Power Project definition

Power Project or “Project” shall mean the Wind Power generation facility of Contracted Capacity of ………..[Insert capacity] MW, located at [Insert name of the place] in …. [Insert name of the District and State] having a separate control system, metering and a single point of injection into the grid at Delivery/Interconnection/Metering point at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. This includes all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement;
Power Project or“Project” shall mean the Solar Power generation facility ofContracted Capacity having a separate control system,metering and separate points of injection into the grid atDelivery point. The Project shallinclude all units and auxiliaries such as water supply,treatment or storage facilities, bay(s) for transmissionsystem in the switchyard, dedicated electrical line upto the Delivery Point and all the other assets,buildings/structures, equipment, plant and machinery,facilities and related assets required for the efficient andeconomic operation of the power generation facility,whether completed or at any stage of development andconstructionorintendedtobedevelopedandconstructe dforthepurposeofsupplyofpowerasperthis Agreement;. “Preliminary DefaultNotice” shallhavethemeaningascribedtheretoinArticle13of thisAgreement;
Power Project means a power generation project identified by TCAP to supply electric energy to one or more TCAP Members.

Examples of Power Project in a sentence

  • The SPD shall undertake to establish, construct and operate the Solar Power Project in accordance with applicable Law, the Grid Code, relevant Guidelines of UPERC/CERC/CEA/MNRE/MoP and other relevant authorities, the terms and conditions of this Agreement and Prudent Utility Practices.

  • If a Force Majeure Event renders the Power Project no longer economically and technically viable and the insurers under the Insurances make payment on a “total loss” or equivalent basis, EDG shall have claim on such proceeds of such Insurance limited to outstanding dues of EDG against SPG.

  • The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost.

  • In case of the Project being financed through Financing Agreement(s), save as expressly provided in this Agreement or the Insurances, the proceeds of any insurance claim made due to loss or damage to the Power Project or any part of the Power Project shall be applied as per such Financing Agreements.

  • Designing, constructing, erecting, commissioning, completing and testing the Power Project in accordance with the applicable Law, the Grid Code, the terms and conditions of this Agreement and Prudent Utility Practices.


More Definitions of Power Project

Power Project or “Project” shall mean the solar power generation facility having separate points of injection into the grid at Inter-connection/Delivery/Metering Point or in case of sharing of transmission lines by separate injection at Pooling Point and having a separate boundary, control systems and metering. This includes all units and auxiliaries such as water supply, treatment or storage facilities, bay(s) for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility, whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power to SECI;
Power Project means the solar power generation facility of Installed Capacity of………..[Insert capacity ] MW, located at [Insert name of the place] in …. [Insert name of the District and State]; This includes all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, and all the other assets, buildings/structures, equipments, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement
Power Project or “Project” shall mean the Solar Power generation facility of Contracted Capacity having a separate control system, metering and separate points of injection into the grid at Delivery point. The Project shall include all units and auxiliaries such as water supply, treatment or storage facilities, bay(s) for transmission system in the switchyard, dedicated electrical line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility, whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement;.
Power Project or “Project” shall mean the solar power generation facility injecting solar power into the grid at Inter-connection Point. This includes all units and auxiliaries such as water supply, treatment or storage facilities, bay/s for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility, whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power to DISCOM(s) as per terms of the PPA;
Power Project means the Solar Power generation facility as per Schedule-I having separate points of injection into the grid at interconnection/metering point at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. Each project must also have separate control systems and metering.
Power Project means the solar power generation facility of Installed Capacity of [Insert capacity ] MW, located at Block no. [insert Block no.] of Pavagada Solar Park as per the published NIT; This includes all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement
Power Project or “Project” shall mean the power generation facility of Contracted Capacity of………..[Insert capacity] MW, located at , [Insert name of theDistrict and State] having a separate control system, metering and separate points of injection into the grid at Delivery point of 33/11 kV substation. The Project shall include all units and auxiliaries such as water supply, treatment or storage facilities, bay(s) for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility, whether completed or at any stage of developmentand construction or intended to be developed and constructed for the purposeof supply of power as per this Agreement; “Preliminary Default Notice” shall have the meaning ascribed thereto in Article 13 of this Agreement; “ProjectCapacity” shall mean the maximum AC capacity of the Project at the point of injectionon which the Power Purchase Agreement has been signed. "Prudent Utility Practices" shall mean the practices, methods and standards that are generally accepted internationally from time to time by electric utilities for the purpose of ensuring the safe, efficient and economic design, construction, commissioning, operation and maintenance of power generation equipment and which practices, methods and standards shall be adjusted as necessary, to take account of:a) operation and maintenance guidelines recommended by the manufacturers of the plant and equipment to be incorporated in the Power Project;b) the requirements of Indian Law; and the physical conditions at the siteof the Power Project “Rebate” shall have the same meaning as ascribed thereto in Article 10.3.5 of thisAgreement; "Rupees", "Rs.", “ ” shall mean Indian rupees, the lawful currency of India; “Scheduled Commissioning Date” or “SCD” ofthe Project Shall mean [Insert Date that is nine (9) Months from the Dateof issuance of LoA by the DISCOM to the RPG]; "Tariff" Shall have the same meaning as provided for in Article 9 of this Agreement; "Tariff Payment" shall mean the payments to be made under Monthly Bills as referred to inArticle 10 and the relevant Supplementary Bills; “TerminationNotice” shall mean the notice given by either Parties for termination of thisAgreement in accordance with Article 13 of this Agreement;