VTTM and Related Document Submittals Sample Clauses

VTTM and Related Document Submittals. Not later than March 31, 2021 (the “VTTM Submittal Deadline”), Buyer shall submit to Seller Buyer’s proposed Tentative Tract Map for subdivision and development of the Property (“Buyer’s Tentative Tract Map” or ‘VTTM”) and those documents set forth in Section 7.2.1, Section 7.2.2, Section 7.2.3 and Section 7.2.4 of the DDA (collectively, the “VTTM Submittal”). Seller shall use good faith efforts to process Buyer’s complete VTTM Submittal prior to December 31, 2021, in accordance with applicable laws and required procedures. If the City has not taken final action on the VTTM Submittal on or prior to December 31, 2021, Buyer may elect to terminate this Agreement by delivery of written notice to Seller.
AutoNDA by SimpleDocs

Related to VTTM and Related Document Submittals

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall demonstrate and provide written assurance to Owner that all conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.

  • Plan Document Acknowledgement The Participant acknowledges that the Participant has read and specifically and expressly approves the following sections of the Agreement: Section 1: Grant of RSU Award; Section 2: Delivery; Section 3: Compliance with Laws and Regulations; Section 4: Rights as Shareholder; Section 5: Stop-Transfer Orders; Section 6: Taxes and Disposition of Shares; Section 7: Nature of Grant; Section 8: No advice Regarding Grant; Section 11: Governing Law; Venue; Section 15: Electronic Delivery; Section 16: Exhibit A; Section 18: Imposition of Other Requirements; and the Data Privacy section of this Exhibit A.

  • Copies of Contract Documents to Contractor Without charge to the Contractor the Design Professional shall furnish to the Contractor up to five sets of completed Contract Documents in hardcopy, one set of reproducible and electronic background floor and reflected ceiling plan drawings and, if requested, one copy in read-only electronic format. The Contractor may obtain such additional sets of Contract Documents, as the Contractor deems necessary and shall pay the cost of reproduction of such additional sets to the Design Professional.

  • Attachment  C_ CONTRACT AFFIRMATIONS For purposes of these Contract Affirmations, HHS includes both the Health and Human Services Commission (HHSC) and the Department of State Health Services (DSHS). System Agency refers to HHSC, DSHS, or both, that will be a party to this Contract. These Contract Affirmations apply to all Contractors and Grantees (referred to as “Contractor”) regardless of their business form (e.g., individual, partnership, corporation). By entering into this Contract, Contractor affirms, without exception, understands, and agrees to comply with the following items through the life of the Contract:

  • Plan Document Acknowledgment By accepting the RSUs, you acknowledge that you have received a copy of the Plan, reviewed the Plan, the Agreement and this Addendum A in their entirety and fully understand and accept all provisions of the Plan, the Agreement and this Addendum A. In addition, you further acknowledge that you have read and specifically and expressly approve without limitation the following clauses in the Agreement: Section 4 (Responsibility for Taxes); Section 7 (Acknowledgement of Nature of Plan and RSUs); Section 8 (No Advice Regarding Grant); Section 9 (Right to Continued Employment); Section 11 (Deemed Acceptance); Section 13 (Severability and Validity); Section 14 (Governing Law, Jurisdiction and Venue); Section 16 (Electronic Delivery and Acceptance); Section 17 (Xxxxxxx Xxxxxxx/Market Abuse Laws); Section 18 (Language); Section 19 (Compliance with Laws and Regulations); Section 20 (Entire Agreement and No Oral Modification or Waiver); Section 21 (Addendum A); Section 22 (Foreign Asset/Account Reporting Requirements and Exchange Controls); and Section 23 (Imposition of Other Requirements).

  • REVIEW OF CONTRACT DOCUMENTS 4.2.1 The Contractor shall carefully study and compare the Contract Documents and shall immediately report in writing to the Architect and the State any error, inconsistency or omission he may discover. The Contractor shall not be liable to the State or the Architect for any damage resulting from any such errors, inconsistencies or omissions in the Contract Documents. The

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Licensed Documentation If commercially available, Licensee shall have the option to require the Contractor to deliver, at Contractor’s expense: (i) one (1) hard copy and one (1) master electronic copy of the Documentation in a mutually agreeable format; (ii) based on hard copy instructions for access by downloading from the Internet

  • Required Documentation The AGENCY is responsible for ensuring that all documents required by this Contract are current and available for the COUNTY’S review upon request. These documents may include, but are not limited to, certificate(s) of insurance, job descriptions and background check confirmations of staff.

  • Description of the Transaction Documents The Transaction Documents will conform in all material respects to the respective statements relating thereto contained in the Offering Memorandum.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!