Network Management 60.1 CLEC and CenturyLink will exchange appropriate information (e.g., network information, maintenance contact numbers, escalation procedures, and information required to comply with requirements of law enforcement and national security agencies) for network management purposes. In addition, the Parties will apply sound network management principles to alleviate or to prevent traffic congestion and to minimize fraud associated with third number billed calls, calling card calls, and other services related to this Agreement. 60.2 The Parties will employ characteristics and methods of operation that will not interfere with or impair the Parties’ networks, or the network of any third parties or Affiliated companies, connected with or involved directly in the network or facilities of CenturyLink. 60.3 CLEC shall not interfere with or impair service over any circuits, facilities or equipment of CenturyLink, its Affiliated companies, or its connecting and concurring carriers. 60.4 If CLEC causes any impairment or interference, CenturyLink shall promptly notify CLEC of the nature and location of the problem and that, unless promptly rectified, a temporary discontinuance of the use of any circuit, facility or equipment may be required. The Parties agree to work together to attempt to promptly resolve the impairment or interference. If CLEC is unable to promptly remedy, then CenturyLink may, at its option, temporarily discontinue the use of the affected circuit, facility or equipment until the impairment is remedied. 60.5 Any violation of Applicable Law or regulation regarding the invasion of privacy of any communications carried over CenturyLink’s facilities, or that creates hazards to the employees of CenturyLink or to the public, is also considered an impairment of service. 60.6 CenturyLink shall give advanced notice to CLEC of all non-scheduled maintenance or other planned network activities to be performed by CenturyLink on any Network Element, including any hardware, equipment, software, or system, providing service functionality of which CLEC has advised CenturyLink may potentially impact CLEC End Users. 60.7 The Parties shall provide notice of network changes and upgrades in accordance with 47 C.F.R. §§51.325 through 51.335. CenturyLink may discontinue any Interconnection arrangement, Telecommunications Service, or Network Element provided or required hereunder due to network changes or upgrades after providing CLEC notice as required by this Section. CenturyLink agrees to cooperate with CLEC and/or the appropriate regulatory body in any transition resulting from such discontinuation of service and to minimize the impact to customers which may result from such discontinuance of service.
Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:
Loop A transmission path that extends from a Main Distribution Frame or functionally comparable piece of equipment in a Customer's serving End Office, to the Rate Demarcation Point (or NID if installed at the Rate Demarcation Point) in or at the Customer's premises. The actual transmission facilities used to provide a Loop may utilize any of several technologies.
Resilience Abbott has implemented the following technical and organisational security measures, in particular to ensure the reliability of our processing systems and services: (i) Data protection management policies and procedures; (ii) Incident response policies and procedures; (iii) Data protection-friendly pre-settings (under Article 25(1)) of Regulation (EU) 2016/679; and (iv) Order control.
Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:
Traffic Management 9.2.1 During the Operating Period, Developer shall be responsible for the general management of traffic on the Project. Developer shall manage traffic so as to preserve and protect safety of traffic on the Project and Related Transportation Facilities and, to the maximum extent practicable, to avoid disruption, interruption or other adverse effects on traffic flow, throughput or level of service on the Project and Related Transportation Facilities. Developer shall conduct traffic management in accordance with all applicable Technical Provisions, Technical Documents, Laws and Governmental Approvals, and in accordance with the Traffic Management Plan. 9.2.2 Developer shall prepare and submit to TxDOT and the Independent Engineer for TxDOT approval a Traffic Management Plan for managing traffic on the Project and Related Transportation Facilities after the commencement of traffic operations on any portion of the Project, addressing (a) orderly and safe movement and diversion of traffic on Related Transportation Facilities during Project construction, (b) orderly and safe movement of traffic on the Project and (c) orderly and safe diversion of traffic on the Project and Related Transportation Facilities necessary in connection with field maintenance and repair work or Renewal Work or in response to Incidents, Emergencies and lane closures. Developer shall prepare the Traffic Management Plan according to the schedule set forth in the Technical Provisions. The Traffic Management Plan shall comply with the Technical Provisions and Technical Documents concerning traffic management and traffic operations. Developer shall carry out all traffic management during the Term in accordance with the approved Traffic Management Plan. 9.2.3 Developer shall implement the Traffic Management Plan to promote safe and efficient operation of the Project and Related Transportation Facilities at all times during the course of any construction or operation of the Project and during the Utility Adjustment Work. 9.2.4 TxDOT shall have at all times, without obligation or liability to Developer, the right 9.2.4.1 Issue Directive Letters to Developer regarding traffic management 9.2.4.2 Provide on the Project, via message signs or other means consistent with Good Industry Practice, non-Discriminatory traveler and driver information, and other public information (e.g. amber alerts), provided that the means to disseminate such information does not materially interfere with the functioning of the ETCS.
Virus Management DST shall maintain a malware protection program designed to deter malware infections, detect the presence of malware within DST environment.
Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.
Dark Fiber 8.1 Access to unbundled Dark Fiber will be provided by Verizon, where existing facilities are available at the requested availability date, in the loop, subloop and interoffice facilities (IOF) portions of the Company's network. Access to Dark Fiber will be provided in accordance with, but only to the extent required by, Applicable Law. Except as otherwise required by Applicable Law, the following terms and conditions apply to Verizon's Dark Fiber offering. 8.2 A “Dark Fiber Loop” consists of continuous fiber optic strand(s) in a Verizon fiber optic cable between the fiber distribution frame, or its functional equivalent, located within a Verizon Wire Center, and Verizon’s main termination point, such as the fiber patch panel located within a Customer premise, and that has not been activated through connection to the electronics that “light” it, and thereby render it capable of carrying Telecommunications Services. In addition to the other terms and conditions of this Agreement, the following terms and conditions also shall apply to Dark Fiber Loops: 8.2.1 Verizon shall be required to provide a Dark Fiber Loop only where (1) one end of the Dark Fiber Loop terminates at Z-Tel's collocation arrangement and (2) the other end terminates at the Customer premise. A CLEC demarcation point shall be established either in the main telco room of a building where a Customer is located or, if the building does not have a main telco room, then at a location to be determined by Verizon. Verizon shall connect a Dark Fiber Loop to the demarcation point by installing a fiber jumper. 8.2.2 Z-Tel may access a Dark Fiber Loop only at a pre-existing hard termination point of such Dark Fiber Loop, and Z-Tel may not access a Dark Fiber Loop at any other point, including, but not limited to, a splice point. Verizon will not introduce additional splice points or open existing splice points to accommodate a CLEC’s request. Unused fibers located in a cable vault or a controlled environment vault, manhole or other location outside the Verizon Wire Center, and not terminated to a fiber patch, are not available to Z-Tel. 8.2.3 A strand shall not be deemed to be continuous if splicing is required to provide fiber continuity between two locations. Dark Fiber will only be offered on a route-direct basis where facilities exist (i.e., no intermediate offices). 8.2.4 Verizon shall perform all work necessary to install a cross connection or a fiber jumper, including, but not limited to, the work necessary to connect a dark fiber to a demarcation point, a fiber distribution frame or a POT bay. 8.2.5 At the Customer premise, unused fibers are not available to Z-Tel pursuant to this Attachment unless such fibers terminate on a fiber patch panel. Unused fibers in a fiber splice point located outside the Customer premise are not available to Z-Tel. 8.2.6 Dark Fiber will be offered to Z-Tel in the condition that it is available in Verizon's network at the time that Z-Tel submits its request (i.e., "as is"). In addition, Verizon shall not be required to convert lit fiber to Dark Fiber for Z-Tel's use. 8.2.7 Spare wavelengths on fiber strands, where Wave Division Multiplexing (WDM) or Dense Wave Division Multiplexing (DWDM) equipment is deployed, are not considered to be spare Dark Fiber Loops and, therefore, will not be offered to Z-Tel as Dark Fiber. 8.2.8 Z-Tel shall be responsible for providing all transmission, terminating and regeneration equipment necessary to light and use Dark Fiber. 8.2.9 Z-Tel may not resell Dark Fiber purchased pursuant to this Attachment to third parties. 8.2.10 In order for Verizon to continue to satisfy its carrier of last resort (COLR) obligations under Applicable Law and/or to preserve the efficiency of its network, Verizon will limit Z-Tel to leasing a maximum of twenty-five percent (25%) of the Dark Fiber in any given segment of Verizon's network during any two-year period. In addition, except as otherwise required by Applicable Law, Verizon may take any of the following actions, notwithstanding anything to the contrary in this Agreement: 8.2.10.1 Revoke Dark Fiber leased to Z-Tel upon a showing of need to the Commission and twelve (12) months' advance written notice to Z-Tel; and 8.2.10.2 Revoke Dark Fiber leased to Z-Tel upon a showing to the Commission that Z-Tel underutilized fiber (less than OC-12) within any twelve (12) month period. 8.2.10.3 Verizon may reserve Dark Fiber for maintenance purposes, or to satisfy Customer orders for fiber related services or for future growth. Verizon reserves and shall not waive, Verizon’s right to claim before the Commission that Verizon should not have to fulfill a Z-Tel order for Dark Fiber because that request would strand an unreasonable amount of fiber capacity, disrupt or degrade service to Customers or carriers other than Z-Tel, or impair a Verizon obligation to serve as a carrier of last resort. 8.2.11 Z-Tel may not reserve Dark Fiber.
Patch Management All workstations, laptops and other systems that process and/or 20 store PHI COUNTY discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or 21 transmits on behalf of COUNTY must have critical security patches applied, with system reboot if 22 necessary. There must be a documented patch management process which determines installation 23 timeframe based on risk assessment and vendor recommendations. At a maximum, all applicable 24 patches must be installed within thirty (30) calendar or business days of vendor release. Applications 25 and systems that cannot be patched due to operational reasons must have compensatory controls 26 implemented to minimize risk, where possible.