Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.
Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.
Restoration The following provisions shall apply in connection with the Restoration of any Property or Properties affected by a Casualty: (a) If the Net Proceeds reasonably expected to be received in connection with any single Casualty event is less than the Casualty Threshold Amount, then, (i) if no Event of Default shall have occurred and be continuing and, within sixty (60) days of the date of the occurrence of such Casualty, Borrower delivers to Lender a written undertaking to expeditiously commence and to satisfactorily complete with due diligence the Restoration of the affected Properties in accordance with the terms of this Agreement, then (A) if Net Proceeds are paid by the insurance company directly to Borrower subsequent to delivering such undertaking, such Net Proceeds may be retained by Borrower (for the avoidance of doubt, Net Proceeds received by Borrower prior to delivering such undertaking shall be immediately paid to Lender as required by Section 5.2), (B) if Net Proceeds are paid by the insurance company to Lender, such Net Proceeds will be disbursed by Lender to Borrower and (C) Borrower shall conduct the Restoration of the affected Properties in accordance with the terms of Section 5.4(c) and (ii) if an Event of Default shall have occurred and be continuing or Borrower fails to deliver such an undertaking to Lender, then (A) Lender may retain any Net Proceeds received by it, (B) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2, (C) such Net Proceeds shall be applied to the prepayment of the Debt in accordance with Section 2.4.3(c), (D) Borrower shall prepay the Loan in an amount equal to the positive difference between such Net Proceeds and the Allocated Loan Amount for the affected Properties, together with all interest and other amounts required to be paid in connection therewith under Section 2.4.5, and (E) following Borrower’s written request and receipt by Lender of the Net Proceeds and payment by Borrower of the amounts set forth in clause (D) above, Lender shall release the affected Properties from the applicable Mortgage Documents and related Liens, provided, that (x) Borrower has delivered to Lender draft releases (and, in the event any of the Mortgages and the Assignments of Leases and Rents applicable to any of the affected Properties encumber other Property(ies) in addition to the affected Properties, such release shall be a partial release that relates only to the affected Property(ies) and does not affect the Liens and security interests encumbering or on the other Property(ies)) in form and substance appropriate for the jurisdiction in which such affected Properties are located and shall contain standard provisions protecting the rights of Lender and (y) Borrower shall pay all costs, taxes and expenses associated with such release (including, without limitation, cost to file and record the release and Lender’s reasonable attorneys’ fees). (b) If the Net Proceeds reasonably expected to be received in connection with any single Casualty event is greater than the Casualty Threshold Amount, then, (i) if no Event of Default shall have occurred and be continuing and, within sixty (60) days of the date of the occurrence of such Casualty, Borrower delivers to Lender a written undertaking to expeditiously commence and to satisfactorily complete with due diligence the Restoration of the affected Properties in accordance with the terms of this Agreement, then (A) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2 and (B) Borrower shall conduct the Restoration of the affected Properties in accordance with the terms of and subject to the conditions of Section 5.4(d) and (ii) if an Event of Default shall have occurred and be continuing or Borrower fails to deliver such an undertaking to Lender, then (A) Lender may retain any Net Proceeds received by it, (B) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2, (C) such Net Proceeds shall be applied to the prepayment of the Debt in accordance with Section 2.4.3(c), (D) Borrower shall prepay the Loan in an amount equal to the positive difference between such Net Proceeds and the Allocated Loan Amount for the affected Properties, together with all interest and other amounts required to be paid in connection therewith under Section 2.4.5, and (E) following Borrower’s written request and receipt by Lender of the Net Proceeds and payment by Borrower of the amounts set forth in clause (D) above, Lender shall release the affected Properties from the applicable Mortgage Documents and related Liens, provided, that (x) Borrower has delivered to Lender draft releases (and, in the event any of the Mortgages and the Assignments of Leases and Rents applicable to any of the affected Properties encumber other Property(ies) in addition to the affected Properties, such release shall be a partial release that relates only to the affected Property(ies) and does not affect the Liens and security interests encumbering or on the other Property(ies)) in form and substance appropriate for the jurisdiction in which such affected Properties are located and shall contain standard provisions protecting the rights of Lender and (y) Borrower shall pay all costs, taxes and expenses associated with such release (including, without limitation, cost to file and record the release and Lender’s reasonable attorneys’ fees). (c) If Borrower elects to undertake the Restoration of a Property or Properties pursuant to Section 5.4(a), (i) Borrower shall commence the Restoration as soon as reasonably practicable (but in no event later than ninety (90) days after such Casualty occurs) and shall diligently pursue the same to satisfactory completion; (ii) Borrower shall cause the affected Property and the use thereof after the Restoration to be in compliance with and permitted under all applicable Legal Requirements and such Property, after Restoration, shall be of the same character as prior to such damage or destruction; (iii) the Restoration shall be done and completed by Borrower in an expeditious and diligent fashion and in compliance with all applicable Legal Requirements and the Renovation Standards and (iv) Borrower shall deliver, or cause to be delivered, to Lender a signed detailed budget approved in writing by Borrower’s architect or engineer stating the entire cost of completing the Restoration, which budget shall be reasonably acceptable to Lender. (d) If Borrower elects to undertake the Restoration of a Property or Properties pursuant to Section 5.4(b), the following provisions shall apply: (i) the Net Proceeds shall be made available to Borrower for Restoration upon the determination of Lender that the following conditions are met: (i) Borrower shall commence the Restoration as soon as reasonably practicable (but in no event later than ninety (90) days after such Casualty occurs) and shall diligently pursue the same to satisfactory completion; (ii) Lender shall be satisfied that any operating deficits, including all scheduled payments of principal and interest under the Note, which will be incurred with respect to the Properties as a result of the occurrence of the Casualty, whichever the case may be, will be covered out of (1) the Net Proceeds, (2) the insurance coverage referred to in Section 5.1.1 (a) (ii), if applicable, or (3) by other funds of Borrower; (iii) Lender shall be satisfied that the Restoration will be completed on or before the earliest to occur of (1) the date six (6) months prior to the Stated Maturity Date, as extended pursuant to Section 2.7, (2) the earliest date required for such completion under the terms of any Lease, (3) such time as may be required under applicable Legal Requirements or (4) six (6) months prior to the expiration of the insurance coverage referred to in Section 5.1.1 (a) (ii); (iv) Borrower shall cause the affected Property and the use thereof after the Restoration to be in compliance with and permitted under all applicable Legal Requirements and such Property, after Restoration, shall be of the same character as prior to such damage or destruction; (v) the Restoration shall be done and completed by Borrower in an expeditious and diligent fashion and in compliance with all applicable Legal Requirements and the Renovation Standards; (vi) Borrower shall deliver, or cause to be delivered, to Lender a signed detailed budget approved in writing by Borrower’s architect or engineer stating the entire cost of completing the Restoration, which budget shall be reasonably acceptable to Lender and (vii) the Net Proceeds together with any cash or cash equivalent deposited by Borrower with Lender are sufficient in Lender’s discretion to cover the cost of the Restoration. (ii) The Net Proceeds shall be held by Lender in the Casualty and Condemnation Account and, until disbursed in accordance with the provisions of this Section 5.4(d), shall constitute additional security for the Debt and other obligations under the Loan Documents. The Net Proceeds shall be disbursed by Lender to, or as directed by, Borrower from time to time during the course of the Restoration, upon receipt of evidence satisfactory to Lender that (A) all materials installed and work and labor performed (except to the extent that they are to be paid for out of the requested disbursement) in connection with the Restoration have been paid for in full, and (B) there exist no notices of pendency, stop orders, mechanic’s or materialman’s liens or notices of intention to file same, or any other liens or encumbrances of any nature whatsoever on the Properties which have been fully bonded to the satisfaction of Lender and discharged of record or in the alternative fully insured to the satisfaction of Lender by the title company issuing the Title Insurance Policy. (iii) All plans and specifications required in connection with the Restoration shall be subject to the prior approval of Lender and an independent consulting engineer selected by Lender (the “Casualty Consultant”). Lender shall have the use of the plans and specifications and all permits, licenses and approvals required or obtained in connection with the Restoration. The identity of the contractors, subcontractors and materialmen engaged in the Restoration, as well as the contracts under which they have been engaged, shall be subject to the approval of Lender and the Casualty Consultant. All costs and expenses incurred by Lender in connection with recovering, holding and advancing the Net Proceeds for the Restoration including, without limitation, reasonable attorneys’ fees and disbursements and the Casualty Consultant’s fees and disbursements, shall be paid by Borrower. (iv) In no event shall Lender be obligated to make disbursements of the Net Proceeds in excess of an amount equal to the costs actually incurred from time to time for work in place as part of the Restoration, as certified by the Casualty Consultant, less the Casualty Retainage. The term “Casualty Retainage” shall mean, as to each contractor, subcontractor or materialman engaged in the Restoration, an amount equal to ten percent (10%) of the costs actually incurred for work in place as part of the Restoration, as certified by the Casualty Consultant, until the Restoration has been completed. The Casualty Retainage shall in no event, and notwithstanding anything to the contrary set forth above in this Section 5.4(d), be less than the amount actually held back by Borrower from contractors, subcontractors and materialmen engaged in the Restoration. The Casualty Retainage shall not be released until the Casualty Consultant certifies to Lender that the Restoration has been completed in accordance with the provisions of this Section 5.4(b) and that all approvals necessary for the re-occupancy and use of the Property have been obtained from all appropriate Governmental Authorities, and Lender receives evidence satisfactory to Lender that the costs of the Restoration have been paid in full or will be paid in full out of the Casualty Retainage; provided, however, that Lender will release the portion of the Casualty Retainage being held with respect to any contractor, subcontractor or materialman engaged in the Restoration as of the date upon which (x) the Casualty Consultant certifies to Lender that such contractor, subcontractor or materialman has satisfactorily completed all work and has supplied all materials in accordance with the provisions of such contractor’s, subcontractor’s or materialman’s contract, (y) the contractor, subcontractor or materialman delivers the lien waivers and evidence of payment in full of all sums due to the contractor, subcontractor or materialman as may be reasonably requested by Lender or by the title company issuing the Title Insurance Policy, and (z) Lender receives an endorsement to the Title Insurance Policy insuring the continued priority of the Lien of the Mortgage and evidence of payment of any premium payable for such endorsement. If required by Lender, the release of any such portion of the Casualty Retainage shall be approved by the surety company, if any, which has issued a payment or performance bond with respect to the contractor, subcontractor or materialman.
REPAIRED OR REPLACED PARTS / COMPONENTS Where the Contractor is required to repair, replace or substitute Product or parts or components of the Product under the Contract, the repaired, replaced or substituted Products shall be subject to all terms and conditions for new parts and components set forth in the Contract including Warranties, as set forth in the Additional Warranties Clause herein. Replaced or repaired Product or parts and components of such Product shall be new and shall, if available, be replaced by the original manufacturer’s component or part. Remanufactured parts or components meeting new Product standards may be permitted by the Commissioner or Authorized User. Before installation, all proposed substitutes for the original manufacturer’s installed parts or components must be approved by the Authorized User. The part or component shall be equal to or of better quality than the original part or component being replaced.
Outage Restoration If an outage on the Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades of the Connecting Transmission Owner or Developer adversely affects the other Party’s operations or facilities, the Party that owns the facility that is out of service shall use Reasonable Efforts to promptly restore such facility(ies) to a normal operating condition consistent with the nature of the outage. The Party that owns the facility that is out of service shall provide the other Party and NYISO, to the extent such information is known, information on the nature of the Emergency State, an estimated time of restoration, and any corrective actions required. Initial verbal notice shall be followed up as soon as practicable with written notice explaining the nature of the outage.
One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Xxxxx’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.
Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.
Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).
Heating The Hirer shall ensure that no unauthorised heating appliances shall be used on the premises when open to the public without the consent of the management committee. Portable Liquefied Propane Gas (LPG) heating appliances shall not be used.
Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.