Air Quality Permit definition
Examples of Air Quality Permit in a sentence
A dust collection system will be installed on the grain receiving system to limit particulate emissions as described in the Air Quality Permit application.
The Scheduled Permits constitute all Permits necessary for the continued ownership, use and operation of the Business consistent in all material respects with the past practices of the Dick▇▇▇ ▇▇▇up, except the Air Quality Permit and a Storm Water Discharge Permit for the Dick▇▇▇ ▇▇▇up operations at Belle Chas▇▇ ▇▇ set forth on Schedule 4.24.
This Facility is currently in Post Closure Care, has a small Air Quality Permit, and has a LFG gas collection system.
Submit application to Duke for review and approval two weeks prior to submitting to NC DENR, Dept of Air Quality Air Quality Permit for Ready-Mix Concrete Batch Plant As required EPC Contractor Permit will be obtained by concrete supplier.
Sheridan Press, Commonwealth of Pennsylvania Air Quality Permit No. 67-03033, effective June 1, 2002.
The Department alleges violations of the New Mexico Air Quality Control Act (“AQCA”), ▇▇▇▇ ▇▇▇▇, Sections 74-2-1 to -17; the Air Quality Control Regulations (“Regulations”) at Title 20, Chapter 2 NMAC, and Air Quality Permit Number P090-R2M1 (“Permit”).
Therefore, when submitting this application please indicate whether your generating facility will require an Air Quality Permit.
Exhibit E) Air Quality Permit for FRP Composite Liner Fabrication As required EPC Contractor Allows FRP contractor to use resins, styrene and other solvents in FRP fabrication facility.
All Permits required to operate the Facility as contemplated hereby shall have been obtained by, or transferred to Buyer, other than (i) such Permits, the failure of which to obtain could not reasonably be expected to have a Material Adverse Effect and, (ii) a non-temporary Pennsylvania Air Quality Permit as referenced in Section 1.41.
PERMITS TO BE OBTAINED BY SELLER Fuel Use Act Exemption Air Quality Permit to Construct Federal Energy Regulatory Commission Certification Local Zoning Permits (subject to Section 9.2) Local Siting Permits (subject to Section 9.2) Construction Permits APPENDIX D CONDENSATE QUALIFY STANDARDS Within three (3) months of the signing of this Agreement, al minimum of four (4) samples of process Condensate will be taken and analyzed.