Bilateral Portion of System Costs definition

Bilateral Portion of System Costs means the Bilateral Funders’ portion of the System Costs.

Examples of Bilateral Portion of System Costs in a sentence

  • In addition, the following are deposited into Window 1: (a) any refunds from recipients, including the Trustee and Fund Office, regardless of the Window from which the funds were originally received, (b) any investment income generated by funds held in the CGIAR Fund, (c) the CSP amounts from Windows 2 and 3 and the Provisional Account, and (d) the Bilateral Portion of System Costs.

Related to Bilateral Portion of System Costs

  • Stand Alone System Upgrade Facilities means System Upgrade Facilities that a Developer may construct without affecting day-to-day operations of the New York State Transmission System during their construction. NYISO, the Connecting Transmission Owner and the Developer must agree as to what constitutes Stand Alone System Upgrade Facilities and identify them in Appendix A to this Agreement.

  • Start-Up Costs means all fees, costs, and expenses incurred in connection with establishing the State Mitigation Trust and the Indian Tribe Mitigation Trust and setting them up for operation. Start-up costs shall not include the cost of premiums for insurance policies.

  • Affected System Operator means an entity that operates an Affected System or, if the Affected System is under the operational control of an independent system operator or a regional transmission organization, such independent entity.

  • Affected System means an electric system other than the Transmission Provider’s Transmission System that may be affected by a proposed interconnection or on which a proposed interconnection or addition of facilities or upgrades may require modifications or upgrades to the Transmission System.

  • Operating Costs means the incremental expenses incurred by the Recipient on account of Project implementation, management, and monitoring, including for office space rental, utilities, and supplies, bank charges, communications, vehicle operation, maintenance, and insurance, building and equipment maintenance, advertising expenses, travel and supervision, salaries of contractual and temporary staff, but excluding salaries, fees, honoraria, and bonuses of members of the Recipient’s civil service.

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Scheduled Maintenance means any adjustment, repair, removal, disassembly, cleaning, or replacement of components or systems required by the manufacturer which is performed on a periodic basis to prevent part failure or equipment or engine malfunction, or anticipated as necessary to correct an overt indication of malfunction or failure for which periodic maintenance is not appropriate.

  • Fixed Costs means costs which do not vary with consumption or volume produced;

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Upgrade means the addition or retrofit of some systems such as cathodic protection, lining, or spill and overfill controls to improve the ability of an underground storage tank system to prevent the release of product.