Work and residence permit Sample Clauses

Work and residence permit. This Contract is subject to obtaining necessary work and residence permit for the Employee to work in the Kingdom of Bahrain. ةمدخل لمعلا ءانثأ هتقاطو هتربخو هتاراهمو هتقو لماك سيركت .1 .ةقدبو ةيانعب ةكرشلا هنم اهبلطت يتلا هتابجاو ءادأو ةكرشلا .ةكرشلا / دلبلا حئاولو دعاوقب امً ئاد مازتللاا .2 ةكرشلا هل اهردصت يتلا تاهيجوتلاو رماولأا عيمجل لاثتملااو مازتللاا .3 دعاوقلا عيمجب ةنامأب لكب مازتللاا هيلع بجي امك اهيلوئسم للاخ نم ذيفنتل يلاحلا تقولا يف ةيراسلا ةكرشلاب ةصاخلا تابيترتلاو حئاوللاو هيفظوم كولسو ريس نسح ةبقارملو ةكرشلا لامعأ ةكرشلا حلاصم ةيامحل هلمع قاطن نمض هتردق هتقاط ةفاك لذب .4 .لامهلإاو رارضلأاو ةراسخلاو ةقرسلا نم اهتاكلتمم ةيامحو دنع ةكرشلا ىلإ ةكرشلاب ةصاخلا تاكلتمملاو تادعملا عيمج ةداعإ .5 .ةيلاحلا ةيقافتلاا ءاهتنا ةماقلإاو لمعلا حيرصت .ايناث نييرورضلا ةماقلإاو لمعلا حيرصت ىلع لوصحلاب طورشم دقعلا اذه .نيرحبلا ةكلمم يف لمعلل فظوملل III. Termination Breach
AutoNDA by SimpleDocs

Related to Work and residence permit

  • Building Permit As soon as the Final Interior Plans have been approved by Landlord and Tenant, Landlord shall apply for a building permit for the Interior Improvements, and shall diligently prosecute to completion such approval process.

  • Operations Logs Seller shall maintain a complete and accurate log of all material operations and maintenance information on a daily basis. Such log shall include, but not be limited to, information on power production, fuel consumption, efficiency, availability, maintenance performed, outages, results of inspections, manufacturer recommended services, replacements, electrical characteristics of the generators, control settings or adjustments of equipment and protective devices. Seller shall maintain this information for at least two (2) years and shall provide this information electronically to Buyer within one day of Buyer’s request.

  • Building Permits All building permits required for the construction of the Improvements have been obtained prior to the commencement of the construction of the Improvements and copies of same will be delivered to Lessor.

  • PARKING PERMITS A. Must be obtained on the day of move in.

  • Project Location [Insert the location of the Project, if applicable]

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Parking Facilities Alamo Colleges District shall make the existing parking facilities at the rented Facility available for the vehicular traffic and parking necessitated by the Organization’s Use of the rented Facility, on a non-exclusive basis, as specified at Exhibit A. MAXIMUM CAPACITY. Organization anticipates approximately the number of participants stated at Exhibit A and agrees to inform Alamo Colleges District of any significant changes five (5) business days in advance of a Use. Organization shall not admit a larger number of persons than can safely and freely move about the Facility. Alamo Colleges District shall notify Organization of the recommended capacity of the Facility and all decisions of Alamo Colleges District concerning questions arising under this Paragraph shall be final.

  • PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Occupancy Permit CLEC occupancy of Structure shall be pursuant to a permit issued by CBT for each requested Attachment. Any such permit shall terminate (a) if CLEC's franchise, consent or other authorization from federal, state, county or municipal entities or private property owners is terminated, (b) if CLEC has not placed and put into service its Attachments within one hundred eighty (180) days from the date CBT has notified CLEC that such Structure is available for CLEC's Attachments, and such delay is not caused by an CBT Delaying Event, (c) if CLEC ceases to use such Attachment for any period of one hundred eighty (180) consecutive days, (d) if CLEC fails to comply with a material term or condition of this Article XVI and does not correct such noncompliance within sixty (60) days after receipt of notice thereof from CBT or (e) if CBT ceases to have the right or authority to maintain its Structure, or any part thereof, to which CLEC has Attachments. If CBT ceases to have the right or authority to maintain its Structure, or any part thereof, to which CLEC has Attachments, CBT shall (i) provide CLEC notice within ten (10) Business Days after CBT has knowledge of such fact and (ii) not require CLEC to remove its Attachments from such Structure prior to CBT's removal of its own attachments. CBT will provide CLEC with at least sixty (60) days written notice prior to (x) terminating a permit or service to an CLEC Attachment or removal thereof for a material breach of the provisions of this Article XVI, (y) any increase in the rates for Attachments to CBT's Structure permitted by the terms of this Agreement, or (z) any modification to CBT's Structure to which CLEC has an Attachment, other than a modification associated with routine maintenance or as a result of an emergency. If CLEC surrenders its permit for any reason (including forfeiture under the terms of this Agreement), but fails to remove its Attachments from the Structure within one hundred eighty (180) days after the event requiring CLEC to so surrender such permit, CBT shall remove CLEC's Attachments at CLEC's expense.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!