Common use of VISIBILITY STUDY Clause in Contracts

VISIBILITY STUDY. See Location Sketch (Page 3) Train Speed 60 MPH Roadway Speed 55 MPH Required Stopping Sight Distance (SSD) Along Roadway 520 FEET Along Tracks 647 FEET Reqd. Clearing Sight Dist. (CSD) (Along Tracks) 1441 FEET Distances calculated per American Association of State Highway and Transportation Officials (AASHTO), A Policy on Geometric Design of Highways and Streets, 2001, Fourth Edition. QUADRANT CSD (FT) OBSTRUCTION SSD (FT) OBSTRUCTION SE Brush 400 Trees NW Brush 50 Mature Crops SW Brush 100 Trees NE Brush 50 Mature Crops *Note: Automatic flashing light signals and gates (AFLSG) eliminate the need to satisfy minimum Sight Distance criteria. APPROACH GRADES: See Location Sketch (Page 3) DIRECTION/West DIRECTION/East DISTANCE (FT) ELEVATION (FT) GRADE (%) DISTANCE (FT) ELEVATION (FT) GRADE (%) 0 100’ --- 0 100’ --- Distance measured from outermost rail. COMMENTS: See Page 3 for a Location Sketch (Aerial Photo) of the crossing. Staff recommends that the GCPF be used to reimburse CSX 95% of the cost to replace existing Crossbuck/YIELD signs with automatic flashing lights signals & gates, event recorder, remote monitor, and track circuits, and that the CSX pay all remaining installation costs. Staff recommends that the CSX be responsible for all future maintenance and operating costs for the new automatic warning devices. Staff also recommends that the GCPF be used to reimburse South Xxxx Township Road District 100% of the costs to reconstruct the roadway approach grades to meet the minimum requirements of 92 Ill. Ad. Code 1535.204. Staff recommends that the South Xxxx Township should also be responsible for all future maintenance costs associated with the new roadway approaches. The County will be acting as South Xxxx Township’s project manager, and as such has been included as a signatory to this agreement at IDOT’s request. Reflect Xbuck

Appears in 1 contract

Samples: Stipulated Agreement

AutoNDA by SimpleDocs

VISIBILITY STUDY. See Location Sketch (Page 3) Train Speed 60 MPH Roadway Speed 55 MPH Required Stopping Sight Distance (SSD) Along Roadway 520 FEET Along Tracks 647 FEET Reqd. Clearing Sight Dist. (CSD) (Along Tracks) 1441 FEET Distances calculated per American Association of State Highway and Transportation Officials (AASHTO), A Policy on Geometric Design of Highways and Streets, 2001, Fourth Edition. QUADRANT CSD (FT) OBSTRUCTION SSD (FT) OBSTRUCTION SE Brush 400 Trees NW Brush 50 Mature Crops SW Brush 100 Trees NE Brush 50 Mature Crops *Note: Automatic flashing light signals and gates (AFLSG) eliminate the need to satisfy minimum Sight Distance criteria. APPROACH GRADES: See Location Sketch (Page 3) DIRECTION/West DIRECTION/East DISTANCE (FT) ELEVATION (FT) GRADE (%) DISTANCE (FT) ELEVATION (FT) GRADE (%) 0 100’ --- 0 100’ --- Distance measured from outermost rail. COMMENTS: See Page 3 for a Location Sketch (Aerial Photo) of the crossing. Staff recommends that the GCPF be used to reimburse CSX 95% of the cost to replace existing Crossbuck/YIELD signs with automatic flashing lights signals & gates, event recorder, remote monitor, and track circuits, and that the CSX pay all remaining installation costs. Staff recommends that the CSX be responsible for all future maintenance and operating costs for the new automatic warning devices. Staff also recommends that the GCPF be used to reimburse South Xxxx Milford Township Road District 100% of the costs to reconstruct the roadway approach grades to meet the minimum requirements of 92 Ill. Ad. Code 1535.204. Staff recommends that the South Xxxx Township should also be responsible for all future maintenance costs associated with the new roadway approaches. The County will be acting as South Xxxx Milford Township’s project manager, and as such has been included as a signatory to this agreement at IDOT’s request. Reflect Xbuck

Appears in 1 contract

Samples: Stipulated Agreement

VISIBILITY STUDY. See Location Sketch (Page 3) Train Speed 60 79 MPH Roadway Speed 55 30 MPH Required Stopping Sight Distance (SSD) Along Roadway 520 222 FEET Along Tracks 647 791 FEET Reqd. Clearing Sight Dist. (CSD) (Along Tracks) 1441 1921 FEET Distances calculated per American Association of State Highway and Transportation Officials (AASHTO), A Policy on Geometric Design of Highways and Streets, 2001, Fourth Edition. QUADRANT CSD (FT) OBSTRUCTION SSD (FT) OBSTRUCTION SE Brush 400 Trees NW Brush 50 Mature Crops SW Brush 100 Trees NE Brush 50 Mature Crops OBST MULTIPLE RR TRACKS OBST MULTIPLE RR TRACKS XX XXXX MULTIPLE RR TRACKS OBST MULTIPLE RR TRACKS XX XXXX MULTIPLE RR TRACKS OBST MULTIPLE RR TRACKS XX XXXX MULTIPLE RR TRACKS OBST MULTIPLE RR TRACKS *Note: Automatic flashing light signals and gates (AFLSGAFLS&G) eliminate the need to satisfy minimum Sight Distance criteria. APPROACH GRADES: See Location Sketch (Page 3) DIRECTION/West DIRECTION/East DISTANCE (FT) ELEVATION (FT) GRADE (%) DISTANCE (FT) ELEVATION (FT) GRADE (%) 0 100’ --- 0 100’ --- SEE EXHIBIT A PAGE 3 Distance measured from outermost rail. COMMENTS: See Page 3 for a Location Sketch (Aerial Photo) of the crossing. Staff recommends that the GCPF be used to reimburse CSX pay 95% of the cost to replace existing Crossbuck/YIELD signs with install new automatic flashing lights signals & gates, event recorder, remote monitor, and track circuits, and that the CSX IC pay all remaining installation costs. Staff recommends that the CSX be responsible for all future maintenance and operating costs for the new automatic warning devices. Staff also recommends that the GCPF be used to reimburse South Xxxx Township Road District 100% of the costs to reconstruct the roadway approach grades to meet the minimum requirements of 92 Ill. Ad. Code 1535.204. Staff recommends that the South Xxxx Township should also IC be responsible for all future operation and maintenance costs associated with the new roadway approachesautomatic warning devices at CR 2700N crossing. The County will be acting as South Xxxx SA2286 Exhibit A Page 3 SA2286 Exhibit B ILLINOIS CENTRAL RAILROAD COMPANY A WHOLLY OWNED SUBSIDIARY OF CANADIAN NATIONAL RAILWAY COMPANY HIGHWAY-RAIL GRADE CROSSING SIGNAL ESTIMATE Estimate No.: 23-1283 Date: April 17, 2023 Roadway Name: 2700 N Location: Ashkum, IL Railroad Region: Southern Railroad Subdivision: Chicago Railroad Milepost: 071.65 DOT Crossing No.: 288974F Description of Work: Install flashing light signals (LED) with gates and bell controlled by constant warning time circuitry in a new pre-wired bungalow. 2700 N Page 2 Ashkum, IL 23-1283 MATERIAL MISCELLANEOUS MATERIAL Item Quantity Units Unit Cost Cost Backfill 100 TON $ 90.00 $ 9,000.00 Signal Material 1 LOT $ 5,000.00 $ 5,000.00 Generator - RedHawk Fuel Cell SUBTOTAL MISCELLANEOUS MATERIAL 1 EACH $ 22,000.00 $ 22,000.00 ========= $ 36,000.00 CROSSING PACKAGE MATERIAL Item Quantity Units Unit Cost Cost Pre-wired Aluminum Bungalow, 8'x8' 1 EACH $ 35,000.00 $ 35,000.00 ElectrologIXS XP4, 2 Track (redundant) 1 EACH $ 22,500.00 $ 22,500.00 XIP-20B Interface Panel, wall mount & cable 2 EACH $ 500.00 $ 1,000.00 DAU crossing monitor 1 EACH $ 2,200.00 $ 2,200.00 WSDMM module 1 EACH $ 4,500.00 $ 4,500.00 Modem, Cellular 1 EACH $ 3,500.00 $ 3,500.00 Converter, 12VDC/12VDC 1 EACH $ 1,500.00 $ 1,500.00 Antenna with 36” Pole Kit 1 EACH $ 1,500.00 $ 1,500.00 Rectifier, NRS HF-MAX 2 EACH $ 1,800.00 $ 3,600.00 Battery, Ni-Cad, SPL 250 AH 11 EACH $ 210.00 $ 2,310.00 Battery, Ni-Cad, SPL 340 AH 10 EACH $ 280.00 $ 2,800.00 Foundation, Gate 2 EACH $ 1,200.00 $ 2,400.00 LED Flasher & Gate Assembly, 2-Way 2 EACH $ 9,500.00 $ 19,000.00 Gate Arm 2 EACH $ 900.00 $ 1,800.00 Gatekeeper 2 EACH $ 2,000.00 $ 4,000.00 Bell, Electronic 1 EACH $ 400.00 $ 400.00 Shunt/Coupler Enclosure 5 EACH $ 1,200.00 $ 6,000.00 Narrow-band shunt, multifrequency 5 EACH $ 700.00 $ 3,500.00 Track Wire, 2c#6 600 FEET $ 1.80 $ 1,080.00 Power Cable,3c#2 500 FEET $ 7.70 $ 3,850.00 Signal Cable, 16c(7c#6,9c#14) SUBTOTAL CROSSING PACKAGE MATERIAL 400 FEET $ 8.00 $ 3,200.00 ========= $ 125,640.00 TOTAL MATERIAL ========= $ 161,640.00 2700 N Page 3 Ashkum, IL 23-1283 LABOR SIGNAL LABOR Item Quantity Units Cost/Day Cost 6-man Gang 14 Gang Days $ 3,500.00 $ 49,000.00 SUBTOTAL SIGNAL LABOR $ ========= 49,000.00 MISCELLANEOUS LABOR Item Quantity Units Unit Cost Cost Preliminary Engineering 1 L.S. $ 2,500.00 $ 2,500.00 Construction Engineering 1 L.S. $ 2,500.00 $ 2,500.00 Accounting SUBTOTAL MISCELLANEOUS LABOR 1 L.S. $ 200.00 $ $ 200.00 ========= 5,200.00 TOTAL LABOR $ ========= 54,200.00 OTHER Item Quantity Units Unit Cost Cost Contractor/Rented Equipment 1 L.S. $ 8,750.00 $ 8,750.00 Directional Boring (By Others) 200 FT $ 41.00 $ 8,200.00 Power Service, AC 1 L.S. $ 30,000.00 $ 30,000.00 Freight on Crossing Package 1 L.S. $ 5,000.00 $ 5,000.00 Construction Engineering (Contracted) 1 L.S. $ 8,500.00 $ 8,500.00 Waste Disposal 1 L.S. $ 2,500.00 $ 2,500.00 Per Diem/Business Expense 1 L.S. $ 28,000.00 $ 28,000.00 Sales Tax on Material TOTAL OTHER 1 L.S. $ 8,795.00 $ $ 8,795.00 ========= 99,745.00 TOTAL DIRECT COSTS $ ========= 315,585.00 2700 N Page 4 Ashkum, IL 23-1283 FHWA ADDITIVES Material Material Additive 5.00% $ 161,640.00 $ 8,082.00 Signal Labor Signal Labor Additive 159.61% $ 49,000.00 $ 78,209.00 Engineering Labor Engineering Labor Additive 159.61% $ 5,000.00 $ 7,981.00 Accounting Labor Accounting Labor Additive 159.61% $ 200.00 $ 319.00 Other Total - Direct Costs $ 99,745.00 ========= $ 315,585.00 ========= Total - Additives Grand Total FHWA Basis $ 94,591.00 ========= $ 410,176.00 Funding Source (DOT) 90.00% of FHWA Amount $ 369,158.40 SA2286 EXHIBIT B SA 2286 Exhibit B1 ILLINOIS COMMERCE COMMISSION TRANSPORTATION BUREAU / RAIL SAFETY SECTION PROJECT STATUS REPORT: TYPE: (CHECK ONE) PROGRESS COMPLETION DATE PROJECT INFORMATION: Reporting Party: Illinois Central Railroad Company (IC) Docket/Order #; Date: Status Report (s) Due: 6 Month Intervals from Order Date Ordered Completion Date: Within 18 Months from Order Date Completion Report Due: 5 Days after completion of work AAR/DOT#, Milepost: 288974F railroad milepost 71.65-M Street, (in/near) City, County: CR 2700N, Ashkum Township’s project manager, and as such has been included as a signatory to this agreement at IDOT’s requestIroquois County, Illinois Railroad Company: IC PROJECT MANAGER INFORMATION: Name: Xxxxxx Xxxxxxxx Title: Manager, Public Works Representing: IC Street Address: 00000 X. Xxxxxxx Xxx. Reflect XbuckCity, State, Zip: Homewood, IL 60430 Office Phone: (000) 000-0000 Office Fax: Cellular Phone: E-Mail Address: xxxxxx.xxxxxxxx@xx.xx DESCRIPTION OF IMPROVEMENT(S) ORDERED:

Appears in 1 contract

Samples: Stipulated Agreement

AutoNDA by SimpleDocs

VISIBILITY STUDY. See Location Sketch (Page 3) Train Speed 60 10 MPH Roadway Speed 55 30 MPH Required Stopping Sight Distance (SSD) Along Roadway 520 222 FEET Along Tracks 647 99 FEET Reqd. Required Clearing Sight Dist. Distance (CSD) (Along Tracks) 1441 240 FEET Distances calculated per American Association of State Highway and Transportation Officials (AASHTO), A Policy on Geometric Design of Highways and Streets, 2001, Fourth Edition. QUADRANT CSD (FT) OBSTRUCTION SSD (FT) OBSTRUCTION NE ok none obstr trees/buildings NW ok none obstr trees SE Brush 400 Trees NW Brush 50 Mature Crops ok none obstr building SW Brush 100 Trees NE Brush 50 Mature Crops ok* *signal cabin partially obstructs view ok none *Note: Automatic flashing light signals and gates (AFLSGAFLS&G) eliminate the need to satisfy minimum Sight Distance criteria. APPROACH GRADESGRADES2: See Location Sketch (Page 3) 3 DIRECTION/West North DIRECTION/East South DISTANCE (FT) ELEVATION (FT) GRADE (%) DISTANCE (FT) ELEVATION (FT) GRADE (%) 0 100’ --- 0 100’ --- 25 100.0 0.0% 25 99.0 4.0% 50 100.2 0.8% 50 98.4 2.4% Distance measured from outermost rail. COMMENTS: See Page 3 for a Location Sketch (Aerial Photo) of the crossing. The City of East Peoria (City) has estimated roadway approach costs, in the amount of $78,000, will be necessary to meet the minimum grade requirements of 92 Ill. Adm. Code 1535.204 on the south highway approach to the crossing. Staff recommends that the Grade Crossing Protection Fund (GCPF) be used to pay 100% of the estimated approach costs, in an amount not to exceed $78,000. Staff would normally recommend that the City pay 100% of the costs for the approach grade improvements. Due to documented financial hardship (Exhibit D), the City is unable to pay the costs for the approach grade improvements. Staff considers the proposed approach improvements important enough to recommend that the GCPF be used to reimburse CSX 95% of the cost to replace existing Crossbuck/YIELD signs with automatic flashing lights signals & gates, event recorder, remote monitor, and track circuits, and that the CSX pay all remaining installation those costs. Staff recommends that the CSX be responsible for all future maintenance and operating costs for the new automatic warning devices. Staff also recommends that Since the GCPF be used to reimburse South Xxxx Township Road District 100% of is a Motor Fuel Tax-based funding source, the costs to reconstruct the roadway highway approach grades to design should also meet the minimum requirements 3R guidelines for existing highways contained in Chapter 33 of 92 Ill. Adthe Illinois Department of Transportation’s (IDOT) Bureau of Local Roads and Streets Manual. Code 1535.204SA 2017 - EXHIBIT B EAST PEORIA XXXXXX XX RR TRACK APPROACH IMPROVEMENTS SA 2017 - EXHIBIT B1 PRELIMINARY SCHEDULE OF PRICES ITEM NO. Staff recommends that the South Xxxx Township should also be responsible for all future maintenance costs associated with the new roadway approachesITEMS UNIT UNIT PRICE QUANTITY TOTAL 1 REM & REPL CURB AND GUTTER FT $ 75.00 200 $ 15,000.00 2 BIT SURF REM BUTT JOINT FT $ 30.00 32 $ 960.00 3 BIT SURF REM VARIABLE DEPTH SQ YD $ 20.00 370 $ 7,400.00 4 HMA BC IL 19.0 N50 TON $ 200.00 110 $ 22,000.00 5 P HMA SC D N50 TON $ 250.00 31 $ 7,750.00 6 P BIT MATLS PR CT GAL $ 15.00 55 $ 825.00 7 RR PROTECTIVE LIABILITY INSURANCE LSUM $ 10,000.00 1 $ 10,000.00 BUDGET CONSTRUCTION IMPROVEMENTS. The County will be acting as South Xxxx Township’s project manager, and as such has been included as a signatory to this agreement at IDOT’s request. Reflect Xbuck$ 63,935.00 ROUND FOR BUDGET REASONS $ 65,000.00 BUDGET ENGINEERING (ESTIMATED AT 20%) $ 12,787.00 ROUND FOR BUDGET REASONS $ 13,000.00 78,000.00 $ CONSTRUCTION AND ENGINEERING (ROUNDED FOR BUDGET REASONS) Section 1535 SA 2017 - EXHIBIT C Page 1 TITLE 92: TRANSPORTATION CHAPTER III: ILLINOIS COMMERCE COMMISSION SUBCHAPTER c: RAIL CARRIERS PART 1535 CROSSINGS OF RAIL CARRIERS AND HIGHWAYS SECTION 1535.204 GRADE LINE OF HIGHWAY APPROACHES

Appears in 1 contract

Samples: Stipulated Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.