Asbestos hazard abatement project designer definition

Asbestos hazard abatement project designer means the person responsible for the oversight of asbestos hazard abatement activities or determination of the work scope, work sequence, or performance standards for an asbestos hazard abatement activity, including preparation of specifications, plans, and contract documents.

Examples of Asbestos hazard abatement project designer in a sentence

  • Asbestos hazard abatement project designer: The person responsible for the oversight of asbestos hazard abatement activities or determination of the work scope, work sequence, or performance standards for an asbestos hazard abatement activity, including preparation of specifications, plans, and contract documents.

Related to Asbestos hazard abatement project designer

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Floodplain or flood-prone area means any land area susceptible to being inundated by water from any source (see definition of “flood”).

  • Coastal high hazard area means a Special Flood Hazard Area extending from offshore to the inland limit of a primary frontal dune along an open coast and any other area subject to high velocity wave action from storms or seismic sources. The area is designated on a FIRM, or other adopted flood map as determined in Article 3, Section B of this ordinance, as Zone VE.

  • Area of special flood hazard means the land in the flood plain within a community subject to a one percent or greater chance of flooding in any given year.

  • Phase I Environmental Site Assessment means a Phase I environmental property assessment of the Assets that satisfies the basic assessment requirements set forth under the current ASTM International Standard Practice for Environmental Site Assessments (Designation E1527-13) or any other visual site assessment or review of records, reports or documents.

  • Flood-related erosion area management means the operation of an overall program of corrective and preventive measures for reducing flood-related erosion damage, including but not limited to emergency preparedness plans, flood-related erosion control works and floodplain management regulations.

  • Special Flood Hazard Area (SFHA means the land in the floodplain subject to a one percent (1%) or greater chance of being flooded in any given year, as determined in Article 3, Section B of this ordinance.

  • Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.

  • COVID-19 hazard means exposure to potentially infectious material that may contain SARS-CoV-2, the virus that causes COVID-19. Potentially infectious materials include airborne droplets, small particle aerosols, and airborne droplet nuclei, which most commonly result from a person or persons exhaling, talking or vocalizing, coughing, sneezing, or procedures performed on persons which may aerosolize saliva or respiratory tract fluids, among other things. This also includes objects or surfaces that may be contaminated with SARS-CoV-2.

  • Special Hazard Area means an area having special flood, mudslide (i.e., mudflow) and/or flood-related erosion hazards, and shown on an FHBM or FIRM as Zone A, AO, A1-30, AE, A99, or AH.

  • Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);

  • Environmental Hazard means any substance the presence, use, transport, abandonment or disposal of which (i) requires investigation, remediation, compensation, fine or penalty under any Applicable Law (including, without limitation, the Comprehensive Environmental Response Compensation and Liability Act, Superfund Amendment and Reauthorization Act, Resource Conservation Recovery Act, the Occupational Safety and Health Act and provisions with similar purposes in applicable foreign, state and local jurisdictions) or (ii) poses risks to human health, safety or the environment (including, without limitation, indoor, outdoor or orbital space environments) and is regulated under any Applicable Law.

  • Tidal Flood Hazard Area means a flood hazard area in which the flood elevation resulting from the two-, 10-, or 100-year storm, as applicable, is governed by tidal flooding from the Atlantic Ocean. Flooding in a tidal flood hazard area may be contributed to, or influenced by, stormwater runoff from inland areas, but the depth of flooding generated by the tidal rise and fall of the Atlantic Ocean is greater than flooding from any fluvial sources. In some situations, depending upon the extent of the storm surge from a particular storm event, a flood hazard area may be tidal in the 100-year storm, but fluvial in more frequent storm events.

  • Phase I Environmental Report means a report by an Independent Person who regularly conducts environmental site assessments in accordance with then current standards imposed by institutional commercial mortgage lenders and who has a reasonable amount of experience conducting such assessments.

  • Condominium Project Real estate including the separate ownership in fee, or on a satisfactory leasehold estate, of a particular residential unit with an indivisible interest in the real estate designated for common ownership strictly by unit owners.

  • Regulatory Flood Protection Elevation means the “Base Flood Elevation” plus the “Freeboard”. In “Special Flood Hazard Areas” where Base Flood Elevations (BFEs) have been determined, this elevation shall be the BFE plus two (2) feet of freeboard. In “Special Flood Hazard Areas” where no BFE has been established, this elevation shall be at least two (2) feet above the highest adjacent grade.

  • Underground source of drinking water means an aquifer or its portion:

  • Site Improvements means any construction work on, or improvement to, streets, roads, parking facilities, sidewalks, drainage structures and utilities.

  • EPA Hazardous Substance Superfund means the Hazardous Substance Superfund established by the Internal Revenue Code, 26 U.S.C. § 9507.

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Special Flood Hazard Area means an area that FEMA’s current flood maps indicate has at least a one percent (1%) chance of a flood equal to or exceeding the base flood elevation (a 100-year flood) in any given year.

  • Potential geologic hazard area means an area that:

  • Excavation zone means the volume containing the tank system and backfill material bounded by the ground surface, walls, and floor of the pit and trenches into which the UST system is placed at the time of installation.

  • Site area emergency means events may occur, are in progress, or have occurred that could lead to a significant release of radioactive material and that could require a response by off-site response organizations to protect persons off-site.

  • Condominium Plan means a plan described in Section 4285.