Examples of Acceptance Decision in a sentence
Within 15 calendar days of receipt of the PMA by DCC and prior to the formal filing review, the PMA lead reviewer should answer the preliminary questions below, and complete the Inventory of Organizational and Administrative Elements within the Administrative Checklist to make an Acceptance Decision.
A range of specific information should be included in the Acceptance Decision documentation, including rationale and/or criteria for accepting or declining an offer.
Now, an Acceptance Decision Block (ADB) established for each bit compares the value of ΔEi for each state change with an appropriate random number (noise) and outputs a binary flag that takes on the value of 1 with the acceptance probability of Eq. (2).
Acceptance by the City of Greenville shall not be unreasonably withheld; but may be conditioned or delayed as required for reasonable review, evaluation, installation or testing, as applicable of the work or deliverable.
The purpose of this procedure is to establish the process for analysis of the results of Project Tests, when performed by the Contractor, through use NTTA’ s Owner Verification (OV) testing activities, to establish the methods of dispute resolution to form the basis of the NTTA’s Acceptance Decision of the materials incorporated into NTTA’s Projects, and to establish reporting requirements to NTTA.
Within 15 calendar days of receipt of the PMA by DCC and prior to the filing review, the PMA lead reviewer should answer the preliminary questions below, and complete the Inventory of Organizational and Administrative Elements within the Administrative Checklist to make an Acceptance Decision.
In this research, an application was made to a university faculty of education ethics committee, and the "Acceptance" Decision Document dated 01.12.2022 and numbered 42 was obtained.
Table 3.3: Validation and Material Quality Acceptance Decision Matrix Material QualityMathematicalValidationCQAFOVMaterial is considered mathematical validated and acceptable.No additional investigation needed.PassPassPassBoth the QA and OV test results pass specification limits:Although mathematical validation has not occurred, both the CQAF and OV Firm test results are passing the established specification limits.
The implementing procedures of a project will need to be compatible with the national and EU institutional framework and to be directly connected with the economic and physical integration of the project, based on the financing terms registered in the Subsidy Contract and the Acceptance Decision of the Project.
Outdoor exposures contribute to asthma morbidity and include pollutants such as ozone, particulate matter, nitrogen oxides, sulfur dioxide, and other outdoor antigens e.g. pollen (CDC 2001).