY.

  • Rejection of Work Using the Notice of Non-Conforming Work procedures outlined in the General Conditions, the Design Professional shall reject work that does not comply with the requirements of the Contract Documents or that does not comply with the applicable laws and codes. The Design Professional shall have authority to order testing of the Work, as is provided in the Contract Documents or as otherwise required in its judgment, whether such work is fabricated, installed, or completed.

  • Location of Work The Executive shall be based in the United States in West Orange, New Jersey. However, the Executive agrees to undertake whatever domestic and worldwide travel is required by the Company. The Executive shall not be required or permitted to relocate without the mutual, written consent of the Executive and the Company.

  • Statement of Work The Contractor shall provide the services and staff, and otherwise do all things necessary for or incidental to the performance of work, as set forth below:

  • Coordination of Work Licensee shall be responsible for coordination of its Equipment installation work to avoid any interference with existing utilities, substructures, facilities and/or SFMTA transit operations. Licensee shall be the City's point of contact for all Equipment installation and except in case of emergency, all communications concerning Equipment installation shall be through Licensee's field representatives.

  • LAYOUT OF WORK The Contractor shall lay out its Work from base lines and benchmarks indicated on the Drawings, and shall be responsible for verification of all measurements in connection with the layout. The Contractor shall furnish all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the Work. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by Princeton University until authorized to remove them. If such marks are destroyed by the Contractor or through its negligence before their removal is authorized, Princeton University may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor. CLAUSE C15 NOISE

  • Scheduling of Work Subcontractor shall provide Contractor with scheduling information and a proposed schedule for performance of the Subcontract Work consistent with the Progress Schedule and in a form acceptable to Contractor. Subcontractor shall comply with the Progress Schedule including, but not specifically limited to, commencement, duration, and sequencing of activities. Contractor shall reasonably cooperate with the Subcontractor in scheduling the Subcontract Work and shall attempt, as reasonably possible, to avoid conflicts or interference with the Subcontract Work.