Auxiliary emission control strategy definition

Auxiliary emission control strategy or “AECS” means an emission control strategy that is activated and temporarily modifies a base emission control strategy (BECS) for a specific purpose and in response to a specific set of ambient and/or operating conditions and only remains in operation as long as those conditions exist;
Auxiliary emission control strategy means any element of design that senses temperature, engine RPM, or any other parameter for the purpose of activating, modulating, delaying, or deactivating the operation of any part of the emission control system;
Auxiliary emission control strategy or "AECS" means an emission control strategy that is activated and temporarily modifies a Base Emission Control Strategy (BECS) for a specific purpose and in response to a specific set of ambient and/or operating conditions and only remains in operation as long as those conditions exist;

Related to Auxiliary emission control strategy

  • Emission control system means the electronic engine management controller and any emission related component in the exhaust or evaporative system which supplies an input to or receives an output from this controller.

  • air traffic control service means a service provided for the purpose of:

  • aerodrome control service means air traffic control service for aerodrome traffic;

  • Qualifying Energy Efficiency Measures (EEMs) means either (i) standard gas or electric EEMs (i.e., measures found on any of the Standard Initiative applications); or (ii) measures eligible under the Custom Initiative approved by Ameren Illinois; or (iii) measures found in the Streetlighting or Retro-commissioning Initiative as identified in official program materials found on the Ameren Illinois Energy Efficiency website. The following technologies are not Qualifying EEMs: (i) technologies that do not demonstrate measurable and verifiable energy savings, including power conditioning; (ii) technologies that displace electrical energy use or natural gas to another fuel (i.e. fuel switching); or (iii) renewable energy projects (solar, wind power, etc.). Eligible gas measures do not include propane or butane measures.

  • Erosion and sediment control plan or "plan" means a document containing material for the conservation of soil and water resources of a unit or group of units of land. It may include appropriate maps, an appropriate soil and water plan inventory and management information with needed interpretations, and a record of decisions contributing to conservation treatment. The plan shall contain all major conservation decisions to ensure that the entire unit or units of land will be so treated to achieve the conservation objectives.

  • Air pollution control equipment means a mechanism, device, or contrivance used to control or prevent air pollution, that is not, aside from air pollution control laws and administrative regulations, vital to production of the normal product of the source or to its normal operation.

  • Traffic control signal means a device, whether manually, electrically, or mechanically operated, by which traffic is alternately directed to stop and permitted to proceed.

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • area control service means air traffic control service for controlled flights in control areas;

  • Acceptable earned value management system means an earned value management system that generally complies with system criteria in paragraph (b) of this clause.

  • Water control structure means a structure within, or adjacent to, a water, which intentionally or coincidentally alters the hydraulic capacity, the flood elevation resulting from the two-, 10-, or 100-year storm, flood hazard area limit, and/or floodway limit of the water. Examples of a water control structure may include a bridge, culvert, dam, embankment, ford (if above grade), retaining wall, and weir.

  • Project Management Plan means the portion of the Project Development Plan providing the information requested in Section 4.2 of Exhibit B to the ITP.

  • Quality Assurance Plan or “QAP” shall have the meaning set forth in Clause 11.2;

  • Maintenance Plan means a maintenance plan pursuant to N.J.A.C. 7:8-5.2(b) and 5.8 prepared by the design engineer for the stormwater management measures incorporated into the design of a major development.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • approach control service means air traffic control service for arriving or departing controlled flights;

  • Structural pest control means a use requiring a license under Chapter 14 (commencing with Section 8500), Division 3, of the Business and Professions Code.

  • Safety Management System means a systematic approach to managing safety, including the necessary organisational structures, accountabilities, policies and procedures;

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Vapor control system means a system that prevents release to the atmosphere of gasoline vapors in excess of 80 milligrams per liter of gasoline loaded (4.7 grains per liter).

  • Single Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in a single homogeneous phase and which does not require that the product container be shaken before use.

  • Quality control means the total of all activities performed by the Design-Builder, Designer, Construction Inspection Professional Engineering Firm and the Materials Testing Firm or Laboratory, subcontractors, producers or manufacturers to ensure that the Work performed by the Design-Builder conforms to the Contract requirements. For design, Quality Control activities shall include, but not be limited to, procedures for design quality, checking, design review including reviews for constructability, and review and approval of Working Plans. For construction, Quality Control activities shall include, but not be limited to, procedures for materials handling and construction quality, inspection, sampling and testing of materials both on site and at the plant(s), field testing of materials, obtaining and verifying Materials Certifications, record keeping, and equipment monitoring and calibration, production process control, and monitoring of environmental compliance. Quality Control also includes documentation of all QC design and construction efforts. The Scope of Work to be performed as part of the Quality Control task may be changed after the RFQ Phase.

  • State implementation plan or “SIP” means the plan adopted by the state of Iowa and approved by the Administrator which provides for implementation, maintenance, and enforcement of such primary and secondary ambient air quality standards as they are adopted by the Administrator, pursuant to the Act.

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Office of the Interconnection Control Center means the equipment, facilities and personnel used by the Office of the Interconnection to coordinate and direct the operation of the PJM Region and to administer the PJM Interchange Energy Market, including facilities and equipment used to communicate and coordinate with the Market Participants in connection with transactions in the PJM Interchange Energy Market or the operation of the PJM Region.

  • Double Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in two or more distinct phases that requires the product container be shaken before use to mix the phases, producing an emulsion.