Examples of Affected System Network Upgrades in a sentence
For purposes of determining necessary Affected System Network Upgrades, the Affected System Study shall consider the level of interconnection service requested in megawatts by Affected System Interconnection Customer, unless otherwise required to study the full generating facility capacity due to safety or reliability concerns.
System Operator shall use Clustering in conducting the Affected System Study and shall use existing studies to the extent practicable, when multiple Affected System Interconnection Customers that are part of a single Cluster may cause the need for Affected System Network Upgrades.
For Affected System Interconnection Customers that are equally queued, the Affected System Queue Position shall have no bearing on the assignment of Affected System Network Upgrades identified in the applicable Affected System Study.
The term of this Agreement may be adjusted upon mutual agreement of the Parties if (1) the commercial operation date for the {generating facility} is adjusted in accordance with the rules and procedures established by {name of host transmission provider} or (2) the in-service date for the Affected System Network Upgrade(s) is adjusted in accordance with the rules and procedures established by System Operator and Interconnecting Transmission OwnerTransmission Provider.2.2.2 Termination Upon Default.
Such security for payment shall be in an amount sufficient to cover the costs for constructing, procuring, and installing the applicable portion of Affected System Network Upgrade(s) and shall be reduced on a dollar-for-dollar basis for payments made to Interconnecting Transmission Owner for these purposes.
Affected System Facilities Construction Agreement shall mean the agreement contained in Appendix 11 to this LGIP that is made between Interconnecting Transmission OwnerTransmission Provider and Affected System Interconnection Customer to facilitate the construction of and to set forth cost responsibility for necessary Affected System Network Upgrades on the New England Transmission SystemTransmission Provider’s Transmission System.
The CAISO will also coordinate with Affected System Operators under GIP Section 3.7 and GIP BPM Section 18.1. However, it is the IC that is responsible for contracting with the Affected System for construction of those Affected System Network Upgrades which are necessary to safely and reliably connect the proposed Generating Facility to the CAISO Controlled Grid.
Affected System Network Upgrades shall mean the additions, modifications, and upgrades to New England Transmission System required to accommodate Affected System Interconnection Customer’s proposed interconnection to a transmission system other than New England Transmission System.