Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired.
Appears in 83 contracts
Sources: Generator Interconnection Agreement, Interconnection Agreement, Service Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retiredpermanently ceases Commercial Operations.
Appears in 54 contracts
Sources: Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retiredpermanently ceases Commercial Operations.
Appears in 39 contracts
Sources: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retiredpermanently ceases Commercial Operations.
Appears in 23 contracts
Sources: Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retiredpermanently ceases Commercial Operations.
Appears in 22 contracts
Sources: Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired.
Appears in 21 contracts
Sources: Service Agreement, Interconnection Agreement, Standard Large Generator Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired.
Appears in 18 contracts
Sources: Standard Large Generator Interconnection Agreement, Interconnection Agreement, Standard Large Generator Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Merchant Transmission Facility is Retiredpermanently ceases Commercial Operations.
Appears in 16 contracts
Sources: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired. Default. Any Party may terminate this Agreement in accordance with Article 17.
Appears in 11 contracts
Sources: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner Owners ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner Owners notifying FERC after the Large Generating Facility is Retiredpermanently ceases Commercial Operations, subject to NRC Requirements and Commitments.
Appears in 11 contracts
Sources: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Written Notice. This Agreement may be terminated terminated: (i) by the Developer after giving the NYISO and Connecting Affected Transmission Owner ninety (90) Calendar Days advance written notice, or (ii) by the NYISO and Connecting the Affected Transmission Owner notifying FERC after giving the Developer written notice within ten (10) Calendar Days after the LGIA for the Large Generating Facility is Retiredamong the NYISO, Connecting Transmission Owner, and Developer has been terminated and such notice of termination has been accepted by FERC.
Appears in 8 contracts
Sources: Engineering, Procurement, and Construction Agreement, Engineering, Procurement, and Construction Agreement, Engineering, Procurement, and Construction Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired.
Appears in 8 contracts
Sources: Service Agreement, Lgia (Large Generator Interconnection Agreement), Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Merchant Transmission Facility is Retiredpermanently ceases Commercial Operation.
Appears in 7 contracts
Sources: Merchant Transmission Facility Interconnection Agreement, Service Agreement, Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired. Default. Any Party may terminate this Agreement in accordance with Article 17.
Appears in 5 contracts
Sources: Interconnection Agreement, Standard Large Generator Interconnection Agreement, Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired. Any Party may terminate this Agreement in accordance with Article 17.
Appears in 4 contracts
Sources: Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement
Written Notice. This Agreement may be terminated terminated: (i) by the Transmission Developer after giving the NYISO and Connecting Transmission Owner Affected System Operator ninety (90) Calendar Days advance written notice, or (ii) by the NYISO and the Affected System Operator after giving the Transmission Developer written notice within ten (10) Calendar Days after the Cedar Expansion Interconnection Agreement among the NYISO, Connecting Transmission Owner notifying FERC after the Large Generating Facility is RetiredOwner, and Transmission Developer has been terminated and such notice of termination has been accepted by FERC.
Appears in 3 contracts
Sources: Engineering, Procurement, Construction, Operation, and Maintenance Agreement, Engineering, Procurement, Construction, Operation, and Maintenance Agreement, Engineering, Procurement, Construction, Operation, and Maintenance Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired. Default. Any Party may terminate this Agreement in accordance with Article 17.
Appears in 3 contracts
Sources: Lgia, Large Generator Interconnection Agreement (Lgia), Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired.. Default. Any Party may terminate this Agreement in accordance with Article Article 17..
Appears in 3 contracts
Sources: Standard Large Generator Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Written Notice. This Agreement may be terminated terminated: (i) by the Developer after giving the NYISO and Connecting Affected Transmission Owner ninety (90) Calendar Days advance written notice, or (ii) by the NYISO and Connecting the Affected Transmission Owner notifying FERC after giving the Developer written notice within ten (10) Calendar Days after the LGIA for the Large Generating Facility is Retiredamong the NYISO, Connecting Transmission Owner, and Developer has been terminated and such notice of termination has been accepted by FERC.
Appears in 2 contracts
Sources: Engineering, Procurement, and Construction Agreement, Engineering, Procurement, and Construction Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90: (i) by all Parties agreeing in writing to terminate this Agreement, or (ii) by the NYISO and the Affected System Operator after giving the Developer ten (10) Calendar Days advance advanceadvanced written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after after the Large Generator Interconnection Agreement for the Large Generating Facility is RetiredRetiredamong the NYISO, NYPA, and Developer has been terminated and such notice of termination has been accepted by FERC.
Appears in 2 contracts
Sources: Engineering, Procurement, and Construction Agreement, Standard Large Generator Interconnection Service Agreement
Written Notice. This Agreement may be terminated by the Developer DeveloperInterconnection Customer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retiredpermanently ceases Commercial Operations.
Appears in 2 contracts
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired.. SERVICE AGREEMENT NO. 2452
Appears in 2 contracts
Sources: Interconnection Agreement, Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90: (i) by all Parties agreeing in writing to terminate this Agreement, or (ii) by the NYISO and the Affected System Operator after giving Developer ten (10) Calendar Days advance advanceadvanced written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after after the Large Generator Interconnection Agreement for the Large Generating Facility is RetiredRetiredamong the NYISO, Connecting Transmission Owner, and Developer has been terminated and such notice of termination has been accepted by FERC.
Appears in 1 contract
Sources: Engineering, Procurement, and Construction Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired.. SERVICE AGREEMENT NO. 2593
Appears in 1 contract
Sources: Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired. SERVICE AGREEMENT NO. 2473 Default. Any Party may terminate this Agreement in accordance with Article 17.
Appears in 1 contract
Sources: Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired. SERVICE AGREEMENT NO. 2535 Default. Any Party may terminate this Agreement in accordance with Article 17.
Appears in 1 contract
Sources: Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired.
Appears in 1 contract
Sources: Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating GeneratingMerchant Transmission Facility is RetiredRetiredpermanently ceases Commercial Operation.
Appears in 1 contract
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90: (i) by all Parties agreeing in writing to terminate this Agreement, or (ii) by the NYISO and the Affected System Operator after giving Developer ten (10) Calendar Days advance advanceadvanced written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired. after the Large Generator Interconnection Agreement has been terminated and such notice of termination has been accepted by FERC.
Appears in 1 contract
Sources: Engineering, Procurement, and Construction Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety ninety: (90i) by all Parties agreeing in writing to terminate this Agreement, or (ii) by the NYISO and the Affected System Operator after giving the Developer ten (910) Calendar Days advance advanced written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after after the Large Generator Interconnection Agreement for the Large Generating Facility is RetiredRetiredamong the NYISO, National Grid, and Developer has been terminated and such notice of termination has been accepted by FERC.
Appears in 1 contract
Sources: Engineering, Procurement, and Construction Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90: (i) by all Parties agreeing in writing to terminate this Agreement, or (ii) by the NYISO and the Affected System Operator after giving the Interconnection Customer ten (10) Calendar Days advance advanceadvanced written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large after the Small Generator Interconnection Agreement for the Small Generating Facility is RetiredRetiredhas been terminated and such notice of termination has been accepted by FERC.
Appears in 1 contract
Sources: Interconnection Service Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired.. SERVICE AGREEMENT NO. 2811
Appears in 1 contract
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Transmission Facility is Retiredpermanently ceases Commercial Operations.
Appears in 1 contract
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating GeneratingMerchant Transmission Facility is Retiredpermanently ceases Commercial Operations.
Appears in 1 contract
Sources: Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90: (i) by all Parties agreeing in writing to terminate this Agreement, or (ii) by the NYISO and the Affected System Operator after giving the Developer ten (10) Calendar Days advance advanceadvanced written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after after the Large Generator Interconnection Agreement for the Large Generating Facility is RetiredRetiredamong the NYISO, National Grid, and Developer has been terminated and such notice of termination has been accepted by FERC.
Appears in 1 contract
Sources: Standard Large Generator Interconnection Service Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired. SERVICE AGREEMENT NO. 2773 Default. Any Party may terminate this Agreement in accordance with Article 17.
Appears in 1 contract
Sources: Interconnection Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retiredpermanently ceases Commercial Operations. Default. Any Party may terminate this Agreement in accordance with Article 17.
Appears in 1 contract
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90: (i) by all Parties agreeing in writing to terminate this Agreement, or (ii) by the NYISO and the Affected System Operator after giving the Developer ten (10) Calendar Days advance advanceadvanced written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after after the Large Generator Interconnection Agreement for the Large Generating Facility is RetiredRetiredamong the NYISO, NYSEG, and Developer has been terminated and such notice of termination has been accepted by FERC.
Appears in 1 contract
Sources: Standard Large Generator Interconnection Service Agreement
Written Notice. This Agreement may be terminated by the Developer after giving giving: (i) by all Parties agreeing in writing to terminate this Agreement, or (ii) by the NYISO and and, Connecting Transmission Owner ninety ninety, and the Affected System Operator after giving the Developer ten (90910) Calendar Days advance advanced written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after after the Large Generator Interconnection Agreement for the Large Generating Facility is RetiredRetiredamong the NYISO, Connecting Transmission Owner, and Developer has been terminated and such notice of termination has been accepted by FERC.
Appears in 1 contract
Sources: Engineering, Procurement, and Construction Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired. SERVICE AGREEMENT NO. 2790 Default. Any Party may terminate this Agreement in accordance with Article 17.
Appears in 1 contract
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired.. 10 SERVICE AGREEMENT NO. 2629
Appears in 1 contract
Written Notice. This Agreement may be terminated terminated: (i) by the Transmission Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or (ii) by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired▇▇▇▇▇▇▇.▇▇ any time following their receipt of notice from the Transmission Developer indicating its intent not to proceed with the Transmission Project and Network Upgrade Facilities.
Appears in 1 contract
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90: (i) by all Parties agreeing in writing to terminate this Agreement, or (ii) by the NYISO and the Affected System Operator after giving the Interconnection Customer ten (10) Calendar Days advance advanceadvanced written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired. after the Small Generator Interconnection Agreement among the NYISO, National Grid, and Interconnection Customer has been terminated and such notice of termination has been accepted by FERC.
Appears in 1 contract
Sources: Engineering, Procurement, and Construction Agreement
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retiredpermanently ceases Commercial Operations.
Appears in 1 contract
Written Notice. The Developer may terminate this This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retiredpermanently ceases Commercial Operations.
Appears in 1 contract
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is Retired. Default. Any Party may terminate this Agreement in accordance with Article 17.
Appears in 1 contract
Sources: Interconnection Agreement
Written Notice. This Agreement may be terminated terminated: (i) by the Transmission Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or (ii) by the NYISO and Connecting Transmission Owner notifying FERC after at any time following their receipt of notice from the Large Generating Facility is RetiredTransmission Developer indicating its intent not to proceed with the Transmission Project and Network Upgrade Facilities.
Appears in 1 contract
Written Notice. This Agreement may be terminated by the Developer after giving the NYISO and Connecting Transmission Owner ninety (90) Calendar Days advance written notice, or by the NYISO and Connecting Transmission Owner notifying FERC after the Large Generating Facility is RetiredRetired.all Parties agreeing in writing to terminate this Agreement.
Appears in 1 contract
Sources: Engineering, Procurement, and Construction Agreement