Work Method. The Contractor shall use a combination of both Labour and equipment to carry out this Item work. No haulage equipment shall be used unless its capacity has been ascertained the Engineer. The quality of gravel dumped on the carriageway/carriageway shall be visually checked daily. The quantity of material delivered in each load shall be checked before dumping is allowed. The distance between the stacks shall be checked using tape measure.
Appears in 5 contracts
Samples: Performance Based Contract, Performance Based Contract, Performance Based Contract