BC Hydro System definition
Examples of BC Hydro System in a sentence
In considering whether to give consent to the proposed change, the Buyer will be entitled to take into consideration whether and to what extent such change would increase the Buyer’s liability for any costs with respect to the BC Hydro System, the Seller’s Plant or any other project or otherwise increase the Buyer’s risk, including the scope and magnitude of Network Upgrades that may be triggered by the proposed change.
The amounts of Turn-Down Energy or Constraint Energy (if any) in any hour will be determined using methodology satisfactory to the Buyer, acting reasonably, based on the best available information, including readings of the Meter before and after the occurrence of the Turn-Down Period or BC Hydro System Constraint, as applicable, and readings of any equipment that measures the Energy Source for the period while the Turn-Down Period or BC Hydro System Constraint, as applicable, was in effect.
The POI means the point at which the Seller’s Plant indirectly interconnects with the BC Hydro System at the point of interconnection between the Third Party System and the BC Hydro System, as described in the Third Party Interconnection Agreement.
If the Seller’s Plant has an indirect interconnection to the BC Hydro System, amendments required to accommodate the indirect interconnection are noted in GREEN.