Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.
Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.
Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.
Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.
Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.
Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.
Wastewater i.e. wastewater and storm water collection, treatment and management systems.
Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.
TREE TRIMMING The Licensee shall have authority to trim trees upon and overhanging public streets, alleys, sidewalks and ways and places of the Town so as to prevent the branches of such trees from coming in contact with the wires, cables and equipment of the Licensee, in accordance with applicable state law and any Town bylaws/ordinances and regulations.