Examples of AP1000 Nuclear Power Plant in a sentence
Within eighteen (18) months after finalization of the AP1000 Nuclear Power Plant design as specified in the then current Project Schedule, Contractor shall provide Owner with a list of Optional Spare Parts that are recommended by Contractor and vendors of Equipment comprising the Facility.
Within eighteen (18) months after finalization of the AP1000 Nuclear Power Plant design as specified in the then current Project Schedule, Contractor shall provide Owner with a list of spare parts for the Facility referred to as "Mandatory Spare Parts." The Parties shall determine a mutually agreeable price for such Mandatory Spare Parts, an estimate for which has been provided in Exhibit H.
Except as otherwise permitted hereunder, Contractor shall not take any action to give priority to the requested completion date of another customer for an AP1000 Nuclear Power Plant required under a contract between Contractor and such customer if, by taking such action to give priority to such other customer, Contractor shall not be able to meet the Guaranteed Substantial Completion Date of a Unit.
Accordingly, Contractor will give due consideration to the comments of the NuStart Engineering Committee to the Standard Plant Design Documentation and, to the extent consistent with such intent to preserve the standardization of the AP1000 Nuclear Power Plant, shall not unreasonably withhold its approval of any changes suggested by such comments.
Within eighteen (18) months after finalization of the AP1000 Nuclear Power Plant design as specified in the Project Schedule, Contractor shall provide Owner with the completed list of the Mandatory Spare Parts and their associated pricing.
In addition to AP1000 Nuclear Power Plant codes A, B, and C, the above applies to code D non-safety equipment being built to ASME Section III as the principal construction code defined in Table 3.2-3 of the DCD.
Table 1 details the responsibilities between the Owner (O) and Contractor (X) for providing the Site infrastructure, temporary facilities, buildings/ structures, plant systems, major equipment, modules and components which comprises each AP1000 Nuclear Power Plant.
Process Title Process Description Module Plan Document the process and infrastructure required for completion of module planning, design, procurement, fabrication and assembly, testing, delivery, storage, Site assembly, outfitting and installation to support construction of the AP1000 Nuclear Power Plant (the "AP1000").
The scope is to perform an assessment of the infrastructure required to support the construction of an AP1000 Nuclear Power Plant and to define the impacts on construction, modularization and the ability to transport fabrications to the Site.
Within eighteen (18) months after finalization of the AP1000 Nuclear Power Plant design as specified in the Project Schedule, Contractor shall provide Owner with a list and the associated costs of Optional Spare Parts that are recommended by Contractor and vendors of Equipment comprising the Facility.