Utility Storage of Data Sample Clauses

Utility Storage of Data. Watt-hour data accumulated and indicated shall be retained by PG&E consistent with the same data storage requirements applicable to customer billing data.
AutoNDA by SimpleDocs

Related to Utility Storage of Data

  • Storage of Data The Company agrees to store and process the School District Data in a manner that is no less protective than those methods used to secure the Company’s own data. The Company agrees that School District Data will be stored on equipment or systems located within the United States.

  • Storage of Materials Borrower shall cause all materials supplied for or intended to be utilized in the construction of the Improvements but not affixed to or incorporated into the Property to be stored on the Property or at such other location as may be approved by Lender in writing, with adequate safeguards to prevent loss, theft, damage or commingling with other materials not intended to be utilized in the construction of the Improvements.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

Time is Money Join Law Insider Premium to draft better contracts faster.