Balanced cut and fill definition

Balanced cut and fill means no net increase in fill within the floodplain.

Examples of Balanced cut and fill in a sentence

  • Balanced cut and fill is required for permitted development in the Flood Management Area.

  • Any notice or other communication given pursuant to this Agreement must be in writing and (i) delivered personally, (ii) sent by facsimile transmission, (iii) or sent by registered mail, postage prepaid, to the address of the Party specified below..

  • These were:■ Balanced cut and fill option: This solution envisaged a balanced mix of cutting the surface of the Plain, in some cases up to a depth of approximately 25 to 30 metres, and filling the depressions and guts to create a level area for the airstrip and terminal buildings, and the use of this material to fill in Dry Gut to obtain the required airstrip length.

  • Balanced cut and fill means that if fill material is placed within the floodplain that an equal amount of material must be removed so that flood storage capacity is not decreased.

  • Balanced cut and fill must be designed in accordance with Simbithi principles of following the contours which means the balanced reshaping of the onsite soil to create platforms Importing of soil to create, excessive artificial, raised platforms is not allowed.

  • Passive solar layout and design ◆ Emphasis on natural daylighting ◆ Small size means small footprint ◆ Naturalized landscape ◆ In-town location for walking and biking ◆ Balanced cut and fill in constructionMaterialsLocally sourced materials ◆ Locally crafted artistic detail fabricationTechnologiesNew guest house addition has solar panels supplying hot water and radiant heating The Parker Huber house is a small sculptural gem that invites serene contemplation of the natural world.

  • Section 3 presents the results of the study for each of the four metrics.

  • The stages are broken down as follows:Stage 1:performing financial assets for which no significant impairment in credit risk has been observed with respect to the date of initial recognition, or with respect to which the credit risk is considered to be low.

  • Balanced cut and fill requires that any floodplain area that is filled with permanent material (such as emplacement of a bridge abutment) must be offset by an equal excavated area such that the net amount of floodplain storage is unchanged.Environmental Overlay Zone Regulations and Greenway Overlay Zone Regulations, which are described below.

  • Balanced cut and fill activity within the floodplain, with a Letter of Map Change, as required in this Code.

Related to Balanced cut and fill

  • Customer Property means the property, other than real property and IPR, including any equipment issued or made available to the Supplier by the Customer in connection with this Call Off Contract;

  • DQ List has the meaning specified in Section 10.06(g).